D R Construction & Electrical
- Based in
- Burlingame
- On San Francisco permits
- Oct 2007 to Sep 2015
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2015 | Never finaled issued Sep 2015, no final | 115 San Anselmo Av | bathroom repair. install bath tub, install vanity & toilet. install ceramic tile.Details
bathroom repair. install bath tub, install vanity & toilet. install ceramic tile. | $15,000 |
| Oct 9, 2007 | Never finaled issued Oct 2007, no final | 56 Nebraska St | window replacement 7 at front and side awning repair(above front wndw)Details
window replacement 7 at front and side awning repair(above front wndw) | $8,500 |