Cullen Construction
- Based in
- San Rafael
- On San Francisco permits
- Oct 2018 to Sep 2020
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2020 | Completed final sign-off Nov 2020 | 3972 25th St | revision to 201810022052 add to evaluation. removed lath and plaster and trim in living rm and bedroom smell of smoke. replaced with 5/8 type x and 1x4Details
revision to 201810022052 add to evaluation. removed lath and plaster and trim in living rm and bedroom smell of smoke. replaced with 5/8 type x and 1x4 | $20,000 |
| Jan 18, 2019 | Never finaled issued Jan 2019, no final | 3972 25th St | revision to pa#201810022052. interior renovation tear down loose plaster. replace w/ 5/8 drywall type x. replace electrical, plumbing & flooring. no walls removed. non structural work.Details
revision to pa#201810022052. interior renovation tear down loose plaster. replace w/ 5/8 drywall type x. replace electrical, plumbing & flooring. no walls removed. non structural work. | $25,000 |
| Oct 2, 2018 | Completed final sign-off Nov 2020 | 3972 25th St | remodel kitchen and bath, replace plaster, tile, electrical and plumbing fixtures.Details
remodel kitchen and bath, replace plaster, tile, electrical and plumbing fixtures. | $30,000 |