Cranadore Construction Inc
- Based in
- Sonoma
- On San Francisco permits
- Apr 2019 to Jan 2026
- Last 24 months
- 2 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 23, 2026 | Completed final sign-off Mar 2026 | 965 Hyde St | to obtain final inspection for work approved under pa# 202006198933. all work is complete.Details
to obtain final inspection for work approved under pa# 202006198933. all work is complete. | |
| Jan 14, 2026 | Completed final sign-off Sep 2026 | 737 Hyde St | to comply w/nov 202546250: building facad, replace stucco front & backDetails
to comply w/nov 202546250: building facad, replace stucco front & back | $150,000 |
| Dec 8, 2023 | Completed final sign-off Apr 2024 | 25 Scenic Wy | repair dry rot front and side of property, includes stucco and plywood/water proofing approx 200 sf. repair dry rot @ interior front closet area. inkindDetails
repair dry rot front and side of property, includes stucco and plywood/water proofing approx 200 sf. repair dry rot @ interior front closet area. inkind | $12,000 |
| Aug 23, 2023 | Completed final sign-off Jul 2025 | 181 Collins St | reconfigure front stair. new handrail and guard to match neighboring properties. replace existing stucco, lathe and vaport barrier membrane. repair and replace flashing where required.Details
reconfigure front stair. new handrail and guard to match neighboring properties. replace existing stucco, lathe and vaport barrier membrane. repair and replace flashing where required. | $50,000 |
| Jun 9, 2021 | Completed final sign-off Apr 2022 | 1695 Mission St | barrier removal - provide 1 new all/gender restroom.Details
barrier removal - provide 1 new all/gender restroom. | $20,000 |
| May 21, 2021 | Completed final sign-off Oct 2022 | 2578 Sutter St | as build for pa# 201204118123. to document changes throughout.Details
as build for pa# 201204118123. to document changes throughout. | |
| Nov 10, 2020 | Completed final sign-off Jul 2024 | 1212 Union St | interior remodel for floors 1/2/3 in 2-unit bldg. convert 1212a union st commercial space into residential and add to (e) 1212 union st (lower unit). modifications to front facade include the following: new alum clad casements in (e) openings, removal of door and storefront window at com maher n/aDetails
interior remodel for floors 1/2/3 in 2-unit bldg. convert 1212a union st commercial space into residential and add to (e) 1212 union st (lower unit). modifications to front facade include the following: new alum clad casements in (e) openings, removal of door and storefront window at com maher n/a | $145,000 |
| Apr 9, 2019 | Completed final sign-off Jul 2024 | 1212 Union St | voluntary foundation seismic upgrade, infill, new bathroom. relocating and adding closet.Details
voluntary foundation seismic upgrade, infill, new bathroom. relocating and adding closet. | $50,000 |