Crestwood Contractors Inc
- Based in
- Fremont
- On San Francisco permits
- Feb 2018 to Mar 2022
- Last 24 months
- 0 permits filed
13 permits since 2000: 6 completed, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 28, 2022 | Never finaled issued Mar 2022, no final | 174 Majestic Av | remodeling of kitchen including replacing cabinets, counter tops, plumbing & electrical fixtures, appliances and devices.Details
remodeling of kitchen including replacing cabinets, counter tops, plumbing & electrical fixtures, appliances and devices. | $18,500 |
| Dec 29, 2021 | Expired or cancelled suspend Sep 2022 | 229 Whitney St | soft demolition exploratory work to determine framing orientation and size of framing members. no alteration to existing interior/ exterior layout.three location in the ceiling of 1st floor (3 sq ft max) patch in kindDetails
soft demolition exploratory work to determine framing orientation and size of framing members. no alteration to existing interior/ exterior layout.three location in the ceiling of 1st floor (3 sq ft max) patch in kind | $25,000 |
| Oct 25, 2021 | Completed final sign-off Oct 2021 | 3910 24th St | renew permits #201804247153 & 201811266684 for final.Details
renew permits #201804247153 & 201811266684 for final. | |
| Aug 19, 2020 | Completed final sign-off Mar 2021 | 2701 Green St | sheet rock repair @ existing garage ceiling, due to plumbing failure at apartment. maintain fire-rating requirement.Details
sheet rock repair @ existing garage ceiling, due to plumbing failure at apartment. maintain fire-rating requirement. | $5,000 |
| Jun 24, 2020 | Completed final sign-off Aug 2020 | 495 Madrid St | complying w/ nov #202038531. replacing of deteriorated siding at rear w/ harbieboard including installing r11 insulation in walls (not visible to street)Details
complying w/ nov #202038531. replacing of deteriorated siding at rear w/ harbieboard including installing r11 insulation in walls (not visible to street) | $4,000 |
| Dec 13, 2019 | Completed final sign-off Oct 2021 | 3910 24th St | rev to pa# 201908067839; unit addition, new remodel of 2nd level & build new bedrooms on mezzaznine levelDetails
rev to pa# 201908067839; unit addition, new remodel of 2nd level & build new bedrooms on mezzaznine level | $50,000 |
| Nov 15, 2019 | Expired or cancelled revoked Apr 2021 | 1100 Leavenworth St | comply w/ nov #201987461: interior remodel to include unit #1-#6, (6) new bathrooms (one in each unit). infill of wall at living room 2nd floor wall and bathroom.Details
comply w/ nov #201987461: interior remodel to include unit #1-#6, (6) new bathrooms (one in each unit). infill of wall at living room 2nd floor wall and bathroom. | $50,000 |
| Nov 5, 2019 | Expired or cancelled expired Oct 2021 | 3910 24th St | recommencement and completion of work approved under pa 201808227960 and 201802161482Details
recommencement and completion of work approved under pa 201808227960 and 201802161482 | $10,000 |
| Aug 5, 2019 | Completed final sign-off Oct 2021 | 3910 24th St | complete 2nd level remodel, reconfigure rooms, kitchen and bath remodelsDetails
complete 2nd level remodel, reconfigure rooms, kitchen and bath remodels | $50,000 |
| Jul 23, 2019 | Expired or cancelled suspend Jul 2019 | 3910 24th St | remodel (e) bathroomDetails
remodel (e) bathroom | $5,000 |
| Dec 26, 2018 | Completed final sign-off Oct 2021 | 3910 24th St | ti new spa spac in (e) vacant commercial space ref 201804247153Details
ti new spa spac in (e) vacant commercial space ref 201804247153 | $180,000 |
| Nov 26, 2018 | Expired or cancelled expired Oct 2021 | 3910 24th St | restore (6) existing front facade windows at 2nd and 3rd floor to wood windows. windows will be double hung. same size same location. u=0.32 maxDetails
restore (6) existing front facade windows at 2nd and 3rd floor to wood windows. windows will be double hung. same size same location. u=0.32 max | $2,500 |
| Feb 16, 2018 | Expired or cancelled expired Oct 2021 | 3910 24th St | voluntary ground floor lateral strenghening with new ada bathroom within commercial space as req'd for structural work. no exterior work.Details
voluntary ground floor lateral strenghening with new ada bathroom within commercial space as req'd for structural work. no exterior work. | $48,000 |