Cutler Construction
- Based in
- Woodacre
- On San Francisco permits
- Jul 2009 to Oct 2016
- Last 24 months
- 0 permits filed
28 permits since 2000: 22 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 26, 2016 | Completed final sign-off Jan 2017 | 2375 Francisco St | kitchen remodel, in kind. remove non-load bearing partition wall to bring floor plan to originalDetails
kitchen remodel, in kind. remove non-load bearing partition wall to bring floor plan to original | $15,000 |
| Jun 10, 2016 | Never finaled issued Jun 2016, no final | 743 Elizabeth St | top left unit & bottomn left unit - kithcen & bathroom facelit - replace cabinets, countertops, fixtures.Details
top left unit & bottomn left unit - kithcen & bathroom facelit - replace cabinets, countertops, fixtures. | $15,000 |
| Sep 21, 2015 | Never finaled issued Sep 2015, no final | 42 Loyola Tr | revision to original bpa#201406279740, specify five sprinklers on ground floor 13d, with combo meter, 6-8 sprinkler heads.Details
revision to original bpa#201406279740, specify five sprinklers on ground floor 13d, with combo meter, 6-8 sprinkler heads. | |
| Sep 11, 2015 | Expired or cancelled cancelled Jan 2026 | 42 Loyola Tr | revision to 201406279740. at gr fl keep door from bedroom to exit hallwayDetails
revision to 201406279740. at gr fl keep door from bedroom to exit hallway | |
| Feb 23, 2015 | Completed final sign-off Apr 2015 | 624 Moultrie St | windows with new anderson 200 series double hung windows. no alterations to the existing windows size. no bbns or planing code complaints.Details
windows with new anderson 200 series double hung windows. no alterations to the existing windows size. no bbns or planing code complaints. | $3,500 |
| Jan 29, 2015 | Completed final sign-off Feb 2015 | 115 Nevada St | to obtain final inspection for work approved under pa #200006233450 all work is complete.Details
to obtain final inspection for work approved under pa #200006233450 all work is complete. | |
| Jan 29, 2015 | Completed final sign-off Mar 2015 | 115 Nevada St | to obtain final inspection for work approved under pa #200208204441. all work is complete.Details
to obtain final inspection for work approved under pa #200208204441. all work is complete. | |
| Sep 15, 2014 | Completed final sign-off Mar 2015 | 616 44th Av | renovation of existing bath at 2nd flDetails
renovation of existing bath at 2nd fl | $15,000 |
| Sep 2, 2014 | Completed final sign-off Jul 2015 | 3471 21st St | unit 5 - to complete work on pa#201006305670.Details
unit 5 - to complete work on pa#201006305670. | $500 |
| Aug 14, 2014 | Expired or cancelled expired Feb 2017 | 32 Aztec St | new office, bathroom & storage on ground floor, new radiant heating throughout. lower floor slab. (n) insulation at new window - wood.Details
new office, bathroom & storage on ground floor, new radiant heating throughout. lower floor slab. (n) insulation at new window - wood. | $80,000 |
| Aug 5, 2014 | Completed final sign-off Aug 2014 | 1234 Valencia St | replace 2 windows in back of building "in-kind" wi/ milgard vinyl inserts.Details
replace 2 windows in back of building "in-kind" wi/ milgard vinyl inserts. | $1,000 |
| Jul 7, 2014 | Completed final sign-off Jul 2015 | 3471 21st St | unit 5: in-kind bathroom renovation, new flooring, electrical & lighting upgrades, blow-in insulating & sheetrock, patching & sound proofing throughout.Details
unit 5: in-kind bathroom renovation, new flooring, electrical & lighting upgrades, blow-in insulating & sheetrock, patching & sound proofing throughout. | $15,000 |
| Apr 8, 2014 | Completed final sign-off Dec 2014 | 761 34th Av | renovation of kitchen & 2 baths, reconfigure three bedroom areas, open wall area between dining & kitchen areas, replace interior finishes a srequired, add laundry, all within unit #761, replace windows in kind.Details
renovation of kitchen & 2 baths, reconfigure three bedroom areas, open wall area between dining & kitchen areas, replace interior finishes a srequired, add laundry, all within unit #761, replace windows in kind. | $35,000 |
| Mar 25, 2014 | Completed final sign-off Oct 2014 | 649 Moultrie St | basement renovation: new bathroom and addition of (1) new bedroom. new stair connecting main floor to finished basementDetails
basement renovation: new bathroom and addition of (1) new bedroom. new stair connecting main floor to finished basement | $60,000 |
| Oct 29, 2013 | Expired or cancelled cancelled May 2014 | 761 34th Av | remodel of existing kitchen and 2-bathrooms in kind at lower unit above garage.no change in exhaust ducts. no extg walls to be altered, moved or removed.no structural work. no wall removal or alteration.Details
remodel of existing kitchen and 2-bathrooms in kind at lower unit above garage.no change in exhaust ducts. no extg walls to be altered, moved or removed.no structural work. no wall removal or alteration. | $36,000 |
| Sep 18, 2013 | Completed final sign-off Jan 2014 | 58 Bessie St | in-kind kitchen remodel. siding repair. paint exterior building, garage slab & driveway repair replacement (approx. 1,000 sq. ft.), foundation repair replacement (approx. 8' x 3' section). no change of wall & door.Details
in-kind kitchen remodel. siding repair. paint exterior building, garage slab & driveway repair replacement (approx. 1,000 sq. ft.), foundation repair replacement (approx. 8' x 3' section). no change of wall & door. | $25,000 |
| Sep 11, 2013 | Never finaled issued Sep 2013, no final | 58 Bessie St | "in kind" window replacement (12 windows). all visible to streets. all windows to be metal-clad wood to replace existing aluminum insert windows (u=0.4 max). bedroom windows shall be rescue/egress compliant.Details
"in kind" window replacement (12 windows). all visible to streets. all windows to be metal-clad wood to replace existing aluminum insert windows (u=0.4 max). bedroom windows shall be rescue/egress compliant. | $10,000 |
| Aug 16, 2013 | Completed final sign-off Feb 2015 | 20 Aztec St | add new master bedroom, bath and closet to existing ground floor. excavate to achieve required headroom (g.g. 8/19/2013)Details
add new master bedroom, bath and closet to existing ground floor. excavate to achieve required headroom (g.g. 8/19/2013) | $100,000 |
| May 2, 2013 | Completed final sign-off May 2013 | 57 Bessie St | replace six windows at back of house on 2nd floor in-kind not visible from street. windows shall have same size & location as existing. u-factor for windows shall not exceed 0.40. paint exterior wall at back of house. remove sheet rock at back wall and replace with new sheet rock & insulation.Details
replace six windows at back of house on 2nd floor in-kind not visible from street. windows shall have same size & location as existing. u-factor for windows shall not exceed 0.40. paint exterior wall at back of house. remove sheet rock at back wall and replace with new sheet rock & insulation. | $8,000 |
| Oct 16, 2012 | Completed final sign-off Feb 2013 | 57 Aztec St | in kind kitchen remodel with kitchen window replacement in kind. install exterior light fixture in lightwell outside kitchen window. install 100 amp surge protector at panelDetails
in kind kitchen remodel with kitchen window replacement in kind. install exterior light fixture in lightwell outside kitchen window. install 100 amp surge protector at panel | $17,670 |
| Dec 3, 2010 | Completed final sign-off Mar 2011 | 1350 Washington St | unt # 21: apartment remodel - kitchen and bathroom; all in kind w/ high efficient lights.Details
unt # 21: apartment remodel - kitchen and bathroom; all in kind w/ high efficient lights. | $10,000 |
| Sep 3, 2010 | Completed final sign-off Feb 2011 | 1350 Washington St | unit #33: kitchen/bathroom remodel to comply with violation notice 201065046 (in kind replacement only), provide high efficiency lights or t-24 per cec150(k)Details
unit #33: kitchen/bathroom remodel to comply with violation notice 201065046 (in kind replacement only), provide high efficiency lights or t-24 per cec150(k) | $10,000 |
| Mar 12, 2010 | Completed final sign-off May 2010 | 735 Geary St | to remove rock/plaster/wall finishes for gas line installation required for rannai low emission, direct vent heaters, 8 units heater installation under separate permitDetails
to remove rock/plaster/wall finishes for gas line installation required for rannai low emission, direct vent heaters, 8 units heater installation under separate permit | $31,500 |
| Mar 10, 2010 | Completed final sign-off Mar 2011 | 1350 Washington St | to remove rock/plster/wall torches for gas ione installation required for rannai low emission direct vent heaters, 23 units to be done heater installation under separate permitDetails
to remove rock/plster/wall torches for gas ione installation required for rannai low emission direct vent heaters, 23 units to be done heater installation under separate permit | $57,500 |
| Mar 9, 2010 | Completed final sign-off May 2010 | 2318 22nd St | kitchen remodel in kind. new cabinets, counter, fixtures & finishes, new dishwasher.Details
kitchen remodel in kind. new cabinets, counter, fixtures & finishes, new dishwasher. | $19,432 |
| Dec 1, 2009 | Completed final sign-off May 2010 | 2318 22nd St | replace laundry (washer) hoses, replace broken hose bib. replace bathroom sink fixtures. main electrical panel upgrade. dry wall patch & paint. approx. 30 sqf.Details
replace laundry (washer) hoses, replace broken hose bib. replace bathroom sink fixtures. main electrical panel upgrade. dry wall patch & paint. approx. 30 sqf. | $4,500 |
| Sep 15, 2009 | Completed final sign-off Oct 2009 | 442 11th Av | upgrading the posts, beam at the garage level as recommended by the engineer. adding some tie downs (as prescribed by engineer) to tie the bldg down to the foundation. adding some plywood sheer walling where prescribed by engineer.Details
upgrading the posts, beam at the garage level as recommended by the engineer. adding some tie downs (as prescribed by engineer) to tie the bldg down to the foundation. adding some plywood sheer walling where prescribed by engineer. | $8,200 |
| Jul 21, 2009 | Completed final sign-off Aug 2009 | 969 De Haro St | twi batgs renidek & laundry relocation. 2nd floor bath - replace tub, sink, toilet, tile in-kind (face lift). 1st floor bath - move sink location, convert tub/shower to shower only, relocate laundry to hallway, replace tile.Details
twi batgs renidek & laundry relocation. 2nd floor bath - replace tub, sink, toilet, tile in-kind (face lift). 1st floor bath - move sink location, convert tub/shower to shower only, relocate laundry to hallway, replace tile. | $16,000 |