Cristoff Painting & Decoa
- Based in
- Berkelry
- On San Francisco permits
- Jun 2006 to Jan 2007
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 17, 2007 | Completed final sign-off Aug 2007 | 183 Brompton Av | build to the code (conform) to comply with nov 200680567 post rail and handrail in the back sides and legalize extg decking.Details
build to the code (conform) to comply with nov 200680567 post rail and handrail in the back sides and legalize extg decking. | $1,400 |
| Jun 22, 2006 | Completed final sign-off Jul 2006 | 470 14th St | repair on central lightwell , 4 railings to be repaired and reinforced. reinforced extended post. remove dry rot in siding as necessary. remove dry rot on existing trim & install new, install one step. repair work is less than 50% of existing.Details
repair on central lightwell , 4 railings to be repaired and reinforced. reinforced extended post. remove dry rot in siding as necessary. remove dry rot on existing trim & install new, install one step. repair work is less than 50% of existing. | $25,000 |