Concept Design And Build
- Based in
- San Francisco
- On San Francisco permits
- Aug 2007 to Jul 2026
- Last 24 months
- 9 permits filed
19 permits since 2000: 14 completed, 3 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2026 | In progress issued Aug 2026 | 95 Junipero Serra Bl | rewire entire house ref #e202606111478.Details
rewire entire house ref #e202606111478. | |
| Jun 10, 2026 | In progress issued Jun 2026 | 95 Junipero Serra Bl | remodel kitchen. remodel 2 full bathrooms, 1 half bathroom. all in kind.Details
remodel kitchen. remodel 2 full bathrooms, 1 half bathroom. all in kind. | $45,000 |
| Feb 20, 2026 | Completed final sign-off Mar 2026 | 3040 Jackson St | unit #1: replace kitchen cabinets & countertops, replace bathroom cabinet & tile, all in kind, repair flooring & paint. update plumbing and electrical.Details
unit #1: replace kitchen cabinets & countertops, replace bathroom cabinet & tile, all in kind, repair flooring & paint. update plumbing and electrical. | $30,000 |
| Oct 22, 2025 | Completed final sign-off Dec 2025 | 1359 10th Av | unit#1: replace kitchen cabinets and countertops, replace bathroom cabinets and tile, replace flooring, paint, all in kind, same size & location, interior work onlyDetails
unit#1: replace kitchen cabinets and countertops, replace bathroom cabinets and tile, replace flooring, paint, all in kind, same size & location, interior work only | $35,000 |
| Aug 11, 2025 | Completed final sign-off Aug 2025 | 2945 Baker St | to comply with nov 202539609: replace tradesman hallway doors, 1 is street visible. install new fire rated door at garbage/electric meter room, and install doors closer. items #2 & #4.Details
to comply with nov 202539609: replace tradesman hallway doors, 1 is street visible. install new fire rated door at garbage/electric meter room, and install doors closer. items #2 & #4. | $5,000 |
| May 23, 2025 | Completed final sign-off Jun 2025 | 1359 10th Av | #4: to comply with complaint 202537902. kitchen replace cabinets and countertops. bathroom replace cabinet and tile. replace flooring and paint. all in kind.Details
#4: to comply with complaint 202537902. kitchen replace cabinets and countertops. bathroom replace cabinet and tile. replace flooring and paint. all in kind. | $25,000 |
| Feb 18, 2025 | Completed final sign-off Jun 2025 | 1983 15th Av | replace (e) 20 linear feet of concrete retaining wall located at south wall of rear detached garage. replacement wall not to exceed 6 ft in heightDetails
replace (e) 20 linear feet of concrete retaining wall located at south wall of rear detached garage. replacement wall not to exceed 6 ft in height | $39,000 |
| Jan 27, 2025 | Completed final sign-off Jun 2025 | 1983 15th Av | revision to 202207118148 (rear addition) 1st/f: reconfigure 2 bathrooms, laundry & meter room, update location of 2 plywood shearwalls & 4) holddowns. 2nd/f: add transome windows over rear sliding doors in living rmDetails
revision to 202207118148 (rear addition) 1st/f: reconfigure 2 bathrooms, laundry & meter room, update location of 2 plywood shearwalls & 4) holddowns. 2nd/f: add transome windows over rear sliding doors in living rm | |
| Oct 10, 2024 | Completed final sign-off Jan 2025 | 150 28th St | unit #6 replace kitchen & bathroom cabinets, countertops. all in kindDetails
unit #6 replace kitchen & bathroom cabinets, countertops. all in kind | $25,000 |
| Jun 24, 2024 | Completed final sign-off Nov 2024 | 462 02nd Av | unit #1: replace kitchen & bathroom cabinets, tile, & countertops. all in kind.Details
unit #1: replace kitchen & bathroom cabinets, tile, & countertops. all in kind. | $10,000 |
| Oct 2, 2023 | Completed final sign-off Dec 2024 | 586 Valley St | revision to bpa 200708018475 new retractable skylight hatch access to previously approved roof deckDetails
revision to bpa 200708018475 new retractable skylight hatch access to previously approved roof deck | $10,000 |
| Mar 29, 2023 | Completed final sign-off Aug 2024 | 154 Funston Av | remodel kitchen, construct (n) bathroom, remodel (e) bathroom, construct (n) bedroom, remove walls between living room & (n) kitchen at 154 funston 3/f. remodel kitchen, construct (n) bathroom, remodel (e) bathroom, remove walls between living room, (n) kitchen & dining room. (n) staircase connectinDetails
remodel kitchen, construct (n) bathroom, remodel (e) bathroom, construct (n) bedroom, remove walls between living room & (n) kitchen at 154 funston 3/f. remodel kitchen, construct (n) bathroom, remodel (e) bathroom, remove walls between living room, (n) kitchen & dining room. (n) staircase connectin | $250,000 |
| Jul 11, 2022 | Completed final sign-off Jun 2025 | 1983 15th Av | 2-story rear horizontal addition. roof deck over each level.Details
2-story rear horizontal addition. roof deck over each level. | $146,000 |
| Jun 21, 2022 | In progress issued Oct 2025 | 1310 Clayton St | convert three existing carports into three adu units at the ground floor per the local adu program ordinance 162-16.Details
convert three existing carports into three adu units at the ground floor per the local adu program ordinance 162-16. | $200,000 |
| May 4, 2022 | Never finaled issued Jul 2022, no final | 228 Fillmore St | provide shoring for basement foundation.Details
provide shoring for basement foundation. | $30,000 |
| Apr 22, 2022 | Completed final sign-off Jun 2025 | 1983 15th Av | addition work at 1st fl. addition of bathroom, remodel (e) bathroom, split north bed room into family room/bed room, new window, (alone north facing side setback) for smaller bedroomDetails
addition work at 1st fl. addition of bathroom, remodel (e) bathroom, split north bed room into family room/bed room, new window, (alone north facing side setback) for smaller bedroom | $48,000 |
| Dec 9, 2016 | Completed final sign-off Mar 2022 | 228 Fillmore St | demolish one story bldgDetails
demolish one story bldg | $45,000 |
| Dec 9, 2016 | Never finaled issued Nov 2018, no final | 228 Fillmore St | erect 3 stories & 3 dwelling unit mix use with type 5 construction.Details
erect 3 stories & 3 dwelling unit mix use with type 5 construction. | $900,000 |
| Aug 1, 2007 | Completed final sign-off Dec 2024 | 586 Valley St | to erect a new 2 story, type 5, 1 family dwelling unit building.Details
to erect a new 2 story, type 5, 1 family dwelling unit building. | $850,000 |