Crime Watch Security Systems Llc.
- Based in
- Newport Beach
- On San Francisco permits
- Jul 2023 to Oct 2026
- Last 24 months
- 11 permits filed
13 permits since 2000: 3 completed, 10 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 1590 Broadway | tenant improvement; add 35 horn strobes to bedrooms which did not comply w/ 1103.7.6.Details
tenant improvement; add 35 horn strobes to bedrooms which did not comply w/ 1103.7.6. | |
| Sep 29, 2026 | In progress issued Sep 2026 | 2 Parkridge Dr | as built per inspector comments added lcd annunciator @ bldg 2. parkside main entrance. removed annunciator at bldg 10 parkridge ref pa 202601304909Details
as built per inspector comments added lcd annunciator @ bldg 2. parkside main entrance. removed annunciator at bldg 10 parkridge ref pa 202601304909 | |
| Jul 13, 2026 | In progress issued Jul 2026 | 2061 Chestnut St | administrative permit for address correction for fire-26-1061; from 2601 chestnut to 2061 chestnut.Details
administrative permit for address correction for fire-26-1061; from 2601 chestnut to 2061 chestnut. | |
| Jun 26, 2026 | In progress filed Jun 2026, not yet issued | 1590 Broadway | revision of 202606052652 and 202606052653 to include upgrade of sounders to comply with 1103.7Details
revision of 202606052652 and 202606052653 to include upgrade of sounders to comply with 1103.7 | |
| Jun 9, 2026 | Completed final sign-off Jun 2026 | 1966 Pacific Av | as-built fire alarm permit 202104208970. replace all wireless devices with hard wired devices.Details
as-built fire alarm permit 202104208970. replace all wireless devices with hard wired devices. | $100 |
| Jun 5, 2026 | In progress issued Jun 2026 | 1590 Broadway | to obtain a final insepction for work approved under 200304011169 fire alarm revision. all work completeDetails
to obtain a final insepction for work approved under 200304011169 fire alarm revision. all work complete | |
| Jun 5, 2026 | In progress issued Jun 2026 | 1590 Broadway | to obtain a final insepction for work approved under 200209166515 fire alarm. all work completeDetails
to obtain a final insepction for work approved under 200209166515 fire alarm. all work complete | |
| May 28, 2026 | Completed final sign-off Jun 2026 | 706 Jackson St | as buildts: per inspection notes the following changes were applied. 1) show facp at bank on plans 2) correct sequence of operations. ref pa# 2025-0725-1617.Details
as buildts: per inspection notes the following changes were applied. 1) show facp at bank on plans 2) correct sequence of operations. ref pa# 2025-0725-1617. | $100 |
| May 28, 2026 | Completed final sign-off Jul 2026 | 447 Bush St | as built: per inspection notes. 1) change room #202 to #201, room #201 to #200. 2)add existing smoke detector in ada unite #200. ref fire pa# 2019-0522-1414.Details
as built: per inspection notes. 1) change room #202 to #201, room #201 to #200. 2)add existing smoke detector in ada unite #200. ref fire pa# 2019-0522-1414. | |
| Jun 5, 2025 | In progress issued May 2026 | 349 07th Av | upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 to meet 750b in all sleep areas. ref#: 202207208940Details
upgrade existing fire alarm system to comply with sffc section 1103.7.6.1 to meet 750b in all sleep areas. ref#: 202207208940 | $24,500 |
| Dec 20, 2024 | In progress issued May 2026 | 1158 Sutter St | replace fire alarm system to comply with sffc 1103.7.6.1, replace existing facp with 1-new fire alarm control unit, install 1-new aes radio communicator, new lcd annunciator, replace existing smokes, existing heats, replace existing notification appliance, install lf sounders in units.Details
replace fire alarm system to comply with sffc 1103.7.6.1, replace existing facp with 1-new fire alarm control unit, install 1-new aes radio communicator, new lcd annunciator, replace existing smokes, existing heats, replace existing notification appliance, install lf sounders in units. | $20,000 |
| Dec 7, 2023 | In progress issued Jun 2026 | 824 Carolina St | to comply with fire alarm nffd cbc 907.23 upgrade panel to ifp-75 24/7 monitoring. upradge existing devices 7 smoke detectors, 5 manual pull stations, 7 horn strobes, 3 strobes. ref 202311201164Details
to comply with fire alarm nffd cbc 907.23 upgrade panel to ifp-75 24/7 monitoring. upradge existing devices 7 smoke detectors, 5 manual pull stations, 7 horn strobes, 3 strobes. ref 202311201164 | $17,500 |
| Jul 5, 2023 | In progress issued Jun 2026 | 1790 Jackson St | upgrade (e) fire alarm system to comply with sffc section 1103.7.6.1.Details
upgrade (e) fire alarm system to comply with sffc section 1103.7.6.1. | $110,671 |