Colorado Structures Inc Dba Csi Construc
- Based in
- Irvine
- On San Francisco permits
- Jun 2010 to Jun 2017
- Last 24 months
- 0 permits filed
12 permits since 2000: 10 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 14, 2017 | Completed final sign-off Oct 2017 | 135 04th St | revision to bring restroom stall to ada compliance. revision to app#201603182469,201609289064, & 201702169600Details
revision to bring restroom stall to ada compliance. revision to app#201603182469,201609289064, & 201702169600 | |
| Feb 16, 2017 | Completed final sign-off Oct 2017 | 135 04th St | revision to pa 2016-0928-6064 and pa 2016-0318-2469 - reduce the width of the won doors and adjust the corresponding bulkhead and electrical. this change also required to adjest the freestyle (soda) area by shifting it all to the eastDetails
revision to pa 2016-0928-6064 and pa 2016-0318-2469 - reduce the width of the won doors and adjust the corresponding bulkhead and electrical. this change also required to adjest the freestyle (soda) area by shifting it all to the east | |
| Sep 28, 2016 | Completed final sign-off Oct 2017 | 135 04th St | 3rd floor. revision to permit 2016-0318-2469 revised lighting, lobby, restrooms, miscDetails
3rd floor. revision to permit 2016-0318-2469 revised lighting, lobby, restrooms, misc | |
| Mar 18, 2016 | Completed final sign-off Oct 2017 | 135 04th St | #3000- interior t.i. of existing theatre including new lighting, tiles, carpet, new seating.Details
#3000- interior t.i. of existing theatre including new lighting, tiles, carpet, new seating. | $5,180,000 |
| Dec 13, 2013 | Completed final sign-off May 2014 | 491 Bay Shore Bl | replacement of (e) sliding gate w/ overhead trolly gate at loading dock parking (non-accessible from public).Details
replacement of (e) sliding gate w/ overhead trolly gate at loading dock parking (non-accessible from public). | $175,000 |
| Jul 1, 2011 | Completed final sign-off Sep 2011 | 5900 03rd St | #c-2001: ammendment to appn. 201010052302 and 201106289109; from 5800 to 5900 suite c-2001 (address correction)Details
#c-2001: ammendment to appn. 201010052302 and 201106289109; from 5800 to 5900 suite c-2001 (address correction) | |
| Jun 28, 2011 | Completed final sign-off Oct 2011 | 5800 03rd St | revision to pa #201010052302 include electrical, plumbing & mechnqaical systems, deleted produce cooler & washroom, added bakery room (minor) adjusted shelving & revised refrigerated cases to have doors relocated ice cabinet.Details
revision to pa #201010052302 include electrical, plumbing & mechnqaical systems, deleted produce cooler & washroom, added bakery room (minor) adjusted shelving & revised refrigerated cases to have doors relocated ice cabinet. | $25,000 |
| Jun 20, 2011 | Expired or cancelled expired May 2017 | 375 32nd Av | revision to appl #201006164681: stall new handrails at ramp & along drive, add truncated domes to existing ramps.Details
revision to appl #201006164681: stall new handrails at ramp & along drive, add truncated domes to existing ramps. | $4,000 |
| Oct 5, 2010 | Completed final sign-off Sep 2011 | 5800 03rd St | t.i. for existing building. shell on 1st floor with minor slab demolition.Details
t.i. for existing building. shell on 1st floor with minor slab demolition. | $600,000 |
| Sep 28, 2010 | Never finaled issued Sep 2010, no final | 3132 Clement St | interior soft demolition alteration including wall and flooring removal to create shell space for future tenant improvementDetails
interior soft demolition alteration including wall and flooring removal to create shell space for future tenant improvement | $40,000 |
| Aug 12, 2010 | Completed final sign-off Jun 2011 | 3132 Clement St | convert shell building space to fresh & easy market. interior work to include plumbing, electrical, mechanical & minor structural.Details
convert shell building space to fresh & easy market. interior work to include plumbing, electrical, mechanical & minor structural. | $750,000 |
| Jun 16, 2010 | Completed final sign-off Jun 2011 | 3132 Clement St | tenant improvement remodel to include (n) demising wall, gas water & sewer service & minor site work to include re-striping & slurry of parking lot & minor landscape. soft-shell remodel only. interior spaces for fresh & easy etc under separate permit.Details
tenant improvement remodel to include (n) demising wall, gas water & sewer service & minor site work to include re-striping & slurry of parking lot & minor landscape. soft-shell remodel only. interior spaces for fresh & easy etc under separate permit. | $150,000 |