Control Air Enterprises Llc
- Based in
- Anaheim
- On San Francisco permits
- Jun 2026 to Jun 2026
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2026 | In progress issued Jun 2026 | 3200 California St | replace two existing 4,000 mbh gas-fired hot water boilers with four new 1,999 mbh high-efficiency boilers. replace (e) 210 gallon indirect hot water heater with new of same capacity. miscellaneous piping modifications. no increase in gas loads. not decrease in gravity loads.Details
replace two existing 4,000 mbh gas-fired hot water boilers with four new 1,999 mbh high-efficiency boilers. replace (e) 210 gallon indirect hot water heater with new of same capacity. miscellaneous piping modifications. no increase in gas loads. not decrease in gravity loads. | $50,000 |