David M Goray
- Based in
- Larkspur
- On San Francisco permits
- Feb 2012 to Sep 2026
- Last 24 months
- 4 permits filed
28 permits since 2000: 21 completed, 4 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Sep 2026 | 214 Bonview St | rev to pa# 2025-1002-6603: partial foundation replacement. structural modifications to the existing g+2 building including load assessment, reinforcement, and alterations. structural elements as per design.Details
rev to pa# 2025-1002-6603: partial foundation replacement. structural modifications to the existing g+2 building including load assessment, reinforcement, and alterations. structural elements as per design. | |
| Oct 21, 2025 | In progress issued Apr 2026 | 214 Bonview St | addition & renovation to main home w/ new bathroom and bedrooms added. renovation to apartment including partial renovation of kitchen & bathroom.Details
addition & renovation to main home w/ new bathroom and bedrooms added. renovation to apartment including partial renovation of kitchen & bathroom. | $487,945 |
| Oct 1, 2025 | Completed final sign-off Apr 2026 | 70 Bradford St | partial remodel to single family home to include kitchen and bathroomDetails
partial remodel to single family home to include kitchen and bathroom | $125,000 |
| Oct 15, 2024 | In progress issued Oct 2024 | 1267 Sanchez St | south wall lightwell dry rot repair. replace 3 windows. check electrical update panel.Details
south wall lightwell dry rot repair. replace 3 windows. check electrical update panel. | $12,000 |
| Oct 6, 2023 | Completed final sign-off May 2024 | 80 San Andreas Wy | remodel one kitchen and two bathrooms in-kind. update with new cabinets + fixtures. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k)3 and (k)5.Details
remodel one kitchen and two bathrooms in-kind. update with new cabinets + fixtures. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0 (k)3 and (k)5. | $15,000 |
| Oct 2, 2023 | In progress issued Aug 2024 | 45 Eagle St | legalize lower unit to comply with nov 20230134 per ord 43-14.Details
legalize lower unit to comply with nov 20230134 per ord 43-14. | $10,000 |
| Dec 8, 2022 | Completed final sign-off Jan 2024 | 1720 Lake St | gr fl single family dwelling, enclose tunnel entry, add mudroom. new window in e openings at entry/stairs, remove door to stairs 2nd flDetails
gr fl single family dwelling, enclose tunnel entry, add mudroom. new window in e openings at entry/stairs, remove door to stairs 2nd fl | $5,000 |
| Aug 23, 2022 | Expired or cancelled withdrawn Dec 2022 | 1720 Lake St | new framing, drywall, windows, and floors for entryway. new electrical to code. new cabinets, and plumbing to code in laundry room. new duct work in entry to code.Details
new framing, drywall, windows, and floors for entryway. new electrical to code. new cabinets, and plumbing to code in laundry room. new duct work in entry to code. | $100,000 |
| Oct 19, 2021 | Completed final sign-off Apr 2022 | 934 Church St | revision to pa 202106233074. remove portion of existing shearwall at 2/f.Details
revision to pa 202106233074. remove portion of existing shearwall at 2/f. | |
| Oct 1, 2021 | Completed final sign-off Jun 2022 | 266 Amber Dr | infill of an existing lightwell, not visible from other properties up to first story roof line. interior remodeling to include addition of a new home gym within lighwell at first fl and creation of a new wall through closet, and remodeling (e) bathroom at lower fl.Details
infill of an existing lightwell, not visible from other properties up to first story roof line. interior remodeling to include addition of a new home gym within lighwell at first fl and creation of a new wall through closet, and remodeling (e) bathroom at lower fl. | $45,000 |
| Jun 23, 2021 | Completed final sign-off Apr 2022 | 934 Church St | interior alteration: remodel kitchen. no structural work.Details
interior alteration: remodel kitchen. no structural work. | $15,000 |
| Jun 15, 2021 | Completed final sign-off Jun 2022 | 2658 23rd Av | remodel lower level build out ground level under finished level aboveDetails
remodel lower level build out ground level under finished level above | $27,000 |
| Oct 29, 2020 | Completed final sign-off Mar 2025 | 767 18th Av | adu ordinance# 95-17, add adu at garage level withing (e) building enclosure.Details
adu ordinance# 95-17, add adu at garage level withing (e) building enclosure. | $60,000 |
| Jul 31, 2020 | Completed final sign-off Dec 2020 | 405 Broderick St | kitchen (10.5x12.5) and bathroom (10.5x5.5) remodel, in-kind.Details
kitchen (10.5x12.5) and bathroom (10.5x5.5) remodel, in-kind. | $30,000 |
| May 12, 2020 | Completed final sign-off Jan 2021 | 1753 Page St | repair water damage to interior office space. check for mold and dry rot. replace deck waterproofing. all repair/replacement work in-kind.Details
repair water damage to interior office space. check for mold and dry rot. replace deck waterproofing. all repair/replacement work in-kind. | $6,000 |
| Nov 18, 2019 | Completed final sign-off Mar 2020 | 2400 Webster St | unit #2 - bathroom remodel in-kindDetails
unit #2 - bathroom remodel in-kind | $10,000 |
| Oct 7, 2019 | Never finaled issued Oct 2019, no final | 5 Central Av | remodel kitchen replace cabinets and appliances.Details
remodel kitchen replace cabinets and appliances. | $13,000 |
| Sep 23, 2019 | Completed final sign-off Dec 2019 | 875 La Playa | replace toilet and sink, new vanity, new tile floor. bathroom remodel in kind.Details
replace toilet and sink, new vanity, new tile floor. bathroom remodel in kind. | $3,000 |
| Jul 2, 2019 | Completed final sign-off Oct 2019 | 3454 Pierce St | remodel kitchen, new cabinets, led lights, new sink, tile. no change of e floor planDetails
remodel kitchen, new cabinets, led lights, new sink, tile. no change of e floor plan | $15,000 |
| May 24, 2019 | Completed final sign-off Feb 2020 | 882 48th Av | update bathroom - new shower, tile & floor. new led lights gfi. 40 sq ft. new plumbing fixturesDetails
update bathroom - new shower, tile & floor. new led lights gfi. 40 sq ft. new plumbing fixtures | $10,000 |
| Mar 8, 2019 | Completed final sign-off Jun 2019 | 240 Mallorca Wy | replace shower pan, new tile, new led lighting.Details
replace shower pan, new tile, new led lighting. | $4,000 |
| Mar 4, 2019 | Completed final sign-off Jul 2019 | 235 Waller St | refresh bathroom - new tile and plumbing fixtures make sure all codes are enforced. change tub to shower. 30 sq ftDetails
refresh bathroom - new tile and plumbing fixtures make sure all codes are enforced. change tub to shower. 30 sq ft | $8,000 |
| Nov 19, 2018 | Completed final sign-off Feb 2019 | 2945 Pacific Av | unit 1. bathroom remodel w/ addition of new shower.Details
unit 1. bathroom remodel w/ addition of new shower. | $30,000 |
| May 1, 2018 | Never finaled issued Jun 2023, no final | 2755 Harrison St | permit to comply w/ nov #201396191 legalize an illegal unit in basementDetails
permit to comply w/ nov #201396191 legalize an illegal unit in basement | $85,000 |
| Mar 7, 2018 | Completed final sign-off Jun 2018 | 342 Granada Av | bathroom remodel - replace shower pan, repair dryrot, new plumbing fixtures, new led lighting.Details
bathroom remodel - replace shower pan, repair dryrot, new plumbing fixtures, new led lighting. | $8,000 |
| Jan 24, 2018 | Completed final sign-off Feb 2018 | 266 Amber Dr | refresh kitchen, new counter tops, appliances, cabinets to be painted, upgrade lighting to ledDetails
refresh kitchen, new counter tops, appliances, cabinets to be painted, upgrade lighting to led | $10,000 |
| Dec 31, 2015 | Completed final sign-off Jun 2016 | 65 Alpine Tr | enlarge (e) opening between kitchen & family room; replace (e) french door with new - 8" wider doors; replace cabinetry & counters in kitchenDetails
enlarge (e) opening between kitchen & family room; replace (e) french door with new - 8" wider doors; replace cabinetry & counters in kitchen | $120,000 |
| Feb 6, 2012 | Completed final sign-off Oct 2012 | 3615 Buchanan St | unit #303-minor interior remodeling including conclidating closets in master bedrm, eliminating jacuzzi tub in master bathrm & replace with shower, create dresser alcove in master bedrm, remove (e) doors in bedrm #2 closet, enlarge door opening & replace with bi pass sliding doorsDetails
unit #303-minor interior remodeling including conclidating closets in master bedrm, eliminating jacuzzi tub in master bathrm & replace with shower, create dresser alcove in master bedrm, remove (e) doors in bedrm #2 closet, enlarge door opening & replace with bi pass sliding doors | $12,000 |