Consolidated Construction Inc
- Based in
- San Rafael
- On San Francisco permits
- Jun 2011 to Apr 2023
- Last 24 months
- 0 permits filed
15 permits since 2000: 12 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2023 | Completed final sign-off Sep 2023 | 2327 Bay St | revision to pa 2022-0912-2298 includes the widening of the existing interior doorway openings at kitchen, living and dining roomDetails
revision to pa 2022-0912-2298 includes the widening of the existing interior doorway openings at kitchen, living and dining room | $2,500 |
| Sep 12, 2022 | Completed final sign-off Sep 2023 | 2327 Bay St | 3/f -reconfiguration of primary bedroom to add a new bathroom and reconfigure laundry area.Details
3/f -reconfiguration of primary bedroom to add a new bathroom and reconfigure laundry area. | $50,000 |
| Jun 9, 2022 | Completed final sign-off May 2023 | 2774 Union St | adding structural drawing to pa# 202205164343. amending kitchen & bathroom remodel. one wall found to be load bearing. adding beam and lvl to floor joists overhead per building engineer plan.Details
adding structural drawing to pa# 202205164343. amending kitchen & bathroom remodel. one wall found to be load bearing. adding beam and lvl to floor joists overhead per building engineer plan. | $20,000 |
| May 16, 2022 | Completed final sign-off May 2023 | 2774 Union St | kitchen and bath remodel, changing partiation wallsDetails
kitchen and bath remodel, changing partiation walls | $45,000 |
| Apr 6, 2021 | Completed final sign-off Aug 2021 | 529 Duboce Av | unit b kitchen and bath remodel demo and infill wallsDetails
unit b kitchen and bath remodel demo and infill walls | $30,000 |
| Aug 27, 2019 | Completed final sign-off Aug 2020 | 2470 Filbert St | replace 2 (e) single car garage doors with new 2 metal sectional panel roll up doors in existing openings.Details
replace 2 (e) single car garage doors with new 2 metal sectional panel roll up doors in existing openings. | $5,000 |
| Dec 4, 2014 | Never finaled issued Dec 2014, no final | 542 Valley St | reroofingDetails
reroofing | $5,000 |
| Nov 25, 2014 | Never finaled issued Dec 2014, no final | 542 Valley St | interior remodel of two second floor bathrooms. install 4 new skylights and relocate 3 existing skylights.Details
interior remodel of two second floor bathrooms. install 4 new skylights and relocate 3 existing skylights. | $30,000 |
| Apr 4, 2014 | Completed final sign-off May 2014 | 2383 Union St | remove non compliant gate and fence structure and replace in compliance with nov 201456091Details
remove non compliant gate and fence structure and replace in compliance with nov 201456091 | $15,000 |
| Apr 2, 2013 | Completed final sign-off Apr 2013 | 2860 Pierce St | revision to appl #2012.12.04.5429 -unit #3 & main residence, 1st & 2nd floor: new powder rooms.Details
revision to appl #2012.12.04.5429 -unit #3 & main residence, 1st & 2nd floor: new powder rooms. | $15,000 |
| Dec 14, 2012 | Completed final sign-off Apr 2013 | 2860 Pierce St | widen extg 9' garage doorway at north and of west wall to 12'. install steel beam over doorway.Details
widen extg 9' garage doorway at north and of west wall to 12'. install steel beam over doorway. | $15,000 |
| Dec 4, 2012 | Completed final sign-off Apr 2013 | 2860 Pierce St | new water closets (toilet & sink) on unit #1 @ basement & unit #5 @ 1st floor, kitchen & bath upgrade on unit #4 @ 3rd floor.Details
new water closets (toilet & sink) on unit #1 @ basement & unit #5 @ 1st floor, kitchen & bath upgrade on unit #4 @ 3rd floor. | $40,000 |
| Sep 20, 2012 | Completed final sign-off Apr 2013 | 2860 Pierce St | 3rd floor-reinforce e roof area at se corner of 3rd fl level for roof deck use accessible from 2860 pierce onlyDetails
3rd floor-reinforce e roof area at se corner of 3rd fl level for roof deck use accessible from 2860 pierce only | $25,000 |
| Apr 5, 2012 | Never finaled issued Apr 2012, no final | 542 Valley St | increase valuation of pa #1241722. (201106218616). same scope of work as per pa#201106218616.Details
increase valuation of pa #1241722. (201106218616). same scope of work as per pa#201106218616. | $50,000 |
| Jun 21, 2011 | Completed final sign-off Apr 2012 | 542 Valley St | remove wall at kitchen, replace e door at living room with new window. replace e window at study with new window, convert study to tea room, new window at master bath and bedroom. voluntary plywood strengthening (n) grade beam. kitchen remodel, (n) post & foundation per plan.Details
remove wall at kitchen, replace e door at living room with new window. replace e window at study with new window, convert study to tea room, new window at master bath and bedroom. voluntary plywood strengthening (n) grade beam. kitchen remodel, (n) post & foundation per plan. | $19,000 |