Creative Designs Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2010 to Jul 2020
- Last 24 months
- 0 permits filed
41 permits since 2000: 30 completed, 11 never finaled.
Of the 11 never-finaled permits, 2 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 21, 2020 | Completed final sign-off May 2022 | 2243 26th Av | remodel and reconfigure existing bathroom on 1/f, remove walls at garage. reference pa#: 8610142.Details
remodel and reconfigure existing bathroom on 1/f, remove walls at garage. reference pa#: 8610142. | $20,000 |
| Sep 24, 2019 | Completed final sign-off Sep 2020 | 116 Escolta Wy | 1st floor - new bedroom, bathroom, laundry room, entertainment and family room. 2nd fl - relocate (e) kitchen, enclose lightwell, remodel (e) bathroom, add master bathroom.Details
1st floor - new bedroom, bathroom, laundry room, entertainment and family room. 2nd fl - relocate (e) kitchen, enclose lightwell, remodel (e) bathroom, add master bathroom. | $46,000 |
| May 31, 2019 | Completed final sign-off Jul 2020 | 2243 26th Av | 2nd fl. enclose (e) lightwells at north & south side of building remodel & relocate (e) kitchen & bathroom & (n) master bathroom, (n) deck at rear 2nd fl. (side of building)Details
2nd fl. enclose (e) lightwells at north & south side of building remodel & relocate (e) kitchen & bathroom & (n) master bathroom, (n) deck at rear 2nd fl. (side of building) | $43,000 |
| Apr 30, 2019 | Completed final sign-off Jun 2019 | 1327 07th Av | unit 6 - replace damaged sheetrock & insulation in downstairs bathroom, stairway, living room & back doorway. repair in-kind sheetrock 5/8 inches type xDetails
unit 6 - replace damaged sheetrock & insulation in downstairs bathroom, stairway, living room & back doorway. repair in-kind sheetrock 5/8 inches type x | $10,000 |
| Apr 3, 2019 | Completed final sign-off Oct 2019 | 1825 Moraga St | replacement of rear deck and stairwayDetails
replacement of rear deck and stairway | $7,000 |
| Feb 11, 2019 | Completed final sign-off Jun 2020 | 811 41st Av | interior remodel of existing 1st floor garage space. provide bedroom, media room & den. relocate existing bath, replace garage door in same opening, relocate existing garage entry, door to opposite side of alcoveDetails
interior remodel of existing 1st floor garage space. provide bedroom, media room & den. relocate existing bath, replace garage door in same opening, relocate existing garage entry, door to opposite side of alcove | $50,000 |
| Jan 7, 2019 | Completed final sign-off Jan 2021 | 1565 16th Av | remove lath & plaster & replace with 5/8" type 'x' gym bd sheet rot exploratory.Details
remove lath & plaster & replace with 5/8" type 'x' gym bd sheet rot exploratory. | $5,000 |
| Jan 7, 2019 | Completed final sign-off Jul 2020 | 2243 26th Av | remodel (e) kitchen & bath at 2nd fl. remove lath & plaster & replace w/ 5/8" type 'x' gym bd sheet rot.Details
remodel (e) kitchen & bath at 2nd fl. remove lath & plaster & replace w/ 5/8" type 'x' gym bd sheet rot. | $30,000 |
| Aug 29, 2018 | Completed final sign-off Feb 2019 | 811 41st Av | kitchen remodel and new stackable washer & dryer off kitchen. full bathroom remodel and powder room update. all work is 2nd fl.Details
kitchen remodel and new stackable washer & dryer off kitchen. full bathroom remodel and powder room update. all work is 2nd fl. | $35,000 |
| Apr 24, 2018 | Completed final sign-off May 2019 | 14 Fairfield Wy | add bedrooms, study room/entertainment & family room at 1st fl. , remodel kitchen & bathroom, add one powder rm at 2nd fl. 24" to create 8-6 ceiling height at 1st fl.Details
add bedrooms, study room/entertainment & family room at 1st fl. , remodel kitchen & bathroom, add one powder rm at 2nd fl. 24" to create 8-6 ceiling height at 1st fl. | $56,000 |
| Mar 22, 2018 | Completed final sign-off May 2019 | 14 Fairfield Wy | remodel (e) kitchen & bathroom at 2nd floor.Details
remodel (e) kitchen & bathroom at 2nd floor. | $28,000 |
| Feb 12, 2018 | Completed final sign-off Aug 2018 | 410 Townsend St | project consists only of barrier removal. restroom access upgrades. demolition of extg 2nd & 3rd restroom plmg fixture finishes & accessories. new plmg fixture, finishes, and access. extg cieling and lighting fixture to remain. n/a for maherDetails
project consists only of barrier removal. restroom access upgrades. demolition of extg 2nd & 3rd restroom plmg fixture finishes & accessories. new plmg fixture, finishes, and access. extg cieling and lighting fixture to remain. n/a for maher | $100,000 |
| Jan 12, 2018 | Completed final sign-off Jan 2019 | 415 34th Av | remodel e bath on 2nd flDetails
remodel e bath on 2nd fl | $5,000 |
| Oct 18, 2017 | Completed final sign-off Apr 2018 | 68 Glover St | replace (e) kitchen & laundry room and bathroom on the 3rd floor top unit. add new furnace and sub-panel. rewire all outlets light on the third floor. replace 4 aluminum windows at the front of the building & 10 at the rear façade on top unit. all windows wood hung@front .32u factorDetails
replace (e) kitchen & laundry room and bathroom on the 3rd floor top unit. add new furnace and sub-panel. rewire all outlets light on the third floor. replace 4 aluminum windows at the front of the building & 10 at the rear façade on top unit. all windows wood hung@front .32u factor | $30,000 |
| Aug 10, 2017 | Completed final sign-off Aug 2018 | 1858 26th Av | remodel (e) bathroom on 2/fDetails
remodel (e) bathroom on 2/f | $8,000 |
| May 31, 2017 | Never finaled issued Jun 2017, no final | 875 Vallejo St | front building revision to 201704204421, convert e powder room to full bath on 2nd flDetails
front building revision to 201704204421, convert e powder room to full bath on 2nd fl | $2,000 |
| Mar 20, 2017 | Completed final sign-off Mar 2018 | 486 Molimo Dr | remodel e kitchen on 2nd fl. remove walls between kitchen and living rm. remove walls at stairwayDetails
remodel e kitchen on 2nd fl. remove walls between kitchen and living rm. remove walls at stairway | $12,000 |
| Feb 24, 2017 | Never finaled issued Feb 2017, no final | 176 Morningside Dr | revision to 201612306366 structural revisions to (e) kitchen areaDetails
revision to 201612306366 structural revisions to (e) kitchen area | $2,000 |
| Dec 30, 2016 | Completed final sign-off Mar 2018 | 176 Morningside Dr | remodel (e) kitchen, breakfast nook, closet & laundry area on 1st floor.Details
remodel (e) kitchen, breakfast nook, closet & laundry area on 1st floor. | $13,000 |
| Aug 12, 2016 | Never finaled issued Aug 2016, no final | 2760 Sacramento St | replace kitchen floor tile, replace top cabinet & replace island counter top. replace 2 windows at kitchen.Details
replace kitchen floor tile, replace top cabinet & replace island counter top. replace 2 windows at kitchen. | $7,000 |
| Jun 2, 2016 | Never finaled issued Jun 2016, no final | 2470 Broadway | non structural interior demolition, remove sheetrock, cabinets, fixtures for exploratory demolition for inspection by architect & engineer. new space to be configurated under seperate permit.Details
non structural interior demolition, remove sheetrock, cabinets, fixtures for exploratory demolition for inspection by architect & engineer. new space to be configurated under seperate permit. | $1,000 |
| Jan 29, 2016 | Completed final sign-off Jun 2017 | 928 Edinburgh St | unit legalization ordinance# 43-14. legalization of (e) unauthorized dwelling units under ordinance# 43-14. installed without permit.Details
unit legalization ordinance# 43-14. legalization of (e) unauthorized dwelling units under ordinance# 43-14. installed without permit. | $700 |
| Jan 29, 2016 | Never finaled issued Feb 2016, no final | 2790 19th Av | unit #29 on 3rd floor - remodel existing bathroom - replace existing sink, toilet, floor tile & wall tile. replace bathtub to shower. replace vent & new l.e.d. light at bathroom.Details
unit #29 on 3rd floor - remodel existing bathroom - replace existing sink, toilet, floor tile & wall tile. replace bathtub to shower. replace vent & new l.e.d. light at bathroom. | $3,000 |
| Oct 21, 2015 | Completed final sign-off Nov 2016 | 417 34th Av | 3rd floor unit 417: remodel (e) kitchen and bathroomDetails
3rd floor unit 417: remodel (e) kitchen and bathroom | $20,000 |
| Sep 29, 2015 | Completed final sign-off Feb 2016 | 2312 Washington St | revision to 2014-0910-6000 - relocate interior stairway @ 1st floor and 2nd floor. reconfigure & relocate bathroom & laundry area at 1st floor. add new wine room & mud room at 1st floor. relocate powder room at 2nd floor. maher naDetails
revision to 2014-0910-6000 - relocate interior stairway @ 1st floor and 2nd floor. reconfigure & relocate bathroom & laundry area at 1st floor. add new wine room & mud room at 1st floor. relocate powder room at 2nd floor. maher na | $3,000 |
| Aug 5, 2015 | Completed final sign-off Feb 2016 | 663 Marina Bl | remove bearing @ 2/f providing beam & new footing. n/a ordinance #155-13Details
remove bearing @ 2/f providing beam & new footing. n/a ordinance #155-13 | $25,000 |
| May 20, 2015 | Never finaled issued May 2015, no final | 1653 Mason St | front building: revision appl. 2015.0127.6724. interior revision at 1653 mason street. re-configured interior layout per plan. relocate 2 windows. show (e) rear brick wall to reflect existing condition and add furred wall per plan. maher n/a.Details
front building: revision appl. 2015.0127.6724. interior revision at 1653 mason street. re-configured interior layout per plan. relocate 2 windows. show (e) rear brick wall to reflect existing condition and add furred wall per plan. maher n/a. | $1,000 |
| Jan 27, 2015 | Never finaled issued Jan 2015, no final | 1653 Mason St | interior renovation at 2nd floor(1653 mason st ) only. front bldg. 1 enlarge extg bedroom at the back. 2)re-configure kitchen, dining, bathroom and laundry layout. 3) remove fireplace in living room.Details
interior renovation at 2nd floor(1653 mason st ) only. front bldg. 1 enlarge extg bedroom at the back. 2)re-configure kitchen, dining, bathroom and laundry layout. 3) remove fireplace in living room. | $50,000 |
| Sep 18, 2014 | Completed final sign-off Feb 2015 | 3615 Buchanan St | unit #304: remodel (e) kitchen and bathroom at apt 304 on 3rd floor, add new lighting at hallway and living area; maher n/aDetails
unit #304: remodel (e) kitchen and bathroom at apt 304 on 3rd floor, add new lighting at hallway and living area; maher n/a | $20,000 |
| Jun 30, 2014 | Completed final sign-off Feb 2016 | 2835 Washington St | convert existing bathroom into two bathrooms within building envelope.Details
convert existing bathroom into two bathrooms within building envelope. | $20,000 |
| Jun 30, 2014 | Completed final sign-off Nov 2014 | 361 Jules Av | encroach two feet into exist lightwell with new wall at 2nd floor. remodel (e) kitchen.Details
encroach two feet into exist lightwell with new wall at 2nd floor. remodel (e) kitchen. | $13,000 |
| Jun 30, 2014 | Completed final sign-off Feb 2015 | 2819 Santiago St | new bedrooms, bathroom,office room, family room and laundry room at 1st floor.Details
new bedrooms, bathroom,office room, family room and laundry room at 1st floor. | $40,000 |
| Feb 28, 2014 | Completed final sign-off Jun 2014 | 361 Jules Av | upgrade main water line to 1 inch, upgrade main electrical panel to 100 amp, bathroom remodel - new recess lights, shower pan, tub, vanity, toilet & insulation. lighting at bathroom is high efficacy unless controlled by manuel on occupancy sensor.Details
upgrade main water line to 1 inch, upgrade main electrical panel to 100 amp, bathroom remodel - new recess lights, shower pan, tub, vanity, toilet & insulation. lighting at bathroom is high efficacy unless controlled by manuel on occupancy sensor. | $4,000 |
| Dec 27, 2013 | Never finaled issued Jan 2014, no final | 904 Vallejo St | remodel existing kitchen and full bathroom and a halh bathroomDetails
remodel existing kitchen and full bathroom and a halh bathroom | $28,000 |
| Oct 4, 2013 | Never finaled issued Oct 2013, no final | 2835 Washington St | replace 16 windows ata rear & side of bldg.Details
replace 16 windows ata rear & side of bldg. | $4,000 |
| Jul 24, 2013 | Never finaled issued Oct 2013, no final | 2837 Washington St | remodel existing kitchen, dining room, master bath, 1st fl bath. remodel existing hall bath and closets into family room. add 1 hall bath on 2nd fl to replace existing laundry room. reduce west side lightwell at kitchen by 24" from 5'1 to 3'2 to property line. reduce east side lt well from 5'1 to 3'Details
remodel existing kitchen, dining room, master bath, 1st fl bath. remodel existing hall bath and closets into family room. add 1 hall bath on 2nd fl to replace existing laundry room. reduce west side lightwell at kitchen by 24" from 5'1 to 3'2 to property line. reduce east side lt well from 5'1 to 3' | $175,000 |
| Mar 13, 2013 | Completed final sign-off Apr 2013 | 486 Molimo Dr | replace rear deck at 1st floor, less than 50% & replace existing 6x8 beam.Details
replace rear deck at 1st floor, less than 50% & replace existing 6x8 beam. | $3,000 |
| Oct 4, 2012 | Completed final sign-off Jan 2013 | 494 Molimo Dr | remodel (e) kitchen on 2nd floor. remove walls at dining & living room. replace 4 windows in kind with aluminum window.Details
remodel (e) kitchen on 2nd floor. remove walls at dining & living room. replace 4 windows in kind with aluminum window. | $10,000 |
| Jun 12, 2012 | Completed final sign-off Sep 2012 | 439 Athens St | legalize (e) bathrm., bedrm., storage, entertainment rm. & laundry rm. @ 1st. flr. remodel (e) kitchen @ 2nd. flr. add (n) bathrm. & closet @ (n) master bedrm. @ 2nd. flr. replace (e) windows @ rear & right side of bldg. @ 2/f in kind, max u-factor=0.40Details
legalize (e) bathrm., bedrm., storage, entertainment rm. & laundry rm. @ 1st. flr. remodel (e) kitchen @ 2nd. flr. add (n) bathrm. & closet @ (n) master bedrm. @ 2nd. flr. replace (e) windows @ rear & right side of bldg. @ 2/f in kind, max u-factor=0.40 | $38,000 |
| May 17, 2012 | Completed final sign-off Jul 2012 | 86 Latona St | replace floor tiles, top cabinets & tiles at kitchen on 1st & 2nd. floor. replace tiles at bathroom on first & second floor.Details
replace floor tiles, top cabinets & tiles at kitchen on 1st & 2nd. floor. replace tiles at bathroom on first & second floor. | $8,000 |
| Jun 3, 2010 | Never finaled issued Jun 2010, no final | 649 Lake St | fixing bathtub leak. sheet rock and dryrot repair and paint. work on 651 lake st.Details
fixing bathtub leak. sheet rock and dryrot repair and paint. work on 651 lake st. | $5,000 |