Clayton Valley Construction, Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2006 to Apr 2014
- Last 24 months
- 0 permits filed
25 permits since 2000: 20 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 21, 2014 | Completed final sign-off Jun 2014 | 3626 Ulloa St | kitchen remodel --remove (e) cabinets & drywall, install insulation , new drywall, dabinets, counters, fixtures. to comply with cec 150(k) 8Details
kitchen remodel --remove (e) cabinets & drywall, install insulation , new drywall, dabinets, counters, fixtures. to comply with cec 150(k) 8 | $28,000 |
| Mar 27, 2014 | Completed final sign-off Jun 2014 | 3133 24th St | unit #6: enlarge existing closet, add new sliding doors, add new bedroom door to hall, non-structural work only, no new openings, no new windows; compliance with ord 155-13 not required.Details
unit #6: enlarge existing closet, add new sliding doors, add new bedroom door to hall, non-structural work only, no new openings, no new windows; compliance with ord 155-13 not required. | $5,000 |
| Feb 27, 2014 | Completed final sign-off Mar 2014 | 123 Corwin St | replace decking at rear, replace stair treads at lower level, patch holes, penetrations in garage, install r3 insulation to ducts and return air plenums. comply with cc-7301Details
replace decking at rear, replace stair treads at lower level, patch holes, penetrations in garage, install r3 insulation to ducts and return air plenums. comply with cc-7301 | $6,000 |
| Nov 7, 2013 | Expired or cancelled cancelled Jan 2026 | 42 Orben Pl | provide details for deck post footings to verified or upgrade to extg rear deck.Details
provide details for deck post footings to verified or upgrade to extg rear deck. | $1,500 |
| Oct 23, 2013 | Completed final sign-off Nov 2013 | 42 Orben Pl | condo conversion work per physcal insp #7313-install 2 layer of 5/8" drywall to exposed ceiling in breezewy, install new concrete step & handrail @rear stairs, remove window security bars, repair framing @breezway. install battery smoke alarms provided ventilation, comp w/all items for units per ltrDetails
condo conversion work per physcal insp #7313-install 2 layer of 5/8" drywall to exposed ceiling in breezewy, install new concrete step & handrail @rear stairs, remove window security bars, repair framing @breezway. install battery smoke alarms provided ventilation, comp w/all items for units per ltr | $20,000 |
| Oct 7, 2013 | Completed final sign-off Oct 2013 | 56 Webster St | rest report & repairs linguen report # 62398, repairs to rear stairs 20% of existing 14 ft, foundation raise with new pressure treated mudsill, replace(3) 6x6 support posts, with new post bases in garage,/storage repalce damaged mudsill & fraiming at right front side entrance door, replace (5) windoDetails
rest report & repairs linguen report # 62398, repairs to rear stairs 20% of existing 14 ft, foundation raise with new pressure treated mudsill, replace(3) 6x6 support posts, with new post bases in garage,/storage repalce damaged mudsill & fraiming at right front side entrance door, replace (5) windo | $7,000 |
| Aug 23, 2013 | Completed final sign-off Apr 2014 | 114 Santa Ynez Av | convert unfinished basement into 1 bedroom, 1 full bathroom, family room. add interior stairs, repair exterior stairsDetails
convert unfinished basement into 1 bedroom, 1 full bathroom, family room. add interior stairs, repair exterior stairs | $90,000 |
| Aug 19, 2013 | Completed final sign-off Oct 2013 | 2271 Bay St | dryrot repair at base of wall either side of garage door, replace damaged ballistrades at front upper level windows. install vents to underside of front window decks.Details
dryrot repair at base of wall either side of garage door, replace damaged ballistrades at front upper level windows. install vents to underside of front window decks. | $7,500 |
| May 31, 2013 | Completed final sign-off Aug 2013 | 1563 Lombard St | add 6'x9' wood porch with steps to rear of house. replace (e) window with door on 2nd floor.Details
add 6'x9' wood porch with steps to rear of house. replace (e) window with door on 2nd floor. | $1,450 |
| Apr 26, 2013 | Completed final sign-off May 2013 | 2221 Judah St | dry rot repairs to rear stairs (less than 50%), repl damaged joists below lightwell, repl emergency exit door and frame (in kind), repair door frame & sill to side stair accessDetails
dry rot repairs to rear stairs (less than 50%), repl damaged joists below lightwell, repl emergency exit door and frame (in kind), repair door frame & sill to side stair access | $5,000 |
| May 23, 2012 | Never finaled issued Jun 2012, no final | 3432 Ulloa St | remodel (e) kitchen & change (e) closet to be bathroom & cover partial patio at 2nd floor per planDetails
remodel (e) kitchen & change (e) closet to be bathroom & cover partial patio at 2nd floor per plan | $20,000 |
| Jun 7, 2011 | Completed final sign-off Sep 2011 | 3027 Clement St | dryrot repairs; replace damaged framing & mudsill, replace damaged lath & plaster with drywall, replace front door, repair siding, replace damaged interior baseboard. damaged framing at right side allyway below deck above, 320 sq.ft. (n) drywall over remaining lath, 20 ln.ft. baseboard. patch in....Details
dryrot repairs; replace damaged framing & mudsill, replace damaged lath & plaster with drywall, replace front door, repair siding, replace damaged interior baseboard. damaged framing at right side allyway below deck above, 320 sq.ft. (n) drywall over remaining lath, 20 ln.ft. baseboard. patch in.... | $3,200 |
| Jan 22, 2010 | Expired or cancelled expired Jun 2016 | 3432 Ulloa St | remodel bathroom, replace shower stall, tile, fixtures. new bathroom fan, insulation, drywall, shower door.Details
remodel bathroom, replace shower stall, tile, fixtures. new bathroom fan, insulation, drywall, shower door. | $14,000 |
| Nov 4, 2009 | Completed final sign-off Dec 2009 | 3422 Broderick St | bathroom remodel, demolish (e) interior, install new shower stall, toilet & vanity unit, new tile floor. no moving or adding wallsDetails
bathroom remodel, demolish (e) interior, install new shower stall, toilet & vanity unit, new tile floor. no moving or adding walls | $15,000 |
| Nov 4, 2009 | Completed final sign-off Nov 2009 | 2271 Bay St | to obtain final inspection for work approved under pa#200507288895. all work is complete.Details
to obtain final inspection for work approved under pa#200507288895. all work is complete. | |
| Nov 4, 2009 | Completed final sign-off Nov 2009 | 2271 Bay St | to obtain final inspection for work approved under pa#200412302371. all work is complete.Details
to obtain final inspection for work approved under pa#200412302371. all work is complete. | |
| Apr 22, 2009 | Completed final sign-off Jan 2010 | 65 Cuvier St | replace shingle roof with new 3/4" plywood, new flashings and shingles, replace kitchen cabinets and counters, new electrical and drywall, nailing: 4" on edge & 6" in field with common nailsDetails
replace shingle roof with new 3/4" plywood, new flashings and shingles, replace kitchen cabinets and counters, new electrical and drywall, nailing: 4" on edge & 6" in field with common nails | $32,600 |
| Mar 3, 2009 | Completed final sign-off Nov 2009 | 2271 Bay St | demo e kitchen and baths at 2nd flr,enlarge opening to dining room, fill in e 4x12 west light/roof court with new 48 sq ft addition, new prop line walls with 45min rated glass block (masonry) panels, kitchen and bath remodel, 1 new full bathDetails
demo e kitchen and baths at 2nd flr,enlarge opening to dining room, fill in e 4x12 west light/roof court with new 48 sq ft addition, new prop line walls with 45min rated glass block (masonry) panels, kitchen and bath remodel, 1 new full bath | $45,000 |
| May 23, 2007 | Never finaled issued Jul 2007, no final | 10 Pemberton Pl | install i beams for temporary shoring for construction of single family home next door at 1391 clayton st.Details
install i beams for temporary shoring for construction of single family home next door at 1391 clayton st. | |
| May 23, 2007 | Completed final sign-off Nov 2008 | 1391 Clayton St | temporary shoring south, north, west side of lot. separate shoring permits for 65 villa tr. & 10 pemberton place (adjacent lots)Details
temporary shoring south, north, west side of lot. separate shoring permits for 65 villa tr. & 10 pemberton place (adjacent lots) | |
| May 23, 2007 | Never finaled issued Jul 2007, no final | 65 Villa Tr | tie back installation for new construction at adjoining lot on 1391 clayton st., tie backs under yard.(tie back encroachment from 1391 clayton street.)Details
tie back installation for new construction at adjoining lot on 1391 clayton st., tie backs under yard.(tie back encroachment from 1391 clayton street.) | |
| Feb 16, 2007 | Completed final sign-off Nov 2007 | 711 Lincoln Wy | replace kitchen avinets and applian es to five units replace bathroom fkixtures and tile to four unkts replace windows sashes to one unit to match surroundings #2, add new hardwood floors to one unit #1Details
replace kitchen avinets and applian es to five units replace bathroom fkixtures and tile to four unkts replace windows sashes to one unit to match surroundings #2, add new hardwood floors to one unit #1 | $60,000 |
| Jan 10, 2007 | Completed final sign-off Jun 2016 | 497 Valley St | to erect a new 3 story single family dwelling unitDetails
to erect a new 3 story single family dwelling unit | $680,000 |
| Dec 28, 2006 | Completed final sign-off Mar 2007 | 483 Valley St | reroofingDetails
reroofing | $3,000 |
| Nov 2, 2006 | Completed final sign-off Jan 2007 | 446 Castenada Av | kchn remodel. new elecrical plmg, insulation, drywall, cabinets, counter tops and appliances, relocate extg wndw, remove extg wall between livng and dining room. add new structural beam postsDetails
kchn remodel. new elecrical plmg, insulation, drywall, cabinets, counter tops and appliances, relocate extg wndw, remove extg wall between livng and dining room. add new structural beam posts | $60,000 |