Cristian Rotoro
- Based in
- Concord
- On San Francisco permits
- Sep 2003 to Aug 2018
- Last 24 months
- 0 permits filed
26 permits since 2000: 21 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 2, 2018 | Never finaled issued Aug 2018, no final | 300 03rd St | #518: kitchen & bathroom remodel, 7 new recessed lights. remove partial wall between kitchen/hallway. remove closet wall in master bath & install new vanity. remove shower stall, 2nd bath remodel as in kind.fire alarm shall be compliant with 1103.7.6.1Details
#518: kitchen & bathroom remodel, 7 new recessed lights. remove partial wall between kitchen/hallway. remove closet wall in master bath & install new vanity. remove shower stall, 2nd bath remodel as in kind.fire alarm shall be compliant with 1103.7.6.1 | $36,000 |
| Dec 23, 2016 | Completed final sign-off Jan 2020 | 164 Terra Vista Av | repair & upgrade of bathrooms, kitchen & downstairs (lelvel one) living space including new family room, bedroom, bathroom, laundry room, mudroom room, storage. upgrade of plumbing & electrical.Details
repair & upgrade of bathrooms, kitchen & downstairs (lelvel one) living space including new family room, bedroom, bathroom, laundry room, mudroom room, storage. upgrade of plumbing & electrical. | $85,000 |
| May 9, 2016 | Completed final sign-off Aug 2016 | 779 Kansas St | kitchen and bath remodel: replace bathtub to shower, remove/replace cabinets in-kind, replace windows (wood at front, vinyl at rear) 6-windows total. new main panel 125a, new sub-panel, wire entire house. windows same size and location, max u-factor 0.32Details
kitchen and bath remodel: replace bathtub to shower, remove/replace cabinets in-kind, replace windows (wood at front, vinyl at rear) 6-windows total. new main panel 125a, new sub-panel, wire entire house. windows same size and location, max u-factor 0.32 | $35,000 |
| Dec 19, 2014 | Completed final sign-off Dec 2015 | 259 Bartlett St | soft story retrofit per sfbc chapter 34b.Details
soft story retrofit per sfbc chapter 34b. | $5,000 |
| Jan 8, 2014 | Completed final sign-off May 2014 | 966 Ingerson Av | rooms down conversion. add a bedroom, bathroom & family room @ ground fl. add & remove interior walls @ ground fl & 2nd fl.Details
rooms down conversion. add a bedroom, bathroom & family room @ ground fl. add & remove interior walls @ ground fl & 2nd fl. | $15,000 |
| Jan 8, 2014 | Completed final sign-off Apr 2014 | 160 Madrone Av | replace approximate 80 sq ft of dry ron as in kind on north wall. not visable.Details
replace approximate 80 sq ft of dry ron as in kind on north wall. not visable. | $7,000 |
| Dec 13, 2013 | Completed final sign-off May 2014 | 966 Ingerson Av | kitchen and 1 bathroom remodel - in kind on 2/fDetails
kitchen and 1 bathroom remodel - in kind on 2/f | $20,000 |
| Nov 5, 2013 | Completed final sign-off Nov 2013 | 11 Otsego Av | increase the value of permit # 201310119177 by $30,000 per district inspector r. berriosDetails
increase the value of permit # 201310119177 by $30,000 per district inspector r. berrios | $30,000 |
| Oct 11, 2013 | Completed final sign-off Jan 2014 | 11 Otsego Av | 1)new hall access to bedrooms, kitchen remodeling, closet remodeling, new bathroom layout. 2)front porch to be restored to original. 3)replace extg staircase at rear deck. new railings. 4)partial foundation repair.Details
1)new hall access to bedrooms, kitchen remodeling, closet remodeling, new bathroom layout. 2)front porch to be restored to original. 3)replace extg staircase at rear deck. new railings. 4)partial foundation repair. | $27,000 |
| Sep 6, 2013 | Never finaled issued Sep 2013, no final | 11 Otsego Av | replace bath tub, vanity, toilet, replace shower valve, new tile on wall/flooring, replace outlet (gfci)Details
replace bath tub, vanity, toilet, replace shower valve, new tile on wall/flooring, replace outlet (gfci) | $6,000 |
| Aug 23, 2013 | Completed final sign-off May 2014 | 160 Madrone Av | replace wall tile, replace two bathtub, install shower pan new wall tile.Details
replace wall tile, replace two bathtub, install shower pan new wall tile. | $8,000 |
| Aug 22, 2013 | Completed final sign-off Apr 2014 | 160 Madrone Av | repair/replace three windows as in-kind. one window front of building, two west side.Details
repair/replace three windows as in-kind. one window front of building, two west side. | $5,000 |
| Aug 28, 2012 | Never finaled issued Aug 2012, no final | 3051 California St | install steel moment frames with foundation & shear walls per submitted plans, all work to be done inside the bldg.Details
install steel moment frames with foundation & shear walls per submitted plans, all work to be done inside the bldg. | $20,000 |
| May 23, 2011 | Completed final sign-off Jun 2011 | 189 Farnum St | comply with n.o.v.#201073047; legalize as-built retaining wall @ rear yard, property line. repair wall piers, as shown on plans, extending them 5ft. deepth additionally.Details
comply with n.o.v.#201073047; legalize as-built retaining wall @ rear yard, property line. repair wall piers, as shown on plans, extending them 5ft. deepth additionally. | $6,000 |
| Jan 26, 2011 | Completed final sign-off Aug 2011 | 958 Capp St | revision to 201010012134, 201101148399. reconfigure landing and repostition 3 lower steps, extend upper run of rear stairsDetails
revision to 201010012134, 201101148399. reconfigure landing and repostition 3 lower steps, extend upper run of rear stairs | $5,000 |
| Jul 21, 2010 | Completed final sign-off Aug 2010 | 259 Bartlett St | as built to show clarification; kitchen area, entry apt., upper level. revision to appl.#2009/0922/7351.Details
as built to show clarification; kitchen area, entry apt., upper level. revision to appl.#2009/0922/7351. | |
| Feb 25, 2010 | Completed final sign-off Sep 2010 | 259 Bartlett St | replace in-kind horizontal siding @ rear & 2-sides of property. install (n) hardi-plank board over horiz. siding. not visable from street.Details
replace in-kind horizontal siding @ rear & 2-sides of property. install (n) hardi-plank board over horiz. siding. not visable from street. | $6,000 |
| Dec 15, 2009 | Completed final sign-off Sep 2010 | 259 Bartlett St | r e r o o f i n g: resurface composition shingles roof on the property with new as in nina roofing material over 30# felt paper.Details
r e r o o f i n g: resurface composition shingles roof on the property with new as in nina roofing material over 30# felt paper. | $4,000 |
| Oct 9, 2009 | Completed final sign-off Nov 2009 | 1241 06th Av | replace 4 windows south side of building, same size window, vinyl frame, no visible to the streetDetails
replace 4 windows south side of building, same size window, vinyl frame, no visible to the street | $2,500 |
| Oct 9, 2009 | Completed final sign-off Aug 2010 | 259 Bartlett St | replacement of central heating @all (6) units with new duct system and central heating in kind and same location. provide combustion air per cmc ch 7 26 gauge ducts for penetration between garage and units. furnace 90% afue, attic furnace comply with cmc 931.0Details
replacement of central heating @all (6) units with new duct system and central heating in kind and same location. provide combustion air per cmc ch 7 26 gauge ducts for penetration between garage and units. furnace 90% afue, attic furnace comply with cmc 931.0 | $23,000 |
| Sep 22, 2009 | Completed final sign-off Aug 2010 | 259 Bartlett St | extending living rm. area at unit 259. adding washer/dryer to all units @ (e) closets. relocate kitchen @ unit 267 & 259. converting liv. rm. to bedrm. @ 1st. & 2nd. flr. revision to appl. #2009/0819/5184.Details
extending living rm. area at unit 259. adding washer/dryer to all units @ (e) closets. relocate kitchen @ unit 267 & 259. converting liv. rm. to bedrm. @ 1st. & 2nd. flr. revision to appl. #2009/0819/5184. | $4,000 |
| Aug 19, 2009 | Completed final sign-off Aug 2010 | 259 Bartlett St | remodel 6 bathrooms and 6 kitchens. add 6 new washer/dryers , 1 per unit. dry rot rear deck repair in kind less than 50%, rear bldg rppf, floor joist and wall repair . replacement in kind fron windows. add storage rooms on ground floor. plywood strengthening. new 1-hour interior stairway enclosureDetails
remodel 6 bathrooms and 6 kitchens. add 6 new washer/dryers , 1 per unit. dry rot rear deck repair in kind less than 50%, rear bldg rppf, floor joist and wall repair . replacement in kind fron windows. add storage rooms on ground floor. plywood strengthening. new 1-hour interior stairway enclosure | $80,000 |
| Jun 10, 2009 | Completed final sign-off Aug 2010 | 259 Bartlett St | increase the estimate cost from $120,000 to $155,000 per approved pa 200708028574Details
increase the estimate cost from $120,000 to $155,000 per approved pa 200708028574 | $35,000 |
| Aug 2, 2007 | Expired or cancelled expired Aug 2010 | 259 Bartlett St | foundation upgrade, first floor framing upgrade to accomodate installation of garages (per submitted plans). new shear wall upgrade in garage, repair as in kind backstairs, no work on exterior elevation to be done.Details
foundation upgrade, first floor framing upgrade to accomodate installation of garages (per submitted plans). new shear wall upgrade in garage, repair as in kind backstairs, no work on exterior elevation to be done. | $120,000 |
| Sep 19, 2006 | Completed final sign-off Mar 2007 | 1237 06th Av | comply nov 200674549. replace cabinets and counters in 2 kitchens. replace toilets and sinks in bathrooms (2). add pergo flooring and tile on tub surroung and floor. work in #1237 & #1239 only.Details
comply nov 200674549. replace cabinets and counters in 2 kitchens. replace toilets and sinks in bathrooms (2). add pergo flooring and tile on tub surroung and floor. work in #1237 & #1239 only. | $20,000 |
| Sep 25, 2003 | Never finaled issued Sep 2003, no final | 1200 Gough St | replace kitchen cabinets & bathroom tile.Details
replace kitchen cabinets & bathroom tile. | $8,500 |