Creative Tile Design
- Based in
- San Ramon
- On San Francisco permits
- Oct 2011 to Mar 2013
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 15, 2013 | Completed final sign-off Nov 2013 | 267 Teresita Bl | garage infill, kitchen & bath remodel, rear ground level deck, garage infill to include: (2) bedrooms, 1-1/2 bathrooms, (1) family room, relocate laundry to closet, new slab on grade, new foundations, new windows.Details
garage infill, kitchen & bath remodel, rear ground level deck, garage infill to include: (2) bedrooms, 1-1/2 bathrooms, (1) family room, relocate laundry to closet, new slab on grade, new foundations, new windows. | $130,000 |
| Oct 27, 2011 | Never finaled issued Oct 2011, no final | 1482 14th Av | revision to 2011-1024-7493. enlarge existing pass through window in non bearing wall @ kitchen.Details
revision to 2011-1024-7493. enlarge existing pass through window in non bearing wall @ kitchen. | $1,000 |
| Oct 24, 2011 | Completed final sign-off Nov 2011 | 1482 14th Av | remove existing cabinets, install new cabinets, tops, sink, faucet, install dedicated circuits for dishwasher & disposal & microwave. add flourcent ceiling lights. lighting to comply with cec 150(k)Details
remove existing cabinets, install new cabinets, tops, sink, faucet, install dedicated circuits for dishwasher & disposal & microwave. add flourcent ceiling lights. lighting to comply with cec 150(k) | $7,000 |