- 6 permits filed
33 permits since 2000: 18 completed, 7 in progress, 8 never finaled.
Of the 8 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 7, 2026 | In progress issued Jan 2026 | 1020 Green St | interior remodel to convert (e) bathroom to laundry roomDetails
interior remodel to convert (e) bathroom to laundry room | $6,000 |
| Oct 9, 2025 | In progress issued Oct 2025 | 1020 Green St | remodel of 3 bathroom like for like. remodel of kitchen like for like.Details
remodel of 3 bathroom like for like. remodel of kitchen like for like. | $120,000 |
| Apr 30, 2025 | In progress issued May 2025 | 603 San Bruno Av | revision to pa #2022-0602-5520 revise window sill height at garage portal infill of (e) garage door opening. no structural workDetails
revision to pa #2022-0602-5520 revise window sill height at garage portal infill of (e) garage door opening. no structural work | $3,000 |
| Mar 31, 2025 | In progress issued Jul 2025 | 603 San Bruno Av | interior remodel to create adu on 1/f of (e) 2 level, single unit, residential building.Details
interior remodel to create adu on 1/f of (e) 2 level, single unit, residential building. | $85,000 |
| Mar 27, 2025 | Completed final sign-off May 2025 | 1380 Chestnut St | modify e wall framing at exit passageway to comply with pge requirements, new 1 hr fire rated non structural partition ref 202106142387Details
modify e wall framing at exit passageway to comply with pge requirements, new 1 hr fire rated non structural partition ref 202106142387 | $10,000 |
| Feb 26, 2025 | In progress issued Feb 2025 | 603 San Bruno Av | administrative permit to remove fire sprinkler requirement for issued permit 2022-0602-5520. revision to approvied issued permit.Details
administrative permit to remove fire sprinkler requirement for issued permit 2022-0602-5520. revision to approvied issued permit. | |
| Jul 16, 2024 | Completed final sign-off Mar 2025 | 1453 Francisco St | kitchen and bathroom remodel. new cabinets, electrical panel. all new electrical, new gas line location. no removal of wallsDetails
kitchen and bathroom remodel. new cabinets, electrical panel. all new electrical, new gas line location. no removal of walls | $109,000 |
| Jul 9, 2024 | Completed final sign-off Dec 2024 | 3521 Webster St | interior remodel at 1st level storage room to convert to full bathroom. interior remodel at 3rd level bethroom - add toilet.Details
interior remodel at 1st level storage room to convert to full bathroom. interior remodel at 3rd level bethroom - add toilet. | $15,000 |
| Jul 8, 2024 | In progress issued Jul 2024 | 1455 Francisco St | kitchen and bathroom remodel. new cabinets, electrical panel, all new electrical new gas line location.Details
kitchen and bathroom remodel. new cabinets, electrical panel, all new electrical new gas line location. | $109,000 |
| Jul 8, 2024 | Completed final sign-off Oct 2024 | 3521 Webster St | replacing 8 windows at the back of building.Details
replacing 8 windows at the back of building. | $17,000 |
| Sep 1, 2023 | Never finaled issued Sep 2023, no final | 349 Banks St | dryrot on front and south side of building. stucco replacement in-kind 700 sq.ft. max.Details
dryrot on front and south side of building. stucco replacement in-kind 700 sq.ft. max. | $20,000 |
| Jan 26, 2023 | Completed final sign-off Sep 2023 | 3521 Webster St | kitchen remodel: new cabinets, electrical panel, all new electrical, new gas line location. no moving walls.Details
kitchen remodel: new cabinets, electrical panel, all new electrical, new gas line location. no moving walls. | $30,000 |
| Jun 2, 2022 | In progress issued Feb 2024 | 603 San Bruno Av | remodel & addition to (e) sfh. proposed includes total of (2) units (+1 adu under separate permit). lvl 1 5'-0" rear yard addition (new adu at lvl 1 under sep. permit unit c). remodel (e) 2nd lvl +5'-0" rear yard addition (unit a). new lvl 3 (unit b).Details
remodel & addition to (e) sfh. proposed includes total of (2) units (+1 adu under separate permit). lvl 1 5'-0" rear yard addition (new adu at lvl 1 under sep. permit unit c). remodel (e) 2nd lvl +5'-0" rear yard addition (unit a). new lvl 3 (unit b). | $700,000 |
| Mar 21, 2022 | Completed final sign-off Jun 2022 | 638 48th Av | kitchen and bathroom remodel with new electric and plumbing. no walls to be removed.Details
kitchen and bathroom remodel with new electric and plumbing. no walls to be removed. | $55,000 |
| Jan 3, 2022 | Completed final sign-off Feb 2024 | 478 04th Av | remove and replace rear stairs in kind. add new foundation under rear of building.Details
remove and replace rear stairs in kind. add new foundation under rear of building. | $15,000 |
| Jun 14, 2021 | Never finaled issued Aug 2023, no final | 1380 Chestnut St | new unit under density at level 1. change use from r-3 to r-2.seismic strengthening at level 1. fire sprinklers at level 1 (deferred). manual fire alram at all units (deferred).Details
new unit under density at level 1. change use from r-3 to r-2.seismic strengthening at level 1. fire sprinklers at level 1 (deferred). manual fire alram at all units (deferred). | $175,000 |
| Apr 19, 2021 | Completed final sign-off Sep 2021 | 636 48th Av | kitchen and bathroom remodel with new electric and plumbing. no walls to be removed.Details
kitchen and bathroom remodel with new electric and plumbing. no walls to be removed. | $55,000 |
| Oct 15, 2020 | Completed final sign-off Mar 2021 | 549 Miramar Av | bathroom and laundry remodel. new plumbing and electricalDetails
bathroom and laundry remodel. new plumbing and electrical | $17,000 |
| Jul 15, 2020 | Never finaled issued Jul 2020, no final | 840 Kansas St | demo and repour concrete for garage floor. no excavation required: replace slab at original elevation. 4" min. thick slab, #4 rebar @ 18" o.c. with vapor barrier. no excavation required: replace slab at original elevation. 4" min. thick slab, #4 rebar @ 18" o.c. with vapor barrier.Details
demo and repour concrete for garage floor. no excavation required: replace slab at original elevation. 4" min. thick slab, #4 rebar @ 18" o.c. with vapor barrier. no excavation required: replace slab at original elevation. 4" min. thick slab, #4 rebar @ 18" o.c. with vapor barrier. | $12,000 |
| Feb 13, 2020 | Never finaled issued Feb 2020, no final | 470 23rd Av | new heat pump unit 4 at gr fl. ref 201704204482Details
new heat pump unit 4 at gr fl. ref 201704204482 | $500 |
| Jan 31, 2020 | Never finaled issued Jan 2020, no final | 1620 Broadway | unit #4: patching 45 sq ft of wood floors, raising headers at hallway 10" from 106" to 116". replace header w/ code compliant header (table r602.7), create new opening above (e) closet w. code compliant header, furr out ceiling & rear wall at master w/ new drywall for acoustical separationDetails
unit #4: patching 45 sq ft of wood floors, raising headers at hallway 10" from 106" to 116". replace header w/ code compliant header (table r602.7), create new opening above (e) closet w. code compliant header, furr out ceiling & rear wall at master w/ new drywall for acoustical separation | $38,000 |
| Dec 6, 2019 | Completed final sign-off Apr 2020 | 470 23rd Av | to obtain final inspection for work approved under pa 201707313418 & 201612205484. all work is complete.Details
to obtain final inspection for work approved under pa 201707313418 & 201612205484. all work is complete. | |
| Dec 6, 2019 | Completed final sign-off Apr 2020 | 470 23rd Av | to obtain final inspection for work approved under pa 201607223144 & 201607283696. all work is completeDetails
to obtain final inspection for work approved under pa 201607223144 & 201607283696. all work is complete | |
| Oct 17, 2019 | Never finaled issued Aug 2023, no final | 349 Banks St | repair of front stairs steps (less than 50% replacement).Details
repair of front stairs steps (less than 50% replacement). | $20,000 |
| Feb 16, 2018 | Completed final sign-off Jun 2019 | 2755 35th Av | existing sfd remodel to include 1st fl bedrm, rec room, bar area, laundry, 1 full bath. extend rear wall under 2nd fl overhang. 2nd fl bath remodel, relocation of interior stair, addition of rear wood deckDetails
existing sfd remodel to include 1st fl bedrm, rec room, bar area, laundry, 1 full bath. extend rear wall under 2nd fl overhang. 2nd fl bath remodel, relocation of interior stair, addition of rear wood deck | $80,000 |
| Dec 29, 2017 | Completed final sign-off May 2018 | 549 Miramar Av | kitchen remodel, new cabinets, new lighting, new plumbingDetails
kitchen remodel, new cabinets, new lighting, new plumbing | $25,000 |
| Apr 20, 2017 | Completed final sign-off Mar 2021 | 470 23rd Av | convert portion of gr fl to studio unit 4 per ord# 42-14. add kitchen at rear of garage.Details
convert portion of gr fl to studio unit 4 per ord# 42-14. add kitchen at rear of garage. | $20,000 |
| Mar 7, 2017 | Completed final sign-off Oct 2017 | 219 States St | top unit: remodel of 2 (e) bathrooms, new plumbing, new electricalDetails
top unit: remodel of 2 (e) bathrooms, new plumbing, new electrical | $60,000 |
| Aug 16, 2016 | Never finaled issued Aug 2016, no final | 90 Palm Av | dry rot on the south backside of building and painting all exterior building.Details
dry rot on the south backside of building and painting all exterior building. | $1,000 |
| Sep 29, 2015 | Never finaled issued Sep 2015, no final | 4131 California St | inkind repair/replace of wood siding on northwest building elevation caused by dry rot damageDetails
inkind repair/replace of wood siding on northwest building elevation caused by dry rot damage | $4,000 |
| Dec 11, 2014 | Completed final sign-off Feb 2016 | 2079 35th Av | new rear deck @ ground floor level. new 3 feet horizontal addition @ rear of building. new bedroom, bathroom & family room @ ground floor.Details
new rear deck @ ground floor level. new 3 feet horizontal addition @ rear of building. new bedroom, bathroom & family room @ ground floor. | $40,000 |
| Oct 3, 2014 | Completed final sign-off Dec 2014 | 1452 24th Av | dry rot in front left side of building at stairway entry. new 2x6 framing, plywood, and stucco. not to exceed 150 square feet.Details
dry rot in front left side of building at stairway entry. new 2x6 framing, plywood, and stucco. not to exceed 150 square feet. | $4,000 |
| Apr 25, 2013 | Completed final sign-off Aug 2013 | 2755 35th Av | remodel kitchen, new cabinets, new lighting, new plumbingDetails
remodel kitchen, new cabinets, new lighting, new plumbing | $10,000 |