Cobe Construction Inc
- Based in
- Campbell
- On San Francisco permits
- May 2012 to Nov 2025
- Last 24 months
- 3 permits filed
21 permits since 2000: 17 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 25, 2025 | Completed final sign-off Dec 2025 | 222 02nd St | 14th fl/ installation of ner unistrut grid suspended from the existing floor structure above. this project does not propose any chnages to size, use or occupancy of existing spaces, therefore, the egress is not affected by the installation of new equipment.Details
14th fl/ installation of ner unistrut grid suspended from the existing floor structure above. this project does not propose any chnages to size, use or occupancy of existing spaces, therefore, the egress is not affected by the installation of new equipment. | $7,000 |
| Sep 26, 2025 | Completed final sign-off Dec 2025 | 215 Fremont St | 2nd, 3rd and 4th fl. install new bevi water dispensers at (e) break rooms. scope of work includes minor plumbing and casework modifications.Details
2nd, 3rd and 4th fl. install new bevi water dispensers at (e) break rooms. scope of work includes minor plumbing and casework modifications. | $28,526 |
| Sep 26, 2025 | Completed final sign-off Dec 2025 | 121 Spear St | floors 2, 5, 6 offices: install new bevi water dispensing unit at existing breakroom, including minor plumbing and case work modification.Details
floors 2, 5, 6 offices: install new bevi water dispensing unit at existing breakroom, including minor plumbing and case work modification. | $28,526 |
| May 19, 2023 | Completed final sign-off Jul 2023 | 155 05th St | minor revision to pa #2022-0621-6664 to adjust mounting for four microscopes. revised structural drawingsDetails
minor revision to pa #2022-0621-6664 to adjust mounting for four microscopes. revised structural drawings | $4,000 |
| Jun 21, 2022 | Completed final sign-off Jul 2023 | 155 05th St | 2nd flr: installation of new microscopes and monitors on ceiling.Details
2nd flr: installation of new microscopes and monitors on ceiling. | $10,000 |
| Oct 5, 2020 | Never finaled filed Oct 2020, never issued | 3401 California St | deferred mep for pa# 202003106643Details
deferred mep for pa# 202003106643 | $90,000 |
| Sep 27, 2018 | Completed final sign-off Oct 2018 | 49 Stevenson St | 14th fl - revision to pa 2018-0504-8181, ti only architectural omitting (1) card reader from scopeDetails
14th fl - revision to pa 2018-0504-8181, ti only architectural omitting (1) card reader from scope | |
| Sep 26, 2018 | Completed final sign-off Oct 2018 | 49 Stevenson St | electrical t.i. work for architectural t.i., appl # 2018/05/04/8181Details
electrical t.i. work for architectural t.i., appl # 2018/05/04/8181 | |
| Aug 16, 2018 | Completed final sign-off Oct 2018 | 49 Stevenson St | revisionto 201805048181 pre bld inspectors request - to file this upgrade keep (e) water closets in place and use the new proposed all gender restroom as equalivent facilitation solutionDetails
revisionto 201805048181 pre bld inspectors request - to file this upgrade keep (e) water closets in place and use the new proposed all gender restroom as equalivent facilitation solution | |
| Jul 5, 2018 | Completed final sign-off Oct 2018 | 49 Stevenson St | deferred mechanical plans being submitted for ti office build out. ref pa 2018-0504-8181. installing new low side ductworkand hvac equipment from exsisting vavs. intall new exhaust fan serving the it rack. install new vav box and ductwork. not oshpod 3.Details
deferred mechanical plans being submitted for ti office build out. ref pa 2018-0504-8181. installing new low side ductworkand hvac equipment from exsisting vavs. intall new exhaust fan serving the it rack. install new vav box and ductwork. not oshpod 3. | $80,000 |
| May 4, 2018 | Completed final sign-off Oct 2018 | 49 Stevenson St | tenant improvement only architectural, full floor. partitions, restrooms, new ceilings, finishes. new casework, mep and fire under deferred permit(s). new rated elevator lobby doors, card readersDetails
tenant improvement only architectural, full floor. partitions, restrooms, new ceilings, finishes. new casework, mep and fire under deferred permit(s). new rated elevator lobby doors, card readers | $550,000 |
| Mar 8, 2018 | Completed final sign-off Oct 2018 | 49 Stevenson St | 14/f: interior only, non-structural/building core. demolition work. interior wall partitions. iinterior n-rated door. . interior restrooms & fixtures.. all non-structural elements & core. per-ab-017 !!!!! ceiling demo not permitted!!!!!!Details
14/f: interior only, non-structural/building core. demolition work. interior wall partitions. iinterior n-rated door. . interior restrooms & fixtures.. all non-structural elements & core. per-ab-017 !!!!! ceiling demo not permitted!!!!!! | $10,000 |
| Nov 13, 2017 | Completed final sign-off Sep 2019 | 409 Illinois St | portable clean room, lyo unit & new door. freeze dryer.Details
portable clean room, lyo unit & new door. freeze dryer. | $400,000 |
| Jan 28, 2015 | Expired or cancelled cancelled Jan 2026 | 345 West Portal Av | revision to appl #2014.1124.2317: revise glass door & as built plumbing.Details
revision to appl #2014.1124.2317: revise glass door & as built plumbing. | $20,000 |
| Nov 24, 2014 | Completed final sign-off Feb 2015 | 345 West Portal Av | #200- minor remodel of (e) orthodontic office includes electrical, plumbing, suspended ceiling, drywall, doors and finishes.Details
#200- minor remodel of (e) orthodontic office includes electrical, plumbing, suspended ceiling, drywall, doors and finishes. | $20,000 |
| Nov 13, 2014 | Never finaled issued Nov 2014, no final | 3400 California St | suite 200: install new electrical outlets and lighting for ti new medical grade receptacles at all patient care areas. modify e plumbing for new sinks, faucets, lavs, toilets. provide new air,vac, natural gas for dental equip. ref 201410280145Details
suite 200: install new electrical outlets and lighting for ti new medical grade receptacles at all patient care areas. modify e plumbing for new sinks, faucets, lavs, toilets. provide new air,vac, natural gas for dental equip. ref 201410280145 | $60,000 |
| Oct 28, 2014 | Completed final sign-off Apr 2015 | 3400 California St | 2nd floor t.i. for dental office. new walls, ceilings, flooring, finishes and structural work. plum, mep & elec under separate permit. ref. demo permit #2014.0515.5828.Details
2nd floor t.i. for dental office. new walls, ceilings, flooring, finishes and structural work. plum, mep & elec under separate permit. ref. demo permit #2014.0515.5828. | $100,000 |
| May 15, 2014 | Never finaled issued May 2014, no final | 3400 California St | 2nd floor interior demo - remove non-bearing partitions, ceiling grid, interior finishes per ab-017.Details
2nd floor interior demo - remove non-bearing partitions, ceiling grid, interior finishes per ab-017. | $10,000 |
| Oct 23, 2012 | Completed final sign-off Jul 2013 | 595 Buckingham Wy | #532- revision to appl #2012.0524.1215: specifically more detail to piping diagrams on page p-1 per inspector.Details
#532- revision to appl #2012.0524.1215: specifically more detail to piping diagrams on page p-1 per inspector. | |
| Sep 18, 2012 | Completed final sign-off Jul 2013 | 595 Buckingham Wy | ste # 532: new dental office ti. new ducting to operatories, office, waiting at e points of connection from building systemDetails
ste # 532: new dental office ti. new ducting to operatories, office, waiting at e points of connection from building system | $34,000 |
| May 24, 2012 | Completed final sign-off Jul 2013 | 595 Buckingham Wy | 5th floor - all new partitions, doors, hardware, lighting and plumbing fixtures, casework and finishes flooring for a new dental offices.Details
5th floor - all new partitions, doors, hardware, lighting and plumbing fixtures, casework and finishes flooring for a new dental offices. | $300,000 |