Construction Guys Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2022 to Dec 2025
- Last 24 months
- 5 permits filed
7 permits since 2000: 1 completed, 5 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 23, 2025 | In progress issued Dec 2025 | 133 Dolores St | repar minor wood stair rail and wood patching @ rear. not street visible.Details
repar minor wood stair rail and wood patching @ rear. not street visible. | $500 |
| Sep 5, 2025 | Completed final sign-off Jan 2026 | 1952 Mcallister St | replace 5 windows, to comply with nov 202538966 item #8, same size, same location, same material.Details
replace 5 windows, to comply with nov 202538966 item #8, same size, same location, same material. | $2,500 |
| Aug 20, 2025 | In progress issued Oct 2025 | 28 Seneca Av | 2nd fl: remodel (e) kitchen & bathroom. add receed ceiling lights. upgrade (e) electricalDetails
2nd fl: remodel (e) kitchen & bathroom. add receed ceiling lights. upgrade (e) electrical | $35,000 |
| Jul 15, 2025 | In progress issued Jul 2025 | 958 Pacific Av | to abate nov 202539107 to include repair stucco siding at left front entry stair and buildling edge of building in kind .Details
to abate nov 202539107 to include repair stucco siding at left front entry stair and buildling edge of building in kind . | $15,000 |
| May 28, 2025 | In progress issued Aug 2025 | 28 Seneca Av | to comply with nov #202535848 to legalize (e) bathroom at the ground flDetails
to comply with nov #202535848 to legalize (e) bathroom at the ground fl | $15,000 |
| Jul 10, 2024 | In progress issued Aug 2025 | 38 Seneca Av | to comply with nov# 202306140 (work w/o permit on the ground floor). add 749 sqft attached adu (state adu) on ground floor. (see planning's note on square footage)Details
to comply with nov# 202306140 (work w/o permit on the ground floor). add 749 sqft attached adu (state adu) on ground floor. (see planning's note on square footage) | $100,000 |
| Sep 13, 2022 | Never finaled issued Sep 2022, no final | 2619 Quintara St | replace siding on right side of exterior wall. paint siding- street visible.Details
replace siding on right side of exterior wall. paint siding- street visible. | $12,500 |