Critical Path Planning
- Based in
- Fairfax
- On San Francisco permits
- Jan 2004 to Jan 2006
- Last 24 months
- 0 permits filed
17 permits since 2000: 11 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 24, 2006 | Never finaled issued Jan 2006, no final | 357 Collingwood St | install 8-18" 0 drilled piers in existing swimming pool to stabilize pool. pool to be infilled and decomissionedDetails
install 8-18" 0 drilled piers in existing swimming pool to stabilize pool. pool to be infilled and decomissioned | $30,000 |
| Nov 21, 2005 | Completed final sign-off Apr 2006 | 4096 17th St | upgrade kitchen cabinets and appliances on 2nd floorDetails
upgrade kitchen cabinets and appliances on 2nd floor | $6,500 |
| Aug 15, 2005 | Completed final sign-off Jan 2006 | 1446 08th Av | kitchen remodel, update cabinetry, new floorfinish, new lighting, move fridge and add wter line forDetails
kitchen remodel, update cabinetry, new floorfinish, new lighting, move fridge and add wter line for | $30,000 |
| Jun 15, 2005 | Completed final sign-off Sep 2005 | 366 Arguello Bl | update plumbing fixtures, tiles, shower doors in 3 bathroomsDetails
update plumbing fixtures, tiles, shower doors in 3 bathrooms | $30,000 |
| Jun 8, 2005 | Completed final sign-off Jun 2005 | 1114 Clay St | renew 200407269771, 200407138666, 200408030487 for final insp.Details
renew 200407269771, 200407138666, 200408030487 for final insp. | |
| Jun 8, 2005 | Completed final sign-off Apr 2006 | 668 Elizabeth St | kitchen and dining area remodel update kitchen counters and cabinets new windows (replace old) inDetails
kitchen and dining area remodel update kitchen counters and cabinets new windows (replace old) in | $47,000 |
| Oct 21, 2004 | Never finaled issued Oct 2004, no final | 226 Clinton Pk | kitchen and bathroom remodel - replacement of two windowsDetails
kitchen and bathroom remodel - replacement of two windows | $44,000 |
| Aug 24, 2004 | Completed final sign-off Oct 2005 | 1120 Clay St | merge unit a-2&b-2 to 1 unit.remove 2 hallway doors,kitchen.built bedroom closet.Details
merge unit a-2&b-2 to 1 unit.remove 2 hallway doors,kitchen.built bedroom closet. | $6,000 |
| Jul 26, 2004 | Expired or cancelled expired Jun 2007 | 1114 Clay St | take at propsd beam because it is unecesssary and replace with 2x10 ceiling joists @ flr above grgDetails
take at propsd beam because it is unecesssary and replace with 2x10 ceiling joists @ flr above grg | |
| Jul 13, 2004 | Expired or cancelled expired Jun 2005 | 1114 Clay St | remove extg interior wall and replace with steel i beam and wood postsDetails
remove extg interior wall and replace with steel i beam and wood posts | $2,000 |
| Jul 12, 2004 | Expired or cancelled expired Apr 2007 | 271 Laidley St | alt of existing plans including app #200404050487 elimination of underpinning of (e) wall due toDetails
alt of existing plans including app #200404050487 elimination of underpinning of (e) wall due to | |
| Apr 22, 2004 | Completed final sign-off Jun 2005 | 1120 Clay St | remodel/uppdate 2 bthrm and 1 kchn in unit #1/no strct./nw fixtures installationDetails
remodel/uppdate 2 bthrm and 1 kchn in unit #1/no strct./nw fixtures installation | $36,000 |
| Apr 22, 2004 | Completed final sign-off Sep 2004 | 2379 46th Av | bedroom and bathroom addition in 1st floor adjacent to garageDetails
bedroom and bathroom addition in 1st floor adjacent to garage | $20,400 |
| Apr 5, 2004 | Expired or cancelled expired Apr 2007 | 271 Laidley St | excavation of excess soil egainst walls in basement to make increased storage space. construction ofDetails
excavation of excess soil egainst walls in basement to make increased storage space. construction of | $11,500 |
| Feb 23, 2004 | Completed final sign-off Jul 2004 | 155 Colon Av | kitchen & bath remodel, change cabs & countertops, replace fixtures (plumbing & electrical) redo floDetails
kitchen & bath remodel, change cabs & countertops, replace fixtures (plumbing & electrical) redo flo | $14,500 |
| Feb 6, 2004 | Completed final sign-off Feb 2004 | 1120 Clay St | renew expired permit for final inspection on app 200211141411Details
renew expired permit for final inspection on app 200211141411 | |
| Jan 21, 2004 | Completed final sign-off Apr 2005 | 1114 Clay St | connect 1st fl w/basement to form 2-story dwelling place and additional storageDetails
connect 1st fl w/basement to form 2-story dwelling place and additional storage | $60,000 |