Cogent Construction & Consulting Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2010 to Aug 2025
- Last 24 months
- 4 permits filed
54 permits since 2000: 45 completed, 2 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2025 | Expired or cancelled withdrawn Sep 2025 | 1504 Bryant St | alteration to pa #2021-0820-6871: slight modification to one wall at mech room; add/change walls at hall, add 3 doors at hall wall & windows. lighting layout changed, less lighting installed, add fire extinguishers & emergency exit lights. revise (e) bath slightly to meet ada.Details
alteration to pa #2021-0820-6871: slight modification to one wall at mech room; add/change walls at hall, add 3 doors at hall wall & windows. lighting layout changed, less lighting installed, add fire extinguishers & emergency exit lights. revise (e) bath slightly to meet ada. | $25,000 |
| Aug 13, 2025 | In progress issued Aug 2025 | 1785 Alabama St | remodel bathroom.Details
remodel bathroom. | $10,000 |
| Nov 8, 2024 | Completed final sign-off May 2025 | 2178 28th Av | remodel kitchen and bathroom on 2nd fl, upgrade electrical entire house replace furnanceDetails
remodel kitchen and bathroom on 2nd fl, upgrade electrical entire house replace furnance | $50,000 |
| Oct 28, 2024 | Completed final sign-off Jun 2025 | 1547 24th Av | remodel kitchen and master bathroom on 2nd floor in kind. no change to wall layout. no change to floor layout. no structural work.Details
remodel kitchen and master bathroom on 2nd floor in kind. no change to wall layout. no change to floor layout. no structural work. | $20,000 |
| Feb 28, 2024 | Completed final sign-off Apr 2024 | 1257 Folsom St | abe ada business entrance, abe# 202001020557, install the power push button & make interior door, landing to match the (e) sidewalk.Details
abe ada business entrance, abe# 202001020557, install the power push button & make interior door, landing to match the (e) sidewalk. | $2,000 |
| Jan 12, 2024 | In progress issued Jan 2024 | 2944 Anza St | repair back stair as needed 50% or less. to comply with complaint 202315911 #5Details
repair back stair as needed 50% or less. to comply with complaint 202315911 #5 | $5,000 |
| Jan 12, 2024 | Completed final sign-off Feb 2024 | 1470 38th Av | renew for final 201907196378. all work is complete.Details
renew for final 201907196378. all work is complete. | |
| Apr 25, 2023 | Completed final sign-off May 2023 | 1824 Santiago St | replace and repair stucco at front door - approx 20 sq ft.Details
replace and repair stucco at front door - approx 20 sq ft. | $1,500 |
| Mar 22, 2023 | Expired or cancelled cancelled Jan 2026 | 1504 Bryant St | extend (e) stairs & stair cores to roof for maintenance access, add (3)new exterior windows, repair (e) entry awning. no change of useDetails
extend (e) stairs & stair cores to roof for maintenance access, add (3)new exterior windows, repair (e) entry awning. no change of use | $55,000 |
| Nov 23, 2022 | Never finaled issued Jan 2023, no final | 1504 Bryant St | interior work only, renovation of extg ground level lobby. addition of mezzanine at 3rd floor.Details
interior work only, renovation of extg ground level lobby. addition of mezzanine at 3rd floor. | $85,000 |
| Aug 24, 2022 | Expired or cancelled cancelled Jan 2026 | 1352 09th Av | to comply with accessible business entrance program per ordinance 51-16 - abe#201902135176. duplicate application/plans, originals lostDetails
to comply with accessible business entrance program per ordinance 51-16 - abe#201902135176. duplicate application/plans, originals lost | $5,000 |
| Aug 20, 2021 | Completed final sign-off Sep 2025 | 1504 Bryant St | add storage rooms, renovate extg bath to ada bath, change out/add light fixtures with switches and outlets in storage rooms, ada bath and vacant tenant area.Details
add storage rooms, renovate extg bath to ada bath, change out/add light fixtures with switches and outlets in storage rooms, ada bath and vacant tenant area. | $20,000 |
| May 19, 2021 | Completed final sign-off Sep 2022 | 791 34th Av | remodel one bathroom on 1st floor. replace new tub, sink , and toilet. non structural.Details
remodel one bathroom on 1st floor. replace new tub, sink , and toilet. non structural. | $7,500 |
| Dec 21, 2020 | Completed final sign-off May 2021 | 228 22nd Av | remodel bathroom on 1st floor in kind.Details
remodel bathroom on 1st floor in kind. | $10,000 |
| Jul 10, 2020 | Never finaled issued Jul 2020, no final | 357 Marina Bl | voluntary seismic retrofit at ground floor per ab-094 in accordance w/ 2019 cebcappendix a4Details
voluntary seismic retrofit at ground floor per ab-094 in accordance w/ 2019 cebcappendix a4 | $35,000 |
| Dec 18, 2019 | Completed final sign-off Mar 2020 | 443 Lakeshore Dr | comply w/ complaint 201987491. demo of illegal structure in backyard. no bathroom or illegal unit.Details
comply w/ complaint 201987491. demo of illegal structure in backyard. no bathroom or illegal unit. | $1,500 |
| Aug 23, 2019 | Completed final sign-off Oct 2020 | 1130 Folsom St | interior improvements with in a suite non bearing walls, accessible restroom, 4 dental treatment rooms, supporting roomd, hvac, plm, ele work from (e) ele panelDetails
interior improvements with in a suite non bearing walls, accessible restroom, 4 dental treatment rooms, supporting roomd, hvac, plm, ele work from (e) ele panel | $251,550 |
| Feb 5, 2019 | Completed final sign-off Mar 2019 | 3251 20th Av | revision to pa 2018-0904-9054 - relocate fan for hood (mechanical)Details
revision to pa 2018-0904-9054 - relocate fan for hood (mechanical) | |
| Oct 23, 2018 | Completed final sign-off Mar 2019 | 3251 20th Av | demo of (e) restaurant space. ti under separate permit #2018-0904-9054. ab-017.Details
demo of (e) restaurant space. ti under separate permit #2018-0904-9054. ab-017. | $35,000 |
| Sep 24, 2018 | Completed final sign-off Dec 2018 | 3251 20th Av | rev to pa# 201807033679 for tea station within shopping center (kiosk #5523) reconfiguration equipment layout floor planDetails
rev to pa# 201807033679 for tea station within shopping center (kiosk #5523) reconfiguration equipment layout floor plan | |
| Sep 10, 2018 | Completed final sign-off Oct 2018 | 2146 34th Av | ref 201808288583. remove stucco more than 50% due to dry rot repair.Details
ref 201808288583. remove stucco more than 50% due to dry rot repair. | $20,000 |
| Sep 4, 2018 | Completed final sign-off Mar 2019 | 3251 20th Av | space 172 interior ti work includes kitchen reconfigureation, new service counter, grease eshaust and makeup airDetails
space 172 interior ti work includes kitchen reconfigureation, new service counter, grease eshaust and makeup air | $350,000 |
| Aug 28, 2018 | Completed final sign-off Oct 2018 | 2146 34th Av | repair cracked stucco in front of building. approx. 250 sqft. no window changes. less that 50% of front and side. in-kind application of stucco.Details
repair cracked stucco in front of building. approx. 250 sqft. no window changes. less that 50% of front and side. in-kind application of stucco. | $5,000 |
| Jul 3, 2018 | Completed final sign-off Dec 2018 | 3251 20th Av | commercial t.i. proposed new tea station within shopping center (kisk #5523)Details
commercial t.i. proposed new tea station within shopping center (kisk #5523) | $5,000 |
| Jun 11, 2018 | Completed final sign-off Jul 2018 | 1547 24th Av | replace siding at rear building approx 500 sq ft, replace 2 windows & 2 patio doors in-kind, u-factor = 0.32 maxDetails
replace siding at rear building approx 500 sq ft, replace 2 windows & 2 patio doors in-kind, u-factor = 0.32 max | $13,000 |
| Jan 11, 2018 | Never finaled issued Jan 2018, no final | 228 22nd Av | 2nd fl: new bathroom and sink.Details
2nd fl: new bathroom and sink. | $12,000 |
| Dec 4, 2017 | Completed final sign-off Jan 2018 | 33 Putnam St | replace rear side of building sidingand new (5) windows at rear side, insulation also. no visible from street, no change of (e) layout.Details
replace rear side of building sidingand new (5) windows at rear side, insulation also. no visible from street, no change of (e) layout. | $15,000 |
| Jan 12, 2017 | Completed final sign-off Jun 2017 | 1810 Hyde St | work is only at unit 1810 & 1812 - kitchen & bathrooms remodel in kind; update elctrical for both units. n/a maher ord. 155-13Details
work is only at unit 1810 & 1812 - kitchen & bathrooms remodel in kind; update elctrical for both units. n/a maher ord. 155-13 | $40,000 |
| Nov 4, 2016 | Completed final sign-off Mar 2017 | 167 Beverly St | add two bedrooms, one full bath, relocate washer & dryer at first floor per plan.Details
add two bedrooms, one full bath, relocate washer & dryer at first floor per plan. | $39,600 |
| Sep 12, 2016 | Completed final sign-off Nov 2016 | 3251 20th Av | #239- revision to pa#201608094558, replacing existing water source & heap pump.Details
#239- revision to pa#201608094558, replacing existing water source & heap pump. | $50,000 |
| Aug 9, 2016 | Completed final sign-off Nov 2016 | 3251 20th Av | #239: tenant improvement to an existing retail.scope includes new ceiling,lighting,display cases.existing accessible restroom,storefront to remain. new water source heat pump.Details
#239: tenant improvement to an existing retail.scope includes new ceiling,lighting,display cases.existing accessible restroom,storefront to remain. new water source heat pump. | $50,000 |
| Jul 12, 2016 | Completed final sign-off Jul 2018 | 1547 24th Av | replacement of (e) deck. gravity wall less than 3 ftDetails
replacement of (e) deck. gravity wall less than 3 ft | $9,999 |
| Apr 5, 2016 | Completed final sign-off Jun 2018 | 582 Naples St | to comply with nov 201580512: to legalize unit at garage level.Details
to comply with nov 201580512: to legalize unit at garage level. | $20,000 |
| Feb 12, 2016 | Completed final sign-off Aug 2016 | 1735 Polk St | add gas meter room plans to existing approved/open permit. revised to pa#201402138488 & 201502057640 n/a ordinance #155-13Details
add gas meter room plans to existing approved/open permit. revised to pa#201402138488 & 201502057640 n/a ordinance #155-13 | $35,000 |
| Oct 16, 2015 | Completed final sign-off Aug 2016 | 1735 Polk St | revised entry and dining layout, including (n) ada lift and minor changes to equipment layout at bar and service area. ref to pa# 201402138488 and 201502057640. mep to be submitted under sep permit. n/a maher ord. 155-13Details
revised entry and dining layout, including (n) ada lift and minor changes to equipment layout at bar and service area. ref to pa# 201402138488 and 201502057640. mep to be submitted under sep permit. n/a maher ord. 155-13 | |
| Oct 8, 2015 | Completed final sign-off Mar 2016 | 115 Lawton St | aluminum-clad wood casement windows on front facade and other material windows on non-visible facades on 2nd floor in-kind same size and location. total 9 windows with u-factor not to exceed 0.32. remove and replace sheet rock and insulation at living room 200 sf 5/8" type x gyp. bd at property lineDetails
aluminum-clad wood casement windows on front facade and other material windows on non-visible facades on 2nd floor in-kind same size and location. total 9 windows with u-factor not to exceed 0.32. remove and replace sheet rock and insulation at living room 200 sf 5/8" type x gyp. bd at property line | $3,500 |
| Sep 21, 2015 | Completed final sign-off Oct 2016 | 2527 33rd Av | remodel projects, including legalization of an (e) ground floor room; a new ground floor bath & closet; a new exit through the garage; remodel of a kitchen and bathroom at 2nd floorDetails
remodel projects, including legalization of an (e) ground floor room; a new ground floor bath & closet; a new exit through the garage; remodel of a kitchen and bathroom at 2nd floor | $70,000 |
| Sep 3, 2015 | Completed final sign-off Sep 2015 | 2234 27th Av | revision to pa# 201506290153. work perform on 2nd floor, not 1st floor.Details
revision to pa# 201506290153. work perform on 2nd floor, not 1st floor. | |
| Sep 3, 2015 | Completed final sign-off Mar 2016 | 115 Lawton St | convert (e) portion of garage to: 1 family room, 1 bedroom and 1 bathroom. replace 2 windows at rear and install (1) new window. 2nd flr: remodel kitchen & bathroom in kind. update elect & plumb per code.Details
convert (e) portion of garage to: 1 family room, 1 bedroom and 1 bathroom. replace 2 windows at rear and install (1) new window. 2nd flr: remodel kitchen & bathroom in kind. update elect & plumb per code. | $60,000 |
| Aug 26, 2015 | Completed final sign-off Nov 2015 | 5666 Mission St | renovate existing restroom to be ada compliant, relocate restroom sink, expanding 2x4 stud wall, add new door to office & new restroom door.Details
renovate existing restroom to be ada compliant, relocate restroom sink, expanding 2x4 stud wall, add new door to office & new restroom door. | $12,000 |
| Jul 28, 2015 | Never finaled issued Jul 2015, no final | 1729 Polk St | revision to pa #2014.0402.2271 - adding structural post & related structural work for ground floor entrance to 1733 polk st. n/a maher ordinanceDetails
revision to pa #2014.0402.2271 - adding structural post & related structural work for ground floor entrance to 1733 polk st. n/a maher ordinance | $10,000 |
| Jun 29, 2015 | Completed final sign-off Sep 2015 | 2234 27th Av | remodel (e) bathroom on 1st floor. electrical and plumbing upgrade.Details
remodel (e) bathroom on 1st floor. electrical and plumbing upgrade. | |
| Feb 5, 2015 | Completed final sign-off Aug 2016 | 1735 Polk St | revised kitchen layout and equipment for restaurant ti of e gr fl tenant space. mech, elec, plumbing to be submitted sep permit. revision to previously approved permit #201402138488. n/a maher ord 155-13Details
revised kitchen layout and equipment for restaurant ti of e gr fl tenant space. mech, elec, plumbing to be submitted sep permit. revision to previously approved permit #201402138488. n/a maher ord 155-13 | |
| Jan 20, 2015 | Completed final sign-off Aug 2016 | 1735 Polk St | this is part of approved building permit 201402138488; mechanical work only; (remodel existing retail space on 1st flr to restaurant space, approved for restaurant space). maher n/aDetails
this is part of approved building permit 201402138488; mechanical work only; (remodel existing retail space on 1st flr to restaurant space, approved for restaurant space). maher n/a | $175,000 |
| Jul 3, 2014 | Completed final sign-off Sep 2014 | 357 Marina Bl | replace siding on rear of house sosuth and souteast side portion insulation. six windows not visible from street in-kind. 0.7 max factor.Details
replace siding on rear of house sosuth and souteast side portion insulation. six windows not visible from street in-kind. 0.7 max factor. | $30,000 |
| May 31, 2013 | Completed final sign-off Aug 2013 | 128 Lisbon St | repair due to fire damage at back part of building per building inspection and correction notice dated 3-21-13. remodel kitchen and bath. all repair in kind. update electric and plumbingDetails
repair due to fire damage at back part of building per building inspection and correction notice dated 3-21-13. remodel kitchen and bath. all repair in kind. update electric and plumbing | $35,000 |
| Apr 9, 2013 | Completed final sign-off Jun 2013 | 30 Cabrillo St | remodel kitchen, update electrical. no wall demo - #30.Details
remodel kitchen, update electrical. no wall demo - #30. | $8,000 |
| Mar 20, 2013 | Completed final sign-off May 2013 | 126 Lisbon St | remodel 1 kitchen in kind & laundry room. update electrical & plumbingDetails
remodel 1 kitchen in kind & laundry room. update electrical & plumbing | $11,000 |
| Oct 15, 2012 | Completed final sign-off Dec 2012 | 1547 24th Av | replace and repair front siding in kindDetails
replace and repair front siding in kind | $3,000 |
| Sep 20, 2012 | Completed final sign-off Jan 2013 | 1667 33rd Av | remodel (e) bathroom. update electrical and plumbing. replace all fixtures. no change on walls.Details
remodel (e) bathroom. update electrical and plumbing. replace all fixtures. no change on walls. | $6,500 |
| Aug 29, 2011 | Completed final sign-off Sep 2011 | 691 Ulloa St | repair dry rot on exterior deck less than 50%Details
repair dry rot on exterior deck less than 50% | $3,000 |
| Aug 11, 2011 | Completed final sign-off Sep 2011 | 435 09th Av | replace 4 back windows on unit #6 in kind, no rough opening change, max u factor .4Details
replace 4 back windows on unit #6 in kind, no rough opening change, max u factor .4 | $6,000 |
| Dec 1, 2010 | Completed final sign-off Jan 2011 | 435 09th Av | unit #1: replace three front windows and one window at back room in-kind, no rough opening changes. max. u-factor 0.40Details
unit #1: replace three front windows and one window at back room in-kind, no rough opening changes. max. u-factor 0.40 | $8,000 |
| Sep 16, 2010 | Completed final sign-off Feb 2011 | 1782 39th Av | repl south side of siding & repl 3 existing windows to comply with nov 200455883 and complaint #200667642Details
repl south side of siding & repl 3 existing windows to comply with nov 200455883 and complaint #200667642 | $7,500 |