Communication Technology Services Llc
- Based in
- Hayward
- On San Francisco permits
- Jun 2011 to Feb 2026
- Last 24 months
- 4 permits filed
28 permits since 2000: 15 completed, 4 in progress, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 9, 2026 | In progress issued Feb 2026 | 747 Howard St | installing of proposed exhaust fan with ducting in (e) telcom room in mainDetails
installing of proposed exhaust fan with ducting in (e) telcom room in main | $208,000 |
| Feb 9, 2026 | In progress issued Feb 2026 | 747 Howard St | penthouse -installing of proposed exhaust fan with ducting in (e) telcom room in mainDetails
penthouse -installing of proposed exhaust fan with ducting in (e) telcom room in main | $87,000 |
| Dec 2, 2025 | In progress issued Dec 2025 | 730 Howard St | installation of new 100 amp sub panel with stepdown transformer at main das head 2nd room. moscone north and secondary location in moscone west. ref pa #202509185597Details
installation of new 100 amp sub panel with stepdown transformer at main das head 2nd room. moscone north and secondary location in moscone west. ref pa #202509185597 | $259,000 |
| Sep 18, 2025 | In progress issued Sep 2025 | 730 Howard St | cts to install ~ 25 linear feet of floor-mounted racks and cellular (das antenna systems) equipment in the head end of the electrical room on 2nd floor.Details
cts to install ~ 25 linear feet of floor-mounted racks and cellular (das antenna systems) equipment in the head end of the electrical room on 2nd floor. | $318,364 |
| Jul 10, 2019 | Expired or cancelled cancelled Jan 2026 | 1601 03rd St | installation of dc power plant and ups system requiered to support das system equipment planned for the chase center as a neutral host carrier solution by verizon n/a maherDetails
installation of dc power plant and ups system requiered to support das system equipment planned for the chase center as a neutral host carrier solution by verizon n/a maher | $2,000,000 |
| Jul 1, 2019 | Expired or cancelled cancelled Jan 2026 | 1601 03rd St | installation of distrubuted antenna system das for cellular coverage (verizon, att, t-mobile, sprint) at golden state warriors arena "chase center."Details
installation of distrubuted antenna system das for cellular coverage (verizon, att, t-mobile, sprint) at golden state warriors arena "chase center." | $10,000,000 |
| Nov 18, 2016 | Never finaled issued Feb 2017, no final | 222 02nd St | install the following in e das room: 1 new mmbs sprint cabinet, 1 new sprint bbu cabinet, 2 new 800 mhz rrhs, 2 new 1900 mhz rrhs, new elec to cabinetDetails
install the following in e das room: 1 new mmbs sprint cabinet, 1 new sprint bbu cabinet, 2 new 800 mhz rrhs, 2 new 1900 mhz rrhs, new elec to cabinet | $25,000 |
| Nov 1, 2016 | Completed final sign-off Nov 2016 | 1355 Market St | revision to 201412184050: no exterior donor antennas to be installed maher na sheets a1, a3Details
revision to 201412184050: no exterior donor antennas to be installed maher na sheets a1, a3 | |
| Nov 1, 2016 | Completed final sign-off Nov 2016 | 50 Fremont St | revision to 201410027918: no exterior donor antennas to be installed. sheet a 1 and sheet a3 majer naDetails
revision to 201410027918: no exterior donor antennas to be installed. sheet a 1 and sheet a3 majer na | |
| Nov 1, 2016 | Completed final sign-off Nov 2016 | 301 Mission St | revision to 201501296978: no exterior donor antennas to be installed maher na sheets a1, a3Details
revision to 201501296978: no exterior donor antennas to be installed maher na sheets a1, a3 | |
| Apr 12, 2016 | Never finaled issued Jul 2016, no final | 535 Mission St | verizon: garage level -install an indoor distributed antenna system. to include minor equipment associated with system.Details
verizon: garage level -install an indoor distributed antenna system. to include minor equipment associated with system. | $15,000 |
| Nov 10, 2015 | Never finaled issued Jul 2016, no final | 99 Grove St | verizon wireless internal bldg distributed antenna system consisting of 18 mrrv's & secondary power plants. no exterior or roof top changes are proposed and no antenna/cables/conduit attachments to elements which appear historical in nature.Details
verizon wireless internal bldg distributed antenna system consisting of 18 mrrv's & secondary power plants. no exterior or roof top changes are proposed and no antenna/cables/conduit attachments to elements which appear historical in nature. | $150,000 |
| Oct 8, 2015 | Expired or cancelled cancelled Dec 2016 | 333 Ofarrell St | proposal to install verizon wireless: das system, including 2 new equipment racks, 1 equipment cabinet, and 6 wall -mounted radios. all within extg head end room. no antennas are proposed. no exterior work is proposed. n/a maher.Details
proposal to install verizon wireless: das system, including 2 new equipment racks, 1 equipment cabinet, and 6 wall -mounted radios. all within extg head end room. no antennas are proposed. no exterior work is proposed. n/a maher. | $20,000 |
| Apr 29, 2015 | Completed final sign-off Oct 2016 | 575 Market St | installation for the co-location of verizon equip to an (e) indoor distributed system (idas) consists of: dc power plant & baheris an (3) (e) racks & radio equip on (e) rack; 1 gps antenna module on (e) pipe & assoc communication & utilities wiring as req'dDetails
installation for the co-location of verizon equip to an (e) indoor distributed system (idas) consists of: dc power plant & baheris an (3) (e) racks & radio equip on (e) rack; 1 gps antenna module on (e) pipe & assoc communication & utilities wiring as req'd | $30,000 |
| Jan 29, 2015 | Completed final sign-off Nov 2016 | 301 Mission St | proposed installlation is for the colocation of verizon wireless equipment onto an extg indoor distributed antenna system (idas) consisting of radio equipment mounted to 2 extg rocks,dc power plant and radio equip. on extg extg rock, one antena mounting pipe for 1 gps antenna and 1 donor antennaDetails
proposed installlation is for the colocation of verizon wireless equipment onto an extg indoor distributed antenna system (idas) consisting of radio equipment mounted to 2 extg rocks,dc power plant and radio equip. on extg extg rock, one antena mounting pipe for 1 gps antenna and 1 donor antenna | $30,000 |
| Dec 18, 2014 | Completed final sign-off Nov 2016 | 1355 Market St | installation for the colocation of verision wireless equipment onto (e) indoor distributed antenna system consisting 1 gps antenna, 1 donor antenna mounted to a new mounting pipe and radio equipments mounted to 2 existing racks, associated communications and utilities wiring as required. maher n/a.Details
installation for the colocation of verision wireless equipment onto (e) indoor distributed antenna system consisting 1 gps antenna, 1 donor antenna mounted to a new mounting pipe and radio equipments mounted to 2 existing racks, associated communications and utilities wiring as required. maher n/a. | $30,000 |
| Oct 2, 2014 | Completed final sign-off Nov 2016 | 50 Fremont St | idas uses exterior antenna to serve indoor das system proposed installation consists of: one(1) dc power plant, radio equipments mounted to two(2) existing racks, one(1) gps antenna and one(1)donor antenna mounted to a new mounting pipe (comply with maher ordinance extended no.155-13 not required)Details
idas uses exterior antenna to serve indoor das system proposed installation consists of: one(1) dc power plant, radio equipments mounted to two(2) existing racks, one(1) gps antenna and one(1)donor antenna mounted to a new mounting pipe (comply with maher ordinance extended no.155-13 not required) | $30,000 |
| Oct 2, 2014 | Completed final sign-off Apr 2016 | 101 California St | idas uses exterior antenna to serve an indoor das system. proposed installation consists of: one(1)dc power plant, radio equipments mounted to two(2)existing racks, one(1)gps antenna and one(1)donor antenna mounted to a new mounting pipe (comply with maher ordinance extended ordinance no.155-13 notDetails
idas uses exterior antenna to serve an indoor das system. proposed installation consists of: one(1)dc power plant, radio equipments mounted to two(2)existing racks, one(1)gps antenna and one(1)donor antenna mounted to a new mounting pipe (comply with maher ordinance extended ordinance no.155-13 not | $30,000 |
| Sep 30, 2014 | Completed final sign-off Nov 2016 | 680 Folsom St | installation of head end radio equipment within existing building to connect to idas systemDetails
installation of head end radio equipment within existing building to connect to idas system | $30,000 |
| Sep 26, 2014 | Completed final sign-off Apr 2016 | 345 Stockton St | installation of verizon indoor distributed antenna (idas) system. install 1 radio rack in (e) communication room (20" x 15" x 60"). install 1 dc power plant. install 1 ad-pa-1921-18-20 hfb antenna. install 1 gps antenna.Details
installation of verizon indoor distributed antenna (idas) system. install 1 radio rack in (e) communication room (20" x 15" x 60"). install 1 dc power plant. install 1 ad-pa-1921-18-20 hfb antenna. install 1 gps antenna. | $35,000 |
| Jul 9, 2014 | Completed final sign-off Dec 2014 | 747 Howard St | for sprint: removing (9) (e) racks & cabinets and installing (5) cabinets & (3) racks with (6) rrh units, using (2) (e) 100a breakers to power (n) bts cabinets. n/a ordinance #155-13.Details
for sprint: removing (9) (e) racks & cabinets and installing (5) cabinets & (3) racks with (6) rrh units, using (2) (e) 100a breakers to power (n) bts cabinets. n/a ordinance #155-13. | $20,000 |
| Aug 16, 2013 | Completed final sign-off Apr 2014 | 1 Embarcadero Center | install new in building das system (unmanned telecommuncitions) equipment in parking structure with cable runs in existing runs, antennas on each floor.Details
install new in building das system (unmanned telecommuncitions) equipment in parking structure with cable runs in existing runs, antennas on each floor. | $250,000 |
| Aug 16, 2013 | Completed final sign-off Apr 2014 | 2 Embarcadero Center | install new in building das system (unmanned telecommuncitions) equipment in parking level with cable runs in existing runs, antennas on each floor.Details
install new in building das system (unmanned telecommuncitions) equipment in parking level with cable runs in existing runs, antennas on each floor. | $250,000 |
| Jun 25, 2013 | Never finaled issued Jul 2013, no final | 525 Market St | intallation of telecom equipment at the mezzanine level of existing buildingDetails
intallation of telecom equipment at the mezzanine level of existing building | $45,000 |
| Apr 8, 2013 | Completed final sign-off May 2014 | 3 Embarcadero Center | install new das system inside bldg.Details
install new das system inside bldg. | $400,000 |
| Apr 8, 2013 | Completed final sign-off May 2014 | 4 Embarcadero Center | install new das system inside bldg.Details
install new das system inside bldg. | $300,000 |
| Nov 15, 2011 | Never finaled issued Mar 2012, no final | 301 Mission St | common area installation of antenna portion of att indoor das: 352 micro antennas, 70 fiber bdasDetails
common area installation of antenna portion of att indoor das: 352 micro antennas, 70 fiber bdas | $10,000 |
| Jun 29, 2011 | Never finaled issued Mar 2012, no final | 301 Mission St | for common area. intsallation of new indoor at&t telecomunications das equipment: 2 rbs cabinets, one 23" rack with a dc power system, four 19" racks, six rrv's, one 23" battery rack, and one 3206 rbs cabinet.Details
for common area. intsallation of new indoor at&t telecomunications das equipment: 2 rbs cabinets, one 23" rack with a dc power system, four 19" racks, six rrv's, one 23" battery rack, and one 3206 rbs cabinet. | $15,000 |