Cp/M Company Inc.
- Based in
- Oakland
- On San Francisco permits
- Apr 2008 to Feb 2024
- Last 24 months
- 0 permits filed
26 permits since 2000: 24 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 6, 2024 | Completed final sign-off Mar 2024 | 917 Central Av | revision to pa# 2015-1223-5837 fill-in living space under approved 2nd fl deck. revised bathroom layout on 1st fl. no structural changesDetails
revision to pa# 2015-1223-5837 fill-in living space under approved 2nd fl deck. revised bathroom layout on 1st fl. no structural changes | $25,000 |
| Aug 17, 2022 | Completed final sign-off Jan 2024 | 917 Central Av | rev to pa# 2015-1223-5837: new cmu wall at property line, stairs and sauna and turtoise habitatDetails
rev to pa# 2015-1223-5837: new cmu wall at property line, stairs and sauna and turtoise habitat | |
| Sep 28, 2021 | Completed final sign-off Dec 2021 | 2231 Turk Bl | install 7 temporary soldier beams and grade back yard less than 50 cyDetails
install 7 temporary soldier beams and grade back yard less than 50 cy | $20,000 |
| Oct 10, 2018 | Completed final sign-off Mar 2024 | 917 Central Av | structural revision to 201512235837 modify foundation design to mat slab. (prev. spread ftg & helical piles) & update steel speacial moment framesDetails
structural revision to 201512235837 modify foundation design to mat slab. (prev. spread ftg & helical piles) & update steel speacial moment frames | |
| Jul 12, 2018 | Completed final sign-off Mar 2024 | 917 Central Av | revisionto 201512235837 per dbi correction notice dated 7/2/18 by m. hernandez sr. insp for replacement of property line walls in same location per chapter 1403 & 23 structure to remain in place. repair of dryrot and non conventional framing.Details
revisionto 201512235837 per dbi correction notice dated 7/2/18 by m. hernandez sr. insp for replacement of property line walls in same location per chapter 1403 & 23 structure to remain in place. repair of dryrot and non conventional framing. | $6,000 |
| Jul 11, 2018 | Completed final sign-off Mar 2024 | 917 Central Av | temp shoring of (e) bldDetails
temp shoring of (e) bld | $5,000 |
| Aug 26, 2016 | Completed final sign-off Feb 2017 | 768 44th Av | repair dry rot at front of the building and under (e) exterior stair repair stucco in-kind. rev. to 201512165235Details
repair dry rot at front of the building and under (e) exterior stair repair stucco in-kind. rev. to 201512165235 | $200 |
| Dec 23, 2015 | Completed final sign-off Mar 2024 | 917 Central Av | add partial 4th flr. vertical addition & rear horizontal addition @ 2nd/3rd fl. interior remodel of (e) kitchen & bathrooms, legalize (e) unit @ 1st flr, widen (e) driveway. seimic upgrade, replace (e) windows with marvin wood clad, (n) ext. trim & siding.Details
add partial 4th flr. vertical addition & rear horizontal addition @ 2nd/3rd fl. interior remodel of (e) kitchen & bathrooms, legalize (e) unit @ 1st flr, widen (e) driveway. seimic upgrade, replace (e) windows with marvin wood clad, (n) ext. trim & siding. | $675,000 |
| Dec 16, 2015 | Completed final sign-off Mar 2017 | 768 44th Av | 1 story infill under (e) sunroom provide rooms down in (e) garage, replace (e) pantry with new interior stair & remove (e) exterior stair,all non-bearing walls & revised interior beam.Details
1 story infill under (e) sunroom provide rooms down in (e) garage, replace (e) pantry with new interior stair & remove (e) exterior stair,all non-bearing walls & revised interior beam. | $58,000 |
| Nov 6, 2015 | Completed final sign-off Feb 2017 | 768 44th Av | remodel (e) kitchen and bathroom, appliances & fixtures, same location. all lights high efficacy and gfi circuits per nec, new cabinets. no walls moved, removed, add or infilled. all existing layouts to remain the same.Details
remodel (e) kitchen and bathroom, appliances & fixtures, same location. all lights high efficacy and gfi circuits per nec, new cabinets. no walls moved, removed, add or infilled. all existing layouts to remain the same. | $55,000 |
| Oct 16, 2015 | Completed final sign-off Jun 2016 | 2125 Hayes St | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. | $65,000 |
| Jul 21, 2015 | Expired or cancelled expired Mar 2026 | 1734 29th Av | demolish a storage shed at rear of existing yDetails
demolish a storage shed at rear of existing y | $3,000 |
| Jul 14, 2015 | Completed final sign-off Dec 2015 | 1842 40th Av | kitchen remodel, remove e non bearing wall, all lights high effacacy, electric and plumbingDetails
kitchen remodel, remove e non bearing wall, all lights high effacacy, electric and plumbing | $50,000 |
| Nov 5, 2014 | Completed final sign-off Jun 2018 | 1734 29th Av | horizontal & vertical addition at rear of (e) sfh, home include infill of lightwells, removal of (e) interior non-bearing walls & stair to garage to accomodate for new stair & new family room, new conditioned area at ground floor.Details
horizontal & vertical addition at rear of (e) sfh, home include infill of lightwells, removal of (e) interior non-bearing walls & stair to garage to accomodate for new stair & new family room, new conditioned area at ground floor. | $80,000 |
| Oct 28, 2014 | Completed final sign-off Mar 2015 | 454 34th Av | remodel extg kitchen. relocate stove, remove non-bearing wall, new lights, cabinets, flooring. lighting & control per cec 150(k).Details
remodel extg kitchen. relocate stove, remove non-bearing wall, new lights, cabinets, flooring. lighting & control per cec 150(k). | $22,000 |
| Oct 3, 2014 | Completed final sign-off Mar 2015 | 454 34th Av | replace windows in existing openings. u-factor 0.32, composite at front elevation, double insulated low-eDetails
replace windows in existing openings. u-factor 0.32, composite at front elevation, double insulated low-e | $6,000 |
| Sep 30, 2014 | Completed final sign-off Mar 2015 | 454 34th Av | remodel 1 1/2 baths, new finishes, elec, plumb.Details
remodel 1 1/2 baths, new finishes, elec, plumb. | $50,000 |
| Aug 15, 2014 | Completed final sign-off Nov 2014 | 1842 40th Av | remodel 1 bathroom, new plumbing & electrical. no removal of (e) walls, fixtures in same location. to comply with cec150.0(k)5Details
remodel 1 bathroom, new plumbing & electrical. no removal of (e) walls, fixtures in same location. to comply with cec150.0(k)5 | $18,000 |
| Jun 6, 2014 | Completed final sign-off Sep 2014 | 2354 42nd Av | remodel (e) bathrooms, new fixtures, replace (e) tub & shower, new lighting and insulation, tile shower, add 1 sink. no change at wall, window and door.Details
remodel (e) bathrooms, new fixtures, replace (e) tub & shower, new lighting and insulation, tile shower, add 1 sink. no change at wall, window and door. | $40,000 |
| Nov 8, 2011 | Completed final sign-off Feb 2012 | 2801 Judah St | voluntary structural strengthening w/new plywood walls & steel frame, reinforce existing roof at rear.Details
voluntary structural strengthening w/new plywood walls & steel frame, reinforce existing roof at rear. | $20,000 |
| Oct 31, 2011 | Completed final sign-off Feb 2012 | 2801 Judah St | remodel of existing retail space on ground floor to include demolition, new partitions, lighting, electrical & restroom for disabled access.Details
remodel of existing retail space on ground floor to include demolition, new partitions, lighting, electrical & restroom for disabled access. | $8,000 |
| Jul 15, 2011 | Completed final sign-off Sep 2011 | 1309 Hyde St | kitchen cabinets and countertops, new kitchen appliances, no structural work. new flourescent lights and insulation. plumbing and electrical permits by trades.Details
kitchen cabinets and countertops, new kitchen appliances, no structural work. new flourescent lights and insulation. plumbing and electrical permits by trades. | $10,000 |
| Jun 20, 2011 | Completed final sign-off Jul 2011 | 1379 28th Av | to obtain for final inspection for work approved under app#2009-03-12-4016. all work has been completed.Details
to obtain for final inspection for work approved under app#2009-03-12-4016. all work has been completed. | |
| Jun 20, 2011 | Completed final sign-off Jul 2011 | 1379 28th Av | to obtain for final inspection for work approved under app#2009-04-20-6655. all work has been completed.Details
to obtain for final inspection for work approved under app#2009-04-20-6655. all work has been completed. | |
| Apr 20, 2009 | Never finaled issued Apr 2009, no final | 1379 28th Av | structure changes; (n) slab on grade (partial) @ foundation, add new beam @ 1st. flr. all changes marked as delta-2 on plan dated 09/15/08 per plan. refer to bpa#200712140541s1Details
structure changes; (n) slab on grade (partial) @ foundation, add new beam @ 1st. flr. all changes marked as delta-2 on plan dated 09/15/08 per plan. refer to bpa#200712140541s1 | $6,000 |
| Apr 29, 2008 | Completed final sign-off Dec 2008 | 636 04th Av | repair existing portch stair (12 risers) to first floor over grade.Details
repair existing portch stair (12 risers) to first floor over grade. | $5,000 |