Data Processing Air Corp.
- Based in
- Pleasanton
- On San Francisco permits
- Sep 2002 to Jan 2018
- Last 24 months
- 0 permits filed
12 permits since 2000: 7 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 23, 2018 | Completed final sign-off Aug 2018 | 200 Paul Av | replace extg 7 crac units and 3 drycooler with like per like equipment. ref #201708306380Details
replace extg 7 crac units and 3 drycooler with like per like equipment. ref #201708306380 | $700,000 |
| Aug 30, 2017 | Completed final sign-off Aug 2018 | 200 Paul Av | t-mobile switch station: provide a new 22 ton norminal liebert crac unit in the hvac and fire rm to serve the existing equipment rm. provide upgrade to bms system. provide new electrical connection for new crac.Details
t-mobile switch station: provide a new 22 ton norminal liebert crac unit in the hvac and fire rm to serve the existing equipment rm. provide upgrade to bms system. provide new electrical connection for new crac. | $120,000 |
| Dec 14, 2016 | Completed final sign-off Jan 2017 | 274 Brannan St | permit revision to pa 2016-1026-1204: eliminate relocation/re-use of (e) window in (n) 1-hr fire rated partitionDetails
permit revision to pa 2016-1026-1204: eliminate relocation/re-use of (e) window in (n) 1-hr fire rated partition | |
| Oct 26, 2016 | Never finaled issued Nov 2016, no final | 274 Brannan St | partial ti including removal and addition of non load bearing partitions, ceilings, finishes. accessibility upgrades, fire sprinkler and alarms under separate permit.Details
partial ti including removal and addition of non load bearing partitions, ceilings, finishes. accessibility upgrades, fire sprinkler and alarms under separate permit. | $383,104 |
| Oct 21, 2016 | Expired or cancelled cancelled Jan 2026 | 274 Brannan St | suite 315, 3rd floor - demo several wallsDetails
suite 315, 3rd floor - demo several walls | $10,000 |
| Jun 13, 2014 | Completed final sign-off Oct 2014 | 274 Brannan St | addition of one (1) new 15 ton ac unit on 3rd floor computer room with remote condenser on roof. n/a ordinance #155-13Details
addition of one (1) new 15 ton ac unit on 3rd floor computer room with remote condenser on roof. n/a ordinance #155-13 | $86,000 |
| Apr 11, 2014 | Expired or cancelled cancelled Jan 2022 | 334 Mason St | replace 2 five ton air conditioners for unmanned cell site. condensing unit to be located in north light well. rather than extg in south light well.n/a for the maher ordinance #155-13Details
replace 2 five ton air conditioners for unmanned cell site. condensing unit to be located in north light well. rather than extg in south light well.n/a for the maher ordinance #155-13 | $28,978 |
| Jun 20, 2013 | Completed final sign-off Nov 2013 | 450 Mission St | new hot water boiler on roof to serve water source heat pump loop. ref pa #2013.05.14.6881Details
new hot water boiler on roof to serve water source heat pump loop. ref pa #2013.05.14.6881 | |
| May 14, 2013 | Completed final sign-off Oct 2013 | 450 Mission St | 5th floor:gas line from basement to roof for boiler and down to 5th floor for kitchen range.Details
5th floor:gas line from basement to roof for boiler and down to 5th floor for kitchen range. | $37,000 |
| Apr 30, 2008 | Completed final sign-off Jun 2008 | 200 Paul Av | 1) furnish and install 20 ton glycol liebert unit on 3rd floor 2) tap into (e) glycol lines 3) rework supply and drain lines as needed, liebert model #dh267w with seismic floor stand.Details
1) furnish and install 20 ton glycol liebert unit on 3rd floor 2) tap into (e) glycol lines 3) rework supply and drain lines as needed, liebert model #dh267w with seismic floor stand. | $25,000 |
| Oct 18, 2007 | Never finaled issued Oct 2007, no final | 274 Brannan St | furnish & install 1 3-ton liebert data mate split system in basement with condenser unit. furnish & install 1 new 50 amp circuit breaker in (e) panel 1 cm. located on 1/f. rework supply & drain lines as needed.Details
furnish & install 1 3-ton liebert data mate split system in basement with condenser unit. furnish & install 1 new 50 amp circuit breaker in (e) panel 1 cm. located on 1/f. rework supply & drain lines as needed. | $15,000 |
| Sep 23, 2002 | Expired or cancelled expired Mar 2004 | 274 Brannan St | set and anchor 2 i beams,relocate batteries from 1 side to other on 3rd floorDetails
set and anchor 2 i beams,relocate batteries from 1 side to other on 3rd floor | $9,000 |