Permit GraphShortlistSan Francisco building permits since 2000

Cornerstone Environmental

Contractor license
722253
State license record
Based in
Concord
On San Francisco permits
Oct 2001 to Nov 2016
Last 24 months
0 permits filed

7 permits since 2000: 6 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Nov 22, 2016Completed
final sign-off Dec 2017
2 Richardson Avdecommissioning of an environmental remediation system. involves removal of a concrete slab on grade compound, chain link fencing, holding tank, remediation equipment, and remediation piping onsite and offsite.
Details
Permit
201611223306
Status
complete
Filed
Nov 22, 2016
Permit issued
Sep 13, 2017
Final sign-off
Dec 8, 2017
Declared cost
$125,000
Address
2 Richardson Av

decommissioning of an environmental remediation system. involves removal of a concrete slab on grade compound, chain link fencing, holding tank, remediation equipment, and remediation piping onsite and offsite.

Open the permit page

$125,000
Jan 9, 2013Completed
final sign-off Apr 2013
444 De Haro Stall floors install (7) sub slab vent sumps. install 4" alum. tubing to each vent point, manifold tubing to (2) roof penetrating. install fans on each roof vent point working on all floors.
Details
Permit
201301097578
Status
complete
Filed
Jan 9, 2013
Permit issued
Jan 9, 2013
Final sign-off
Apr 19, 2013
Declared cost
$21,000
Address
444 De Haro St

all floors install (7) sub slab vent sumps. install 4" alum. tubing to each vent point, manifold tubing to (2) roof penetrating. install fans on each roof vent point working on all floors.

Open the permit page

$21,000
Aug 28, 2012Never finaled
issued Sep 2013, no final
2 Richardson Avinstallation of underground piping under broderick street for soil remediation use, piping to connect to existing remediation piping and recovery unit located on site.
Details
Permit
201208288426
Status
issued
Filed
Aug 28, 2012
Permit issued
Sep 23, 2013
Declared cost
$61,185
Address
2 Richardson Av

installation of underground piping under broderick street for soil remediation use, piping to connect to existing remediation piping and recovery unit located on site.

Open the permit page

$61,185
Aug 10, 2012Completed
final sign-off Mar 2013
1175 Fell Stfence removal and disposal, equipment remocal and disposal, compond enclosure and bollard removval and disposal, backfill and resurfacing. 6" high curb.
Details
Permit
201208107087
Status
complete
Filed
Aug 10, 2012
Permit issued
Aug 14, 2012
Final sign-off
Mar 27, 2013
Declared cost
$25,000
Address
1175 Fell St

fence removal and disposal, equipment remocal and disposal, compond enclosure and bollard removval and disposal, backfill and resurfacing. 6" high curb.

Open the permit page

$25,000
Jul 5, 2012Completed
final sign-off Dec 2012
401 Treat Avexcavation of 1,290 cy of contaminated soil to be off hauled & disposed includes installation of temporary gate for truck exit onto harrison street. removal of approx 6,000 sq ft of ashphalt to allow soil excavation, area will be backfilled, compacted & resurfaced with 3" ac.
Details
Permit
201207054156
Status
complete
Filed
Jul 5, 2012
Permit issued
Oct 17, 2012
Final sign-off
Dec 17, 2012
Declared cost
$170,000
Address
401 Treat Av

excavation of 1,290 cy of contaminated soil to be off hauled & disposed includes installation of temporary gate for truck exit onto harrison street. removal of approx 6,000 sq ft of ashphalt to allow soil excavation, area will be backfilled, compacted & resurfaced with 3" ac.

Open the permit page

$170,000
Dec 21, 2004Completed
final sign-off Nov 2006
1200 Geneva Avupgrade extg soil vapor extration system and add a ground water treatment system/relocate trash enclosure
Details
Permit
200412211891
Status
complete
Filed
Dec 21, 2004
Permit issued
Oct 28, 2005
Final sign-off
Nov 1, 2006
Declared cost
$70,800
Address
1200 Geneva Av

upgrade extg soil vapor extration system and add a ground water treatment system/relocate trash enclosure

Open the permit page

$70,800
Oct 18, 2001Completed
final sign-off Nov 2002
1200 Geneva Avrevision to 9911290- replace exist process piping & supply electrical service & circuits to oxidizer
Details
Permit
200110181142
Status
complete
Filed
Oct 18, 2001
Permit issued
Jun 24, 2002
Final sign-off
Nov 15, 2002
Declared cost
$60,000
Address
1200 Geneva Av

revision to 9911290- replace exist process piping & supply electrical service & circuits to oxidizer

Open the permit page

$60,000