Coastal Tile & Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2017 to Aug 2024
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2024 | Completed final sign-off Jan 2025 | 201 Harrison St | unit #300: in kind kitchen remodel: replace countertops, dishwasher, sink. in kind bathroom remodel. convert tub to shower, new shower fixtures.Details
unit #300: in kind kitchen remodel: replace countertops, dishwasher, sink. in kind bathroom remodel. convert tub to shower, new shower fixtures. | $40,000 |
| Jul 28, 2023 | Completed final sign-off Dec 2023 | 2412 Harrison St | in kind bathroom remodel. new plumbing and electric fixtures, new fan, new tub, new vanity.Details
in kind bathroom remodel. new plumbing and electric fixtures, new fan, new tub, new vanity. | $20,000 |
| Sep 19, 2019 | Completed final sign-off Apr 2023 | 798 Great Hy | unit 3. interior remodel of top floor unit. replace fixtures, finishes & doors at (e) master bath, kitchen & guest bath. convert (e) dining room & den into new bedrooms.Details
unit 3. interior remodel of top floor unit. replace fixtures, finishes & doors at (e) master bath, kitchen & guest bath. convert (e) dining room & den into new bedrooms. | $30,000 |
| Sep 10, 2018 | Completed final sign-off Jan 2020 | 2495 15th St | rev to 2018 0815 7437 - dry rot repair, plywood installlationDetails
rev to 2018 0815 7437 - dry rot repair, plywood installlation | $6,000 |
| Aug 15, 2018 | Completed final sign-off Jan 2020 | 2495 15th St | replace 2 sides and back of the house siding with stucco. replace deck tile in kind. work not visible from streets.Details
replace 2 sides and back of the house siding with stucco. replace deck tile in kind. work not visible from streets. | $30,000 |
| Nov 29, 2017 | Completed final sign-off Dec 2018 | 639 44th Av | interior remodel of a[artment unit at (e) bathroom. new finishes, new vanity, new mechanical, new plumbing, new electricalDetails
interior remodel of a[artment unit at (e) bathroom. new finishes, new vanity, new mechanical, new plumbing, new electrical | $2,000 |