Community First Construction Corp
- Based in
- Petaluma
- On San Francisco permits
- Jul 2011 to Sep 2018
- Last 24 months
- 0 permits filed
13 permits since 2000: 6 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 7, 2018 | Never finaled issued Sep 2018, no final | 5150 Diamond Heights Bl | partial remodel of bathroom. no changes to walls or openings. replace (e) tub, surround, shower pan & new shower valves fixtures.Details
partial remodel of bathroom. no changes to walls or openings. replace (e) tub, surround, shower pan & new shower valves fixtures. | $10,000 |
| Dec 4, 2013 | Completed final sign-off Nov 2014 | 3675 20th St | ref 201308305666 adjust detail 4/s4 structural plans to show additional floor joists supporting removal of bearing wall. units 3675 & 3675 a.Details
ref 201308305666 adjust detail 4/s4 structural plans to show additional floor joists supporting removal of bearing wall. units 3675 & 3675 a. | |
| Nov 12, 2013 | Never finaled issued Dec 2013, no final | 1520 Gough St | remodel unit# 301. add a bedroom and closet. relocate kitchen fixtures and cabinets. remodel bathroom.Details
remodel unit# 301. add a bedroom and closet. relocate kitchen fixtures and cabinets. remodel bathroom. | $20,000 |
| Oct 31, 2013 | Completed final sign-off Mar 2014 | 795 Pine St | bathroom & kitchen remodel and replace all fixtures, all high efficiency lights.Details
bathroom & kitchen remodel and replace all fixtures, all high efficiency lights. | $15,000 |
| Oct 23, 2013 | Never finaled issued Oct 2013, no final | 1520 Gough St | remodel unit# 702. add a bedroom and closet. relocation and remodel of kitchen. remodel of (e) bathroom including new tiles, toilet and vanity. up grade of plumbing and electrical sts as needed. to comply with cec150(k) 8 & 10Details
remodel unit# 702. add a bedroom and closet. relocation and remodel of kitchen. remodel of (e) bathroom including new tiles, toilet and vanity. up grade of plumbing and electrical sts as needed. to comply with cec150(k) 8 & 10 | $25,000 |
| Oct 23, 2013 | Never finaled issued Oct 2013, no final | 947 Bush St | revision to app#201308023395 to build pony wall behind cabinet as requested by inspector.Details
revision to app#201308023395 to build pony wall behind cabinet as requested by inspector. | $150 |
| Sep 17, 2013 | Completed final sign-off Nov 2013 | 270 Turk St | unit #708:interior remodel. demo non-bearing walls at closet and kitchen. kitchen and bathroom remodel.Details
unit #708:interior remodel. demo non-bearing walls at closet and kitchen. kitchen and bathroom remodel. | $18,000 |
| Sep 13, 2013 | Completed final sign-off Aug 2014 | 3659 20th St | remodel units #3673a: add new closets, add laundry outlets, remove non bearing walls, relocate kitchen fixtures and cabinets, remodel bathroom, new tile, toilet and vanity. upgrade electrical & plumbing fixtures, reroute elec wires and plumbing as needed. add new gas heater in bedroom.Details
remodel units #3673a: add new closets, add laundry outlets, remove non bearing walls, relocate kitchen fixtures and cabinets, remodel bathroom, new tile, toilet and vanity. upgrade electrical & plumbing fixtures, reroute elec wires and plumbing as needed. add new gas heater in bedroom. | $25,000 |
| Aug 30, 2013 | Completed final sign-off Aug 2014 | 3659 20th St | remodel units #3675, 3675a: add new closets, add laundry outlets, remove non bearing walls, relocate kitchen fixtures and cabinets, remodel bathroom, new tile, toilet and vanity. upgrade electrical & plumbing fixtures, reroute elec wires and plumbing as needed.Details
remodel units #3675, 3675a: add new closets, add laundry outlets, remove non bearing walls, relocate kitchen fixtures and cabinets, remodel bathroom, new tile, toilet and vanity. upgrade electrical & plumbing fixtures, reroute elec wires and plumbing as needed. | $50,000 |
| Aug 7, 2013 | Completed final sign-off Dec 2013 | 947 Bush St | unit #7-remodel kitchen-move kitchen sink, remodel bathroom-convert tub/shower into shower, move vanity, upgrade electrical & plumbing fixturesDetails
unit #7-remodel kitchen-move kitchen sink, remodel bathroom-convert tub/shower into shower, move vanity, upgrade electrical & plumbing fixtures | $20,000 |
| Aug 2, 2013 | Never finaled issued Aug 2013, no final | 947 Bush St | #418 - 4th floor: remove non bearing wall. remove (e) plaster, insulate and drywall. add new closet, relocate fixtures, upgrade electric and plumbing fixtures. rerouting of electric wire and plumbing as neededDetails
#418 - 4th floor: remove non bearing wall. remove (e) plaster, insulate and drywall. add new closet, relocate fixtures, upgrade electric and plumbing fixtures. rerouting of electric wire and plumbing as needed | $20,000 |
| Mar 7, 2013 | Never finaled issued Mar 2013, no final | 1000 Daniel Burnham Ct | remove & replace cabinets & sink, add recess lights, double sink vanity @ bathroom. install tile floor in kitchen & bathroom in #309. building built in 1988Details
remove & replace cabinets & sink, add recess lights, double sink vanity @ bathroom. install tile floor in kitchen & bathroom in #309. building built in 1988 | $15,000 |
| Jul 8, 2011 | Expired or cancelled expired Dec 2012 | 1200 California St | we are going to remove & replace granite, paint cabinets, install new stove, oven, kitchen sink, install 6 can lights, hardwood floor, light to comply cec 150(k) @ 1 kitchen, no change watts window or doorsDetails
we are going to remove & replace granite, paint cabinets, install new stove, oven, kitchen sink, install 6 can lights, hardwood floor, light to comply cec 150(k) @ 1 kitchen, no change watts window or doors | $13,800 |