Permit GraphShortlistSan Francisco building permits since 2000

Comfort International Inc

Contractor license
759534
State license record
Based in
San Jose
On San Francisco permits
Dec 2025 to Dec 2025
Last 24 months
1 permit filed

1 permit since 2000: 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Dec 10, 2025Expired or cancelled
withdrawn Mar 2026
171 02nd Stdemolish existing old boiler. disconnect pipes, power and gas. install new boiler (model# rbi dw600, sn# 052599780, 475 lbs) same capacity, same size, and reconnect pipes, power and gas.
Details
Permit
202512101436
Status
withdrawn
Filed
Dec 10, 2025
Declared cost
$23,000
Address
171 02nd St

demolish existing old boiler. disconnect pipes, power and gas. install new boiler (model# rbi dw600, sn# 052599780, 475 lbs) same capacity, same size, and reconnect pipes, power and gas.

Open the permit page

$23,000