Cypress Construction Co
- Based in
- Marina
- On San Francisco permits
- Oct 2018 to Aug 2025
- Last 24 months
- 2 permits filed
8 permits since 2000: 4 completed, 2 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2025 | In progress issued May 2026 | 1731 39th Av | demolish, type 5b, 1-story, non-permitted rear shedDetails
demolish, type 5b, 1-story, non-permitted rear shed | $8,000 |
| Jun 12, 2025 | In progress issued Jul 2025 | 1731 39th Av | interior remodel, drywall, insolution, bathroom, lighting, floors, window (same location) plumbing (routing), electrical (replace knob and tube), backyard deck, paint, hvac replacment.Details
interior remodel, drywall, insolution, bathroom, lighting, floors, window (same location) plumbing (routing), electrical (replace knob and tube), backyard deck, paint, hvac replacment. | $200,000 |
| Sep 17, 2024 | Completed final sign-off May 2025 | 380 West Portal Av | new accessible bathroom to be located within (e) office space. no vertical or horizontal addition. no structural work. no change of use. mep under separate permitDetails
new accessible bathroom to be located within (e) office space. no vertical or horizontal addition. no structural work. no change of use. mep under separate permit | $20,000 |
| Oct 28, 2020 | Never finaled issued Oct 2020, no final | 55 Ora Wy | remodel 1 kitchen and 1 bathroom in-kind. update plumbing and electrical.Details
remodel 1 kitchen and 1 bathroom in-kind. update plumbing and electrical. | $30,000 |
| Sep 2, 2020 | Completed final sign-off Apr 2021 | 1702 Fell St | unit #2: update 2 existing bathrooms, new vanities, new tile, new plumbing to meet ca codes. no walls removed.Details
unit #2: update 2 existing bathrooms, new vanities, new tile, new plumbing to meet ca codes. no walls removed. | $26,000 |
| Feb 26, 2019 | Never finaled issued Feb 2019, no final | 1580 Alemany Bl | updage one kitchen install new cabinets, appliances, plumbing to code. update one full bath - convert tub to shower, remove old shower and install toilet. update one half bath - move toilet.Details
updage one kitchen install new cabinets, appliances, plumbing to code. update one full bath - convert tub to shower, remove old shower and install toilet. update one half bath - move toilet. | $29,000 |
| Dec 5, 2018 | Completed final sign-off Jan 2019 | 324 Collingwood St | bathroom remodel, approx 50 sq sf - remove (e) tub, convert to shower. update plumbing and electricalDetails
bathroom remodel, approx 50 sq sf - remove (e) tub, convert to shower. update plumbing and electrical | $10,000 |
| Oct 9, 2018 | Completed final sign-off Jan 2019 | 320 Collingwood St | update bathroom #2: replace (e) tub, new vanity, tilet, plumbing update bathroom #1 convert tub to shower, new vanity, toilet pluming. new tile in showers and floors. 90sf total.Details
update bathroom #2: replace (e) tub, new vanity, tilet, plumbing update bathroom #1 convert tub to shower, new vanity, toilet pluming. new tile in showers and floors. 90sf total. | $20,000 |