D C Design & Construction Services
- Based in
- San Mateo
- On San Francisco permits
- Apr 2009 to Aug 2013
- Last 24 months
- 0 permits filed
21 permits since 2000: 12 completed, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2013 | Completed final sign-off Sep 2014 | 40 Rosewood Dr | 2 bathrooms remodel, kitchen remodel, replace sheetrock & elect. outlets panel & plumbing pipes. to comply cec 150 (k) 8 & 10; replace 4 windows all at sides of the house. u-factor max. 0.4.Details
2 bathrooms remodel, kitchen remodel, replace sheetrock & elect. outlets panel & plumbing pipes. to comply cec 150 (k) 8 & 10; replace 4 windows all at sides of the house. u-factor max. 0.4. | $110,000 |
| May 9, 2013 | Completed final sign-off Oct 2013 | 2695 21st Av | new room on ground floor including 2 bedrooms, 1 bathroom (sink, tub, toilet) & family room. (1 gfi outlet & 3 outlet ea room, sub-panel)Details
new room on ground floor including 2 bedrooms, 1 bathroom (sink, tub, toilet) & family room. (1 gfi outlet & 3 outlet ea room, sub-panel) | $45,000 |
| Apr 16, 2013 | Never finaled issued Apr 2013, no final | 2323 33rd Av | bathroom remodel, 1 outlet, 1 fan.Details
bathroom remodel, 1 outlet, 1 fan. | $5,000 |
| Dec 12, 2012 | Never finaled issued Dec 2012, no final | 463 Eureka St | replace (e) retaining wall in the back yard.Details
replace (e) retaining wall in the back yard. | $5,000 |
| Dec 3, 2012 | Completed final sign-off Feb 2013 | 3917 18th St | revision to pa# 201209129543. add new 6x4 beams 5.25x11.875 psl. repair all drywall. repair patio.Details
revision to pa# 201209129543. add new 6x4 beams 5.25x11.875 psl. repair all drywall. repair patio. | |
| Nov 15, 2012 | Expired or cancelled expired Jun 2014 | 1360 Clay St | unit #10-kitchen & bathroom remodel-replace kitchen cabinets & sink. replace bathroom shower pan & toilet. no window or door work on this permitDetails
unit #10-kitchen & bathroom remodel-replace kitchen cabinets & sink. replace bathroom shower pan & toilet. no window or door work on this permit | $12,000 |
| Nov 1, 2012 | Completed final sign-off Nov 2012 | 306 20th Av | install fan in bathroom, replace window at lightwell not visible in the street u factor less .4Details
install fan in bathroom, replace window at lightwell not visible in the street u factor less .4 | $1,000 |
| Oct 25, 2012 | Never finaled issued Oct 2012, no final | 308 20th Av | remodel bathroomDetails
remodel bathroom | $6,000 |
| Oct 1, 2012 | Completed final sign-off Feb 2013 | 1746 32nd Av | 1. remodel existing kitchen, bathroom & re-wire electrical in living room, dining room at ground floor. 2. construct new family room & a full bathroom at ground floor.Details
1. remodel existing kitchen, bathroom & re-wire electrical in living room, dining room at ground floor. 2. construct new family room & a full bathroom at ground floor. | $35,000 |
| Sep 14, 2012 | Never finaled issued Mar 2013, no final | 371 17th Av | ultrafine cement grouting along north side of 371 17th avenue, approx 50 linear ft injection points will be installed on 2' centers & will be grouted to the depths shown on the plansDetails
ultrafine cement grouting along north side of 371 17th avenue, approx 50 linear ft injection points will be installed on 2' centers & will be grouted to the depths shown on the plans | $8,000 |
| Sep 14, 2012 | Never finaled issued Mar 2013, no final | 363 17th Av | ultrafine cement grouting along north side of 371 17th avenue, approx 50 linear ft injection points will be installed on 2' centers & will be grouted to the depths shown on the plansDetails
ultrafine cement grouting along north side of 371 17th avenue, approx 50 linear ft injection points will be installed on 2' centers & will be grouted to the depths shown on the plans | $8,000 |
| Sep 12, 2012 | Completed final sign-off Feb 2013 | 3917 18th St | remodel, 2 bathroom, change sink, tub, toilet gfi outlet. change kitchen cabinet, sink, new app, new gfi outlet. replace furnace. drywall replace in kitchen.Details
remodel, 2 bathroom, change sink, tub, toilet gfi outlet. change kitchen cabinet, sink, new app, new gfi outlet. replace furnace. drywall replace in kitchen. | $90,000 |
| Aug 20, 2012 | Never finaled issued Aug 2012, no final | 1734 32nd Av | legalize one bedroom, one bathroom & family room. all work at ground floor.Details
legalize one bedroom, one bathroom & family room. all work at ground floor. | $26,000 |
| May 23, 2012 | Completed final sign-off Aug 2014 | 367 17th Av | revision to pa# 2012-0423-8898-remove cedar shingles at facade & roof, replace (e) damaged stucco with new. new composite roof shingles to replace (e) in kindDetails
revision to pa# 2012-0423-8898-remove cedar shingles at facade & roof, replace (e) damaged stucco with new. new composite roof shingles to replace (e) in kind | |
| Apr 27, 2012 | Never finaled issued Apr 2012, no final | 1360 Clay St | kitchen cabinets replace and new appliance, bathroom shower, toilet, vanity in units 1,7 & 9Details
kitchen cabinets replace and new appliance, bathroom shower, toilet, vanity in units 1,7 & 9 | $58,211 |
| Apr 23, 2012 | Completed final sign-off Aug 2014 | 367 17th Av | new garage @ ground floor, rebuild in-kind (e) porch & entry stairs. replace (e) stucco facade w/cedar shingles, replace all (e) aluminum windows @ facade with new wood windows. new curb cut.Details
new garage @ ground floor, rebuild in-kind (e) porch & entry stairs. replace (e) stucco facade w/cedar shingles, replace all (e) aluminum windows @ facade with new wood windows. new curb cut. | $50,000 |
| Jan 27, 2012 | Never finaled issued Feb 2012, no final | 470 Vernon St | interior renovation- 1st floor: add a storage room, a guest room, a bath, legalize (e) bedroom. 2nd floor: add a full master bath.Details
interior renovation- 1st floor: add a storage room, a guest room, a bath, legalize (e) bedroom. 2nd floor: add a full master bath. | $56,000 |
| Jan 13, 2012 | Completed final sign-off Aug 2014 | 367 17th Av | horizontal additon @ rear ground fl- add bathroom, bedroom, family rm. 2nd fl-horizontal addition+ interior alteration , add roof deck, bath. 3rd fl-horiz. addition + interior alterations.Details
horizontal additon @ rear ground fl- add bathroom, bedroom, family rm. 2nd fl-horizontal addition+ interior alteration , add roof deck, bath. 3rd fl-horiz. addition + interior alterations. | $350,000 |
| Apr 1, 2011 | Completed final sign-off Jun 2014 | 463 Eureka St | enlarge garage & add one bedrm, one & half bathroom & one family room at lower level,convert (e) bedrooms & storage rms to living room, dining rm, kitchen & one bathrm at main level, convert (e) living rm, dining room & kitchen to 3 bedrms & 2 bathrms at upper level, add railing for (n) roof deck.Details
enlarge garage & add one bedrm, one & half bathroom & one family room at lower level,convert (e) bedrooms & storage rms to living room, dining rm, kitchen & one bathrm at main level, convert (e) living rm, dining room & kitchen to 3 bedrms & 2 bathrms at upper level, add railing for (n) roof deck. | $105,000 |
| Jul 28, 2010 | Completed final sign-off Dec 2010 | 971 Filbert St | rear bldg - bathroom remodel including sink,tile,toilet,wall. replace stair from 2nd to 1st floor, foundation upgrade.Details
rear bldg - bathroom remodel including sink,tile,toilet,wall. replace stair from 2nd to 1st floor, foundation upgrade. | $57,000 |
| Apr 21, 2009 | Completed final sign-off Jul 2009 | 284 Union St | kitchen remodel.replace cabinets and countertop ,new appliancesDetails
kitchen remodel.replace cabinets and countertop ,new appliances | $9,500 |