D-Finity Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2017 to Aug 2021
- Last 24 months
- 0 permits filed
21 permits since 2000: 19 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2021 | Completed final sign-off Jul 2022 | 91 Knollview Wy | replace two (2) front windows with wood clad equivalents. replace three (3) back windows with vinyl clad equivalents.Details
replace two (2) front windows with wood clad equivalents. replace three (3) back windows with vinyl clad equivalents. | $11,750 |
| Oct 3, 2020 | Expired or cancelled expired Aug 2023 | 25 Cyril Magnin St | rev to pa201907035096: to show plans of work done to repair fire and water damage of non-load bearing walls and replace damaged electrical wires at corridors in basement level. includes elevator upgrades for path of travel per 11b-202.4. ref fire report 38005. maher n/aDetails
rev to pa201907035096: to show plans of work done to repair fire and water damage of non-load bearing walls and replace damaged electrical wires at corridors in basement level. includes elevator upgrades for path of travel per 11b-202.4. ref fire report 38005. maher n/a | |
| Nov 6, 2019 | Completed final sign-off Jan 2020 | 615 21st Av | stucco repair at the ground floor. repair/replace in kind.Details
stucco repair at the ground floor. repair/replace in kind. | $3,000 |
| Jul 3, 2019 | Completed final sign-off Aug 2023 | 25 Cyril Magnin St | to comply with nov #201963861, repair fire damage sheetrock, door & repaint area on basement and 1st fl. repair pipe & waterline on 1st fl & basement. preliminary work.Details
to comply with nov #201963861, repair fire damage sheetrock, door & repaint area on basement and 1st fl. repair pipe & waterline on 1st fl & basement. preliminary work. | $20,000 |
| Jul 1, 2019 | Completed final sign-off Jul 2019 | 1746 Wawona St | repair siding and install new siding on 1746 wawona side. repair in kind.Details
repair siding and install new siding on 1746 wawona side. repair in kind. | $3,000 |
| May 7, 2019 | Completed final sign-off Sep 2019 | 532 40th Av | repair & install siding on left, back & right on 532-534 40th ave. sf ca 94132Details
repair & install siding on left, back & right on 532-534 40th ave. sf ca 94132 | $35,000 |
| Apr 26, 2019 | Completed final sign-off Aug 2019 | 806 46th Av | revision to pa 201901110147Details
revision to pa 201901110147 | $4,000 |
| Apr 22, 2019 | Completed final sign-off Jun 2019 | 2320 30th Av | propose to replace 5 street front windows with aluminum-clad wood window. wood to alm clad window. propose to replace 5 side windows with aluminum clad wood windows. wood to alm clad wood window.Details
propose to replace 5 street front windows with aluminum-clad wood window. wood to alm clad window. propose to replace 5 side windows with aluminum clad wood windows. wood to alm clad wood window. | $8,000 |
| Feb 8, 2019 | Completed final sign-off Jul 2019 | 166 Vernon St | replace furnace under stairwell 2 hr fire rated in existing space. provide combustion air per cmc ch 7. gas vent per cmc 802.6 and sfmc 802.6.2Details
replace furnace under stairwell 2 hr fire rated in existing space. provide combustion air per cmc ch 7. gas vent per cmc 802.6 and sfmc 802.6.2 | |
| Jan 11, 2019 | Completed final sign-off Aug 2019 | 806 46th Av | 1/f: 2 new bedrooms, 1 new bath, home office. 2/f: relocate kitchen, remodel bath, new master bathrooms and new lighting fixtures outlets' new exterior door & replace (e) windows in-kind: comply w/nov 201585872 dated 1/12/2016Details
1/f: 2 new bedrooms, 1 new bath, home office. 2/f: relocate kitchen, remodel bath, new master bathrooms and new lighting fixtures outlets' new exterior door & replace (e) windows in-kind: comply w/nov 201585872 dated 1/12/2016 | $75,000 |
| Nov 13, 2018 | Expired or cancelled withdrawn Oct 2019 | 773 Divisadero St | add disable bathroomDetails
add disable bathroom | $5,000 |
| Oct 12, 2018 | Completed final sign-off Apr 2019 | 50 Laguna St | unit 404 - convert existing kitchen to bedroom; rehabilitate existing kitchen and bathroom. install washer and dryerDetails
unit 404 - convert existing kitchen to bedroom; rehabilitate existing kitchen and bathroom. install washer and dryer | $37,000 |
| Sep 7, 2018 | Completed final sign-off Mar 2019 | 845 California St | #604- rehabilitate (e) kitchen and bathroom install w/dDetails
#604- rehabilitate (e) kitchen and bathroom install w/d | $30,000 |
| Sep 7, 2018 | Completed final sign-off Apr 2019 | 400 Duboce Av | #118- rehabilitate (e) kitchen and bathroom install w/dDetails
#118- rehabilitate (e) kitchen and bathroom install w/d | $30,000 |
| Aug 9, 2018 | Completed final sign-off Dec 2018 | 845 California St | unit 607 - rehabilitate existing kitchen & bathroom, install washer/dryerDetails
unit 607 - rehabilitate existing kitchen & bathroom, install washer/dryer | $30,000 |
| Aug 9, 2018 | Completed final sign-off Mar 2019 | 645 Stockton St | convert existing dining to bedroom, rehabilitate existing kitchen and bathroom. install washer/dryer. all work is non-structural only.Details
convert existing dining to bedroom, rehabilitate existing kitchen and bathroom. install washer/dryer. all work is non-structural only. | $30,000 |
| Mar 23, 2018 | Completed final sign-off Aug 2018 | 915 Pierce St | unit 203 - convert existing living room to bedroom; relocate living room; rehabilitate existing bathroom and install washer & dryer. no exterior workDetails
unit 203 - convert existing living room to bedroom; relocate living room; rehabilitate existing bathroom and install washer & dryer. no exterior work | $32,000 |
| Mar 16, 2018 | Completed final sign-off Apr 2018 | 755 Green St | remodel 2nd floor-unit 2c. remove carpet and install new laminate floor. replace countertop, kitchen facuet and new appliances. replace toilet, bathroom tile and vanity lights. comply w/ cenc 150.0 (k). no structural work.Details
remodel 2nd floor-unit 2c. remove carpet and install new laminate floor. replace countertop, kitchen facuet and new appliances. replace toilet, bathroom tile and vanity lights. comply w/ cenc 150.0 (k). no structural work. | $6,000 |
| Mar 16, 2018 | Completed final sign-off May 2018 | 755 Green St | remodel 2nd floor-unit 2e. add new washer/ventless dryer. remove carpet and install new laminate floor. replace countertop, kitchen faucet and new appliances. replace toilet, bathroom tiles and vanity lights. comply w/ cec 150.0 (k). no structural work.Details
remodel 2nd floor-unit 2e. add new washer/ventless dryer. remove carpet and install new laminate floor. replace countertop, kitchen faucet and new appliances. replace toilet, bathroom tiles and vanity lights. comply w/ cec 150.0 (k). no structural work. | $10,000 |
| Jan 10, 2018 | Completed final sign-off Jul 2018 | 525 Leavenworth St | renovation of apt #25 on the 2nd fl, including (1) new bedroom, laundry, renovate kichen & bath, new lighting, no exterior changes.Details
renovation of apt #25 on the 2nd fl, including (1) new bedroom, laundry, renovate kichen & bath, new lighting, no exterior changes. | $30,000 |
| Dec 13, 2017 | Completed final sign-off Jul 2018 | 535 Leavenworth St | renovation of unit #2 on 2nd floor including new bedroom, new laundry, renovated kitchen, bath, new lighting, no exterior changes. n/a for maherDetails
renovation of unit #2 on 2nd floor including new bedroom, new laundry, renovated kitchen, bath, new lighting, no exterior changes. n/a for maher | $30,000 |