Cynthia G Cotter
- Based in
- San Rafael
- On San Francisco permits
- Jul 2008 to Aug 2013
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2013 | Completed final sign-off Oct 2013 | 28 Dawnview Wy | remodel of one bathroom, replace existing tub location with a stall shower, new sheetrock, replace existing skylight with new one in same location & size.Details
remodel of one bathroom, replace existing tub location with a stall shower, new sheetrock, replace existing skylight with new one in same location & size. | $23,000 |
| Oct 10, 2012 | Completed final sign-off Feb 2013 | 461 02nd St | remodel kitchen, new cabinets, counter tops, appliances 50% kitchen lighting will be high efficiency, electrical panel update, 2 bathrms, new vanity, sink, faucet, toilet, lighting with occupancy sensors, remodel existing showers, new bath fans to connect to (e) ductsDetails
remodel kitchen, new cabinets, counter tops, appliances 50% kitchen lighting will be high efficiency, electrical panel update, 2 bathrms, new vanity, sink, faucet, toilet, lighting with occupancy sensors, remodel existing showers, new bath fans to connect to (e) ducts | $54,050 |
| Aug 17, 2011 | Completed final sign-off Nov 2011 | 2090 Pacific Av | remodel 1 bathroom, 1 powder room, no structural work, install new vanity, sink, faucet, toilet, upgrade electrical & plumbing. replace existing 1 window in lightwell with same size, material & location.Details
remodel 1 bathroom, 1 powder room, no structural work, install new vanity, sink, faucet, toilet, upgrade electrical & plumbing. replace existing 1 window in lightwell with same size, material & location. | $39,750 |
| Feb 8, 2011 | Completed final sign-off Jan 2014 | 2090 Pacific Av | unit # 702: rewiring kitchen; new cabinets, new appliances, counter tops; no structural work; at least 50% high efficacy lighting (by wattage). no change to exhaust system.Details
unit # 702: rewiring kitchen; new cabinets, new appliances, counter tops; no structural work; at least 50% high efficacy lighting (by wattage). no change to exhaust system. | $38,600 |
| Jun 10, 2010 | Completed final sign-off May 2011 | 2016 Jefferson St | remodel master bath room on the 2nd floor. new shower and pan, elec, plbg, tile, plbg fi, paint, plbg fixtures and remove one of the bathrm doors and patch new wall.Details
remodel master bath room on the 2nd floor. new shower and pan, elec, plbg, tile, plbg fi, paint, plbg fixtures and remove one of the bathrm doors and patch new wall. | $45,500 |
| Mar 29, 2010 | Completed final sign-off Feb 2011 | 2090 Pacific Av | unit #506 -revisio to pa#201002196824 - replace existing bathroom window w/different size located in light well.Details
unit #506 -revisio to pa#201002196824 - replace existing bathroom window w/different size located in light well. | |
| Feb 19, 2010 | Completed final sign-off Feb 2011 | 2090 Pacific Av | unit # 506. remodfel one bathroom, new tub, toilet, sink. replace (e) window in lightwell not visible from street. new elec. flourescent w/ occup. sensor. remodel kitch. incl. new cabs. appliances, elec., plbg. relocate (e) sub panel from closet to hallDetails
unit # 506. remodfel one bathroom, new tub, toilet, sink. replace (e) window in lightwell not visible from street. new elec. flourescent w/ occup. sensor. remodel kitch. incl. new cabs. appliances, elec., plbg. relocate (e) sub panel from closet to hall | $57,500 |
| Feb 20, 2009 | Completed final sign-off Jul 2009 | 2090 Pacific Av | remodel bathroom 1: new shower, rplace extg wndw, plmg & electrical, tile. remodel bathroom 2: same foot print new tile, electrical. replace extg wndw. all work in unit #404Details
remodel bathroom 1: new shower, rplace extg wndw, plmg & electrical, tile. remodel bathroom 2: same foot print new tile, electrical. replace extg wndw. all work in unit #404 | $42,710 |
| Jul 17, 2008 | Completed final sign-off Mar 2009 | 1958 Vallejo St | in unit #5, remodel kitchen and 4 bathroom. remove partition walls in kitchen. remove door and patch walls in bathroom #2. new fixtures in bathrooms. install new lights in kchn. closing closet walls in bedroom closet #2. new lighting in kchn and hall and new outletsDetails
in unit #5, remodel kitchen and 4 bathroom. remove partition walls in kitchen. remove door and patch walls in bathroom #2. new fixtures in bathrooms. install new lights in kchn. closing closet walls in bedroom closet #2. new lighting in kchn and hall and new outlets | $35,850 |