Coyne Development
- Based in
- San Francisco
- On San Francisco permits
- Jul 2011 to Feb 2012
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 22, 2012 | Expired or cancelled cancelled Jun 2023 | 1480 Mcallister St | revise pa# 2011-0701-9408-remodel 1st floor master bedroom & bathroom and add one bath, remove special inspection 5b5 for moment resisting framesDetails
revise pa# 2011-0701-9408-remodel 1st floor master bedroom & bathroom and add one bath, remove special inspection 5b5 for moment resisting frames | |
| Dec 6, 2011 | Expired or cancelled cancelled Jun 2023 | 1480 Mcallister St | revision to pa# 2011-0701-9408-new plywood walls in lieu of steel frames, revise foundation system slab on grade with spread footing system to mat slabDetails
revision to pa# 2011-0701-9408-new plywood walls in lieu of steel frames, revise foundation system slab on grade with spread footing system to mat slab | $2,500 |
| Jul 1, 2011 | Expired or cancelled cancelled Jun 2023 | 1480 Mcallister St | partial voluntary structural strengthening 1st floor and foundation excavate and level area with new slab no exterior work to be done not work on 1st floor to 3rd floor.Details
partial voluntary structural strengthening 1st floor and foundation excavate and level area with new slab no exterior work to be done not work on 1st floor to 3rd floor. | $85,000 |