D B H Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to May 2017
- Last 24 months
- 0 permits filed
22 permits since 2000: 16 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 31, 2017 | Completed final sign-off Nov 2017 | 1118 Fell St | unit #2: remodel of existing bath in kind. add cabinets at pantry, repaint and refinish floors.Details
unit #2: remodel of existing bath in kind. add cabinets at pantry, repaint and refinish floors. | $12,000 |
| Mar 10, 2017 | Completed final sign-off Aug 2017 | 278 Sanchez St | apt #3: bathroom remodel, replace plumbing fixtures & new lighting, no structural work.Details
apt #3: bathroom remodel, replace plumbing fixtures & new lighting, no structural work. | $10,000 |
| Mar 3, 2017 | Never finaled issued Mar 2017, no final | 278 Sanchez St | removal of existing tile throughout removal of vanity, new tile and repaint to match existing, new glass shower enclosure.Details
removal of existing tile throughout removal of vanity, new tile and repaint to match existing, new glass shower enclosure. | $7,000 |
| Feb 27, 2017 | Completed final sign-off Nov 2017 | 2354 18th Av | inkind replacement of stucco on the front facade - no change to wood or design detailing; new wood siding on the side building elevation to match existing wood siding - both repairs due to water damageDetails
inkind replacement of stucco on the front facade - no change to wood or design detailing; new wood siding on the side building elevation to match existing wood siding - both repairs due to water damage | $10,000 |
| Oct 11, 2016 | Never finaled issued Oct 2016, no final | 722 22nd Av | cosmetic upgrad of kitchen & bathroom; replace tiles & floor, painting.Details
cosmetic upgrad of kitchen & bathroom; replace tiles & floor, painting. | $6,000 |
| Apr 18, 2016 | Completed final sign-off Jun 2016 | 2480 Mission St | revision to 201511051811: enclose bathroom wallDetails
revision to 201511051811: enclose bathroom wall | |
| Jan 25, 2016 | Completed final sign-off Apr 2016 | 278 Sanchez St | replace (e) exterior deck with new wood decking waterproof. roof deck ar rear, repair waterproofing. replacement in-kind, less than 50%.Details
replace (e) exterior deck with new wood decking waterproof. roof deck ar rear, repair waterproofing. replacement in-kind, less than 50%. | $1,600 |
| Dec 29, 2015 | Completed final sign-off Jun 2016 | 2480 Mission St | mep ref 2015f11051811Details
mep ref 2015f11051811 | |
| Nov 5, 2015 | Completed final sign-off Jun 2016 | 2480 Mission St | suite # 331/332: soft demo: non structural of walls, create new offices with demising walls. new reception area and decorative items. mep under seperate permit. non sprinklered.Details
suite # 331/332: soft demo: non structural of walls, create new offices with demising walls. new reception area and decorative items. mep under seperate permit. non sprinklered. | $200,000 |
| Sep 23, 2015 | Never finaled issued Sep 2015, no final | 4143 24th St | cosmetic upgrade of existing storage area for dental equipment, replace old flooring and re-paint new surroundings.Details
cosmetic upgrade of existing storage area for dental equipment, replace old flooring and re-paint new surroundings. | $1,500 |
| Jul 24, 2015 | Completed final sign-off Oct 2015 | 718 Shrader St | partial bearing wall removal on 2/f related header and foundation.Details
partial bearing wall removal on 2/f related header and foundation. | $9,000 |
| Jul 23, 2015 | Completed final sign-off Jan 2016 | 111 Buena Vista Ave East Av | 1st fl: bathroom remodel and window replacement, 2nd fl relocate laundry room, ath, and kitchen. new isolated footing, new posts and beam. plumbing ele, mech modification as requiredDetails
1st fl: bathroom remodel and window replacement, 2nd fl relocate laundry room, ath, and kitchen. new isolated footing, new posts and beam. plumbing ele, mech modification as required | $42,000 |
| Jul 22, 2015 | Completed final sign-off Aug 2016 | 147 17th Av | new access stair to (e) second floor wood deckDetails
new access stair to (e) second floor wood deck | $6,000 |
| Nov 19, 2014 | Completed final sign-off Mar 2015 | 490 Post St | space #239; revision to lighting plan, treatment room lighting/ceiling finish/electrical to remain. new lighting and electrical at (n) reception area and wc only. rev. 1 to application 201409085689; maher n/aDetails
space #239; revision to lighting plan, treatment room lighting/ceiling finish/electrical to remain. new lighting and electrical at (n) reception area and wc only. rev. 1 to application 201409085689; maher n/a | $2,000 |
| Sep 8, 2014 | Expired or cancelled cancelled Dec 2014 | 490 Post St | unit 239 - demo designated partition walls, counter tops, sinks (n) accessible bathrm w/n wall (n) dropped ceiling (n) ceiling lights, (n) wood flooring & (n) carpet & (n) tile at bathroom, (n) built-ins (n) sinks at designated locations; maher n/aDetails
unit 239 - demo designated partition walls, counter tops, sinks (n) accessible bathrm w/n wall (n) dropped ceiling (n) ceiling lights, (n) wood flooring & (n) carpet & (n) tile at bathroom, (n) built-ins (n) sinks at designated locations; maher n/a | $25,000 |
| Aug 19, 2014 | Completed final sign-off Aug 2014 | 2620 Mission St | revision to app#201312103747 rearrange office layout and storefront.Details
revision to app#201312103747 rearrange office layout and storefront. | |
| Jul 3, 2014 | Never finaled issued Jul 2014, no final | 2225 03rd St | install gate at rear of alley way.Details
install gate at rear of alley way. | $200 |
| Jun 3, 2014 | Completed final sign-off Apr 2015 | 785 Cole St | extend stair into (e) attic, add attic dormer, finish attic with gypsum board & flooring, attic use as hobby area (habitable), install sprinklers in attic.Details
extend stair into (e) attic, add attic dormer, finish attic with gypsum board & flooring, attic use as hobby area (habitable), install sprinklers in attic. | $40,000 |
| May 1, 2014 | Completed final sign-off Jun 2014 | 460 Pacheco St | remove 6x6 support post, install new steel beam in ceiling of existing basement storage, install new post and post footing.Details
remove 6x6 support post, install new steel beam in ceiling of existing basement storage, install new post and post footing. | $5,000 |
| Mar 31, 2014 | Never finaled issued Mar 2014, no final | 48 Tucker Av | patch and repair mold damaged sheetrock in existing bathroom, replace and install new tile on floor and walk, paint entire area and door.Details
patch and repair mold damaged sheetrock in existing bathroom, replace and install new tile on floor and walk, paint entire area and door. | $5,000 |
| Dec 11, 2013 | Completed final sign-off Jan 2014 | 2480 Mission St | revision to app#201310290557 to reflect extg as built conditions relocate partition wall. title 24 for lighting.Details
revision to app#201310290557 to reflect extg as built conditions relocate partition wall. title 24 for lighting. | $2,000 |
| Dec 10, 2013 | Completed final sign-off Aug 2014 | 2620 Mission St | tenant improvement - new store front. change of use from retail to medical office.Details
tenant improvement - new store front. change of use from retail to medical office. | $60,000 |