D W Nicholson Corporation
- Based in
- Hayward
- On San Francisco permits
- Nov 2017 to Apr 2025
- Last 24 months
- 1 permit filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 4, 2025 | Completed final sign-off Oct 2025 | 1685 Haight St | exterior roll down security shutter installed.Details
exterior roll down security shutter installed. | $12,700 |
| Jun 29, 2023 | Completed final sign-off Feb 2024 | 1835 Franklin St | roof structural support for control decent apparatus as authorized by calosha and misc. metal for new guardrail and stair penthouse access ladder.Details
roof structural support for control decent apparatus as authorized by calosha and misc. metal for new guardrail and stair penthouse access ladder. | $180,000 |
| Feb 10, 2021 | Completed final sign-off Nov 2023 | 785 Market St | revision of elevator modenization pa #2020 0909 3817/r1. includes modification to finish flr elevations. elimination ofa ramp add addition of a slope walk, and the addition of a new stair vesitbule. work in basement level.Details
revision of elevator modenization pa #2020 0909 3817/r1. includes modification to finish flr elevations. elimination ofa ramp add addition of a slope walk, and the addition of a new stair vesitbule. work in basement level. | |
| Nov 8, 2017 | Completed final sign-off Sep 2018 | 116 New Montgomery St | 9/f roof- revision to pa#201607142351, add lateral bracing to supports for davits. all construction is below (e) parapet. n/a ordinance #155-13Details
9/f roof- revision to pa#201607142351, add lateral bracing to supports for davits. all construction is below (e) parapet. n/a ordinance #155-13 | $20,000 |