Daniel Awand Build And Design
- Based in
- San Francisco
- On San Francisco permits
- Feb 2013 to Jul 2025
- Last 24 months
- 1 permit filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 2, 2025 | Completed final sign-off Dec 2025 | 2953 Pacific Av | interior renovation of e) kitchen & bathroom within e) residential unit. no structural changes or relocation of plumbingDetails
interior renovation of e) kitchen & bathroom within e) residential unit. no structural changes or relocation of plumbing | $50,000 |
| Oct 18, 2022 | Completed final sign-off Jan 2023 | 106 Peralta Av | improve utility room at the rear of the lower unit, insulate exterior walls add drywall 5/8 to (3) ext walls, add 2 light fixtures, remove 1light fixture tile sheetrock walls add outle (1) add support for additional load see s1Details
improve utility room at the rear of the lower unit, insulate exterior walls add drywall 5/8 to (3) ext walls, add 2 light fixtures, remove 1light fixture tile sheetrock walls add outle (1) add support for additional load see s1 | $7,000 |
| Feb 16, 2022 | Completed final sign-off Jan 2023 | 106 Peralta Av | kitchen remodel. remove and replace existing cabinetry and fixtures. bathroom remdel. replace existing vanity, sink, and faucet. exisiting tub to remain. re-tile shower walls. install bath fan. upgrade existing circuits in ktichen and bath in compliance with sf bldg requirements.Details
kitchen remodel. remove and replace existing cabinetry and fixtures. bathroom remdel. replace existing vanity, sink, and faucet. exisiting tub to remain. re-tile shower walls. install bath fan. upgrade existing circuits in ktichen and bath in compliance with sf bldg requirements. | $88,000 |
| Jul 5, 2013 | Completed final sign-off Dec 2013 | 2354 48th Av | bathroom remodel. relocate/replace tub, toilet & vanity. upgrade water supply to copper, upgrade electrical-run 15a circuit for recessed lighting install 5/8" sheetrock. relocate vanity light. install new tile enclosure & flooring.Details
bathroom remodel. relocate/replace tub, toilet & vanity. upgrade water supply to copper, upgrade electrical-run 15a circuit for recessed lighting install 5/8" sheetrock. relocate vanity light. install new tile enclosure & flooring. | $25,000 |
| May 15, 2013 | Completed final sign-off Aug 2013 | 147 Graystone Tr | revision to appl #2013.05.03.6060 - remove existing non-load bearing walls in bathroom 2x6 stud wall w/5/8 cdx plywood on side of interior wall, 1 layer of 3/4" cdx ply on each side of 1x stud for new entry point.Details
revision to appl #2013.05.03.6060 - remove existing non-load bearing walls in bathroom 2x6 stud wall w/5/8 cdx plywood on side of interior wall, 1 layer of 3/4" cdx ply on each side of 1x stud for new entry point. | $1,000 |
| May 3, 2013 | Completed final sign-off Aug 2013 | 147 Graystone Tr | remove non load bearing wall between kitchen & dining room. relocate electrical in wall being removedDetails
remove non load bearing wall between kitchen & dining room. relocate electrical in wall being removed | $2,000 |
| Feb 12, 2013 | Completed final sign-off Aug 2013 | 147 Graystone Tr | re-locate 4" toilet drain, relocate 1.5" sink drain, replace existing shower drain with 2" troughh drain (pro-line). install 4 tittle 23 compliant recessed lights. relocate vanity light. install heated floor mat and themostatic control. lighting per cec 150(k)Details
re-locate 4" toilet drain, relocate 1.5" sink drain, replace existing shower drain with 2" troughh drain (pro-line). install 4 tittle 23 compliant recessed lights. relocate vanity light. install heated floor mat and themostatic control. lighting per cec 150(k) | $40,000 |