Communication Component Systems Inc
- Based in
- South Hackensack
- On San Francisco permits
- Feb 2016 to Feb 2016
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 24, 2016 | Completed final sign-off Apr 2022 | 555 De Haro St | att - modification to att facility to include: installing 3new rrus 7 1 new dus41 in an (e) cabinet. maher naDetails
att - modification to att facility to include: installing 3new rrus 7 1 new dus41 in an (e) cabinet. maher na | $12,000 |
| Feb 23, 2016 | Completed final sign-off Dec 2016 | 650 04th St | att:modify (e) facility. install: 3 new rrus-11@ equip,6(n) 7/8" coax routed inside 3(n) conduits to roof then in (e) cable tray, 3rd dus41 inside (e) purcell, 2(n) outdoor dc12 surge suppressor on (n) frame in (e) equip rm, 3(n) dc power trunks w/i (n) conduit to roof then in (e) cable tray mahernaDetails
att:modify (e) facility. install: 3 new rrus-11@ equip,6(n) 7/8" coax routed inside 3(n) conduits to roof then in (e) cable tray, 3rd dus41 inside (e) purcell, 2(n) outdoor dc12 surge suppressor on (n) frame in (e) equip rm, 3(n) dc power trunks w/i (n) conduit to roof then in (e) cable tray maherna | $12,000 |