D L Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2017 to May 2026
- Last 24 months
- 3 permits filed
16 permits since 2000: 12 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 7, 2026 | Completed final sign-off May 2026 | 1555 41st Av | revision to pa#202604038818(202412207275), remove unpermitted skylightDetails
revision to pa#202604038818(202412207275), remove unpermitted skylight | |
| Apr 3, 2026 | Completed final sign-off May 2026 | 1555 41st Av | to obtain final inspection for work approved under pa# 202412207275. all work is complete.Details
to obtain final inspection for work approved under pa# 202412207275. all work is complete. | |
| Dec 20, 2024 | Expired or cancelled expired Apr 2026 | 1555 41st Av | rehabilitate (e) bathroom at 2/f. install 2nd bathroom at 2/f. rahabilitate (e) bath 1. install new storage, laundry, and bathroom at 1/f. 1/f not habitable due to insufficient head height.Details
rehabilitate (e) bathroom at 2/f. install 2nd bathroom at 2/f. rahabilitate (e) bath 1. install new storage, laundry, and bathroom at 1/f. 1/f not habitable due to insufficient head height. | $60,000 |
| Nov 9, 2023 | Expired or cancelled expired Jan 2026 | 43 Diamond St | interior remodel only: convert (e) family room & bedroom to be a (n) adu at 1st flr. add (n) kitchen, convert half bath to be a (n) full bathroom. no structural changes, all other details shall refer to pa# 2003-0114-5180Details
interior remodel only: convert (e) family room & bedroom to be a (n) adu at 1st flr. add (n) kitchen, convert half bath to be a (n) full bathroom. no structural changes, all other details shall refer to pa# 2003-0114-5180 | $40,000 |
| Nov 30, 2022 | Completed final sign-off May 2025 | 2036 Palou Av | proposed remodeling convert (e) living room to a (n) bedroom and adding two new bedrooms and a new full bathroom on the first floor. rebuild (e) skylight. remove one front window.Details
proposed remodeling convert (e) living room to a (n) bedroom and adding two new bedrooms and a new full bathroom on the first floor. rebuild (e) skylight. remove one front window. | $20,000 |
| Sep 21, 2022 | Completed final sign-off Aug 2023 | 336 Baltimore Wy | 1st fl: legalize (e) bedroom and bathroom, add bedroom, and bathroom. 2nd fl add bathroom to master bedroom.Details
1st fl: legalize (e) bedroom and bathroom, add bedroom, and bathroom. 2nd fl add bathroom to master bedroom. | $60,000 |
| Mar 30, 2021 | Completed final sign-off Sep 2021 | 681 40th Av | adding a 5' x 5' bathroom at existing open space on 1st floor.Details
adding a 5' x 5' bathroom at existing open space on 1st floor. | $10,000 |
| Jul 27, 2020 | Never finaled issued Oct 2020, no final | 366 Head St | 1st fl: convert existing bedroom to family room & add a full bathroom. 2nd fl: add a door to existing bathroom & relocate laundry.Details
1st fl: convert existing bedroom to family room & add a full bathroom. 2nd fl: add a door to existing bathroom & relocate laundry. | $25,000 |
| Jun 13, 2020 | Completed final sign-off Oct 2020 | 491 Sanchez St | bathroom remodel in-kind only. work to be performed in unit 491 sanchez st. only. replace the bathtub, vanity, and toilet.Details
bathroom remodel in-kind only. work to be performed in unit 491 sanchez st. only. replace the bathtub, vanity, and toilet. | $5,000 |
| Dec 24, 2019 | Completed final sign-off Mar 2020 | 1222 34th Av | 2nd fl kitchen and bath remodel, replace counter top, tiles, cabinets. no structural work.Details
2nd fl kitchen and bath remodel, replace counter top, tiles, cabinets. no structural work. | $20,000 |
| Sep 23, 2019 | Completed final sign-off Mar 2020 | 1337 Ortega St | remodel existing kitchen and bathroom. change cabinets and countertop. change tub, vanity, and toilet. no floor plan changeDetails
remodel existing kitchen and bathroom. change cabinets and countertop. change tub, vanity, and toilet. no floor plan change | $20,000 |
| Jun 17, 2019 | Completed final sign-off Oct 2019 | 1847 Stockton St | work in common area - replace 10 sq. ft. siding, add (2) lights, replace 6-foot ventDetails
work in common area - replace 10 sq. ft. siding, add (2) lights, replace 6-foot vent | $1,200 |
| Jun 17, 2019 | Completed final sign-off Aug 2019 | 101 Midcrest Wy | replace front stairway tiles in-kind (ceramic).Details
replace front stairway tiles in-kind (ceramic). | $5,000 |
| Jan 25, 2019 | Completed final sign-off Jun 2019 | 101 Midcrest Wy | remodel existing kitchen and bathroom. change cabinets, counter top, tiles and tub/shower, vanity. kitchen 12x12. bathroom 5x8Details
remodel existing kitchen and bathroom. change cabinets, counter top, tiles and tub/shower, vanity. kitchen 12x12. bathroom 5x8 | $18,000 |
| Sep 18, 2018 | Never finaled issued Oct 2018, no final | 3780 25th St | new footing for (e) post at garageDetails
new footing for (e) post at garage | $2,000 |
| May 10, 2017 | Completed final sign-off Oct 2017 | 132 Douglass St | bathroom addition at 2nd flr, closet reconstruction, close wall, and open doorway btwn kitchen and dining rm. remove staircase to attic and add drop down ladder.Details
bathroom addition at 2nd flr, closet reconstruction, close wall, and open doorway btwn kitchen and dining rm. remove staircase to attic and add drop down ladder. | $35,000 |