Custom Built By Crawford Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2018 to Sep 2025
- Last 24 months
- 1 permit filed
22 permits since 2000: 22 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2025 | Completed final sign-off Jan 2026 | 2612 California St | interior remodel of existing kitchen. cabinetry and countertops, appliances, plumbing and electrical.Details
interior remodel of existing kitchen. cabinetry and countertops, appliances, plumbing and electrical. | $70,000 |
| Jan 12, 2024 | Completed final sign-off Apr 2024 | 4518 25th St | rear exterior guard rail at rear deck. replace inkind. less than 50% of rear deck to be repaired.Details
rear exterior guard rail at rear deck. replace inkind. less than 50% of rear deck to be repaired. | $5,000 |
| Oct 27, 2023 | Completed final sign-off Jun 2024 | 173 Bonview St | replace 6 (e) windows in kind at front facade. aluminum-clad wood frames. replace (e) roll up garage door in kind. painted wood with lites. repalce (e) entry door & garage man-door in-kind. painted wood with lite. repaint (e) stucco & trim. no change to materials. paint only in-kind.Details
replace 6 (e) windows in kind at front facade. aluminum-clad wood frames. replace (e) roll up garage door in kind. painted wood with lites. repalce (e) entry door & garage man-door in-kind. painted wood with lite. repaint (e) stucco & trim. no change to materials. paint only in-kind. | $17,000 |
| Jul 11, 2023 | Completed final sign-off Apr 2024 | 4518 25th St | interior renovation of a single family residence including minor modification of partition on the 3rd level. remodeling of kitchen and bathrooms, electrical and mechanical upgrades at interior and exterior.Details
interior renovation of a single family residence including minor modification of partition on the 3rd level. remodeling of kitchen and bathrooms, electrical and mechanical upgrades at interior and exterior. | $250,000 |
| May 19, 2023 | Completed final sign-off Jun 2024 | 173 Bonview St | cosmetic changes to (e) kitchen & bathroom: (e) finishes &fixtures; no change to layout. new fixtures in kind; no change to fixture count. new cabinets & countertop in kind. new appliances in kind. new finsihes. replace (e) damaged window in kind facing lightwell. same size and location. u factor .3Details
cosmetic changes to (e) kitchen & bathroom: (e) finishes &fixtures; no change to layout. new fixtures in kind; no change to fixture count. new cabinets & countertop in kind. new appliances in kind. new finsihes. replace (e) damaged window in kind facing lightwell. same size and location. u factor .3 | $35,500 |
| Dec 8, 2022 | Completed final sign-off Feb 2024 | 38 Lippard Av | revision to bpa# 202207148504.new partial height wall & closet.replace non-street facing window in kind.Details
revision to bpa# 202207148504.new partial height wall & closet.replace non-street facing window in kind. | |
| Nov 17, 2022 | Completed final sign-off Aug 2024 | 173 Bonview St | interior renovation at 1st floor and communicating stair to 2nd fl. partial roof infill at south lightwell; new skylight; window opening and replacemet inkind at rear facade & south lightwell. mech, electical, & plmg replacement of fixtures & system. rear yard improvements.Details
interior renovation at 1st floor and communicating stair to 2nd fl. partial roof infill at south lightwell; new skylight; window opening and replacemet inkind at rear facade & south lightwell. mech, electical, & plmg replacement of fixtures & system. rear yard improvements. | $155,000 |
| Jul 14, 2022 | Completed final sign-off Feb 2024 | 38 Lippard Av | remodel bathroom and laundry closet on first fl.Details
remodel bathroom and laundry closet on first fl. | $7,500 |
| Apr 25, 2022 | Completed final sign-off May 2022 | 403 Broderick St | unit 1: new laundry closet on the 2nd floor.Details
unit 1: new laundry closet on the 2nd floor. | $2,000 |
| Mar 24, 2022 | Completed final sign-off Nov 2022 | 433 Pacheco St | existing fixtures and finishes to be removed in kitchen and 2 bathrooms. doors, windows, and partitions to be removed. new cabinets, doors, window and fixtures to be added.Details
existing fixtures and finishes to be removed in kitchen and 2 bathrooms. doors, windows, and partitions to be removed. new cabinets, doors, window and fixtures to be added. | $68,000 |
| Jan 18, 2022 | Completed final sign-off Apr 2023 | 2451 15th Av | kitchen bath, laundry room remodel, 805 sf. interior stair remodel: interior and rear exterior window replacement, mech, elec and plumbing replacement in kind at areas of remodel. cosmetic changes to existing family room, roof replacement in kind.Details
kitchen bath, laundry room remodel, 805 sf. interior stair remodel: interior and rear exterior window replacement, mech, elec and plumbing replacement in kind at areas of remodel. cosmetic changes to existing family room, roof replacement in kind. | $132,000 |
| Feb 1, 2021 | Completed final sign-off May 2021 | 210 Noe St | rev to pa202011309785. rearrange fixtures and change door swing on both bathrooms. replace bathroom windows inkind. repair drywall in garage.Details
rev to pa202011309785. rearrange fixtures and change door swing on both bathrooms. replace bathroom windows inkind. repair drywall in garage. | |
| Nov 30, 2020 | Completed final sign-off May 2021 | 210 Noe St | relocate (e) bathroom and add one (n) bathroom on both floors. convert (e) bedroom to 2 bathrooms. amend to pa 202011209376 for additional work.Details
relocate (e) bathroom and add one (n) bathroom on both floors. convert (e) bedroom to 2 bathrooms. amend to pa 202011209376 for additional work. | $70,000 |
| Nov 20, 2020 | Completed final sign-off May 2021 | 210 Noe St | in kind bathroom remodel in both unitsDetails
in kind bathroom remodel in both units | $15,000 |
| Aug 29, 2019 | Completed final sign-off Apr 2020 | 428 27th St | revision to bpa 201907024938 (replace decking at front <50%) to replace 100% of decking at front. repair existing porch handrail: work to include replacement of several newel posts and raising of existing handrail approx. 2 1/2" to meet cbc. at front steps, replace several newal posts and raise heigDetails
revision to bpa 201907024938 (replace decking at front <50%) to replace 100% of decking at front. repair existing porch handrail: work to include replacement of several newel posts and raising of existing handrail approx. 2 1/2" to meet cbc. at front steps, replace several newal posts and raise heig | $10,000 |
| Jul 2, 2019 | Completed final sign-off Dec 2019 | 428 27th St | replacing front porth boards with composite decking. less than 50% of entire porchDetails
replacing front porth boards with composite decking. less than 50% of entire porch | $2,000 |
| Mar 7, 2019 | Completed final sign-off Feb 2020 | 28 Santa Marina St | horizontal addition. remove metal prefab fire escape balcony on upper fl. construct wood deck & stairs on upper level at the back of (e) houseDetails
horizontal addition. remove metal prefab fire escape balcony on upper fl. construct wood deck & stairs on upper level at the back of (e) house | $10,000 |
| Mar 1, 2019 | Completed final sign-off Oct 2019 | 28 Santa Marina St | new lower timber deck 14'x19' with handrak, under 3 feet in heightDetails
new lower timber deck 14'x19' with handrak, under 3 feet in height | $10,000 |
| Aug 22, 2018 | Completed final sign-off Oct 2019 | 28 Santa Marina St | revision to bpa# 2018-0813-7162: remodel hall way batrhoom and master bathroom in kind. replace all drywall and retile bathroom wih all new fixtures. replace rotted stud wood for master bathroom. construct new wall in shower for dryer ducting. remodel kitchen in kind.Details
revision to bpa# 2018-0813-7162: remodel hall way batrhoom and master bathroom in kind. replace all drywall and retile bathroom wih all new fixtures. replace rotted stud wood for master bathroom. construct new wall in shower for dryer ducting. remodel kitchen in kind. | $15,000 |
| Aug 17, 2018 | Completed final sign-off Oct 2019 | 28 Santa Marina St | insert washer and dryer at master bathroom dressing area at middel level, install electric w/ water hook-ups and vent past bathroom to airspaceDetails
insert washer and dryer at master bathroom dressing area at middel level, install electric w/ water hook-ups and vent past bathroom to airspace | $5,000 |
| Aug 13, 2018 | Completed final sign-off Oct 2019 | 28 Santa Marina St | replace (2) existing back sliding doors in same location and size. replace bath with shower, update knobs in master bathroom. replace bath and faucets in hall bathroom at second floor.Details
replace (2) existing back sliding doors in same location and size. replace bath with shower, update knobs in master bathroom. replace bath and faucets in hall bathroom at second floor. | $25,000 |
| Feb 12, 2018 | Completed final sign-off Mar 2018 | 1375 Sanchez St | repair rotten siding on back of house approx 10 sq ftDetails
repair rotten siding on back of house approx 10 sq ft | $2,000 |