Clark/Hathaway Dinwiddie A Joint Venture
- Based in
- Oakland
- On San Francisco permits
- Mar 2013 to Oct 2019
- Last 24 months
- 0 permits filed
23 permits since 2000: 15 completed, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 7 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 30, 2019 | Completed final sign-off Jul 2021 | 101 01st St | to obtain final inspection for work approved under pa#201303132080. all work is completeDetails
to obtain final inspection for work approved under pa#201303132080. all work is complete | |
| Jul 2, 2018 | Never finaled issued Jul 2018, no final | 101 01st St | revision to app#201301132080 s3 and 201605056637. added gasline and riser from level 2 to level 61. added 2 hours fire rated enclosure for the added gas riser. n/a for maherDetails
revision to app#201301132080 s3 and 201605056637. added gasline and riser from level 2 to level 61. added 2 hours fire rated enclosure for the added gas riser. n/a for maher | $65,000 |
| Jun 6, 2018 | Completed final sign-off Sep 2019 | 101 01st St | 63rd fl - revision to pa 2017-0317-1743 track for building maintenance unit at tower top. attachment detail switched from bolted connection to welded detailDetails
63rd fl - revision to pa 2017-0317-1743 track for building maintenance unit at tower top. attachment detail switched from bolted connection to welded detail | |
| Jun 4, 2018 | Never finaled issued Jul 2018, no final | 101 01st St | install (n) 2"mg from 2nd floor ceiling to 61st floor kitchen fixtures. reference pa #201303132080s3. maher n/aDetails
install (n) 2"mg from 2nd floor ceiling to 61st floor kitchen fixtures. reference pa #201303132080s3. maher n/a | $3,000 |
| Apr 17, 2018 | Never finaled issued Jun 2018, no final | 101 01st St | added tenant low mid-rise elevator stops on levels 3,4 & 6. reference pa# 201301132080 & 201605056637.Details
added tenant low mid-rise elevator stops on levels 3,4 & 6. reference pa# 201301132080 & 201605056637. | $500,000 |
| Mar 9, 2018 | Never finaled issued Mar 2018, no final | 101 01st St | revision to 201605056637 to divide common tenant locker toom into serperate men's & women's lockerrooms at level p3Details
revision to 201605056637 to divide common tenant locker toom into serperate men's & women's lockerrooms at level p3 | $10,000 |
| Feb 16, 2018 | Completed final sign-off Sep 2019 | 101 01st St | defered structural, electrical & plumbing for landscape - reference pa#2017-1019-1690 & site permit pa#2013-0313-2080.Details
defered structural, electrical & plumbing for landscape - reference pa#2017-1019-1690 & site permit pa#2013-0313-2080. | |
| Feb 14, 2018 | Never finaled issued May 2018, no final | 101 01st St | deferred fire sprinkler permit for added car stackers. reference permit application #2017/0613/9224. ** maher: n/a **Details
deferred fire sprinkler permit for added car stackers. reference permit application #2017/0613/9224. ** maher: n/a ** | $30,000 |
| Feb 7, 2018 | Completed final sign-off May 2019 | 101 01st St | 2 monument signs for salesforce tower sign type tn.01, tn.02. maher naDetails
2 monument signs for salesforce tower sign type tn.01, tn.02. maher na | $5,000 |
| Sep 20, 2017 | Never finaled issued Feb 2018, no final | 101 01st St | electric wall sign for salesforce tower; installed atop canopyDetails
electric wall sign for salesforce tower; installed atop canopy | $2,000 |
| Sep 20, 2017 | Completed final sign-off Apr 2018 | 101 01st St | exterior signage for saleforce, set into pavers on ground.Details
exterior signage for saleforce, set into pavers on ground. | $2,000 |
| Jun 13, 2017 | Never finaled issued Jun 2018, no final | 101 01st St | the project will proving transbay tower with parking stackers as approved under pa/#2013031320850-s. this permit is for equipment/structural only. n/a for maher ordiannce. sprinkler system revisions under separate applicationDetails
the project will proving transbay tower with parking stackers as approved under pa/#2013031320850-s. this permit is for equipment/structural only. n/a for maher ordiannce. sprinkler system revisions under separate application | |
| Jan 30, 2017 | Completed final sign-off Apr 2018 | 101 01st St | revision to 201303132080 s3 to update fire fighters smoke control panel & elevator lighting, outlets maher naDetails
revision to 201303132080 s3 to update fire fighters smoke control panel & elevator lighting, outlets maher na | |
| Aug 16, 2016 | Completed final sign-off Apr 2018 | 101 01st St | revision to pa# 2013/12/19/4603-r1. phase ii - shoring. installation of jet grout columns, sealant pies rc slab to support excavation for repair of lbes. monitoring plan for lbe excavation shoring & construction sequence. ** maher: n/a **Details
revision to pa# 2013/12/19/4603-r1. phase ii - shoring. installation of jet grout columns, sealant pies rc slab to support excavation for repair of lbes. monitoring plan for lbe excavation shoring & construction sequence. ** maher: n/a ** | $70,000 |
| May 5, 2016 | Completed final sign-off Apr 2018 | 101 01st St | revision to architectural and mep addendum reference pa#201303132080 s-3. ** maher: n/a **Details
revision to architectural and mep addendum reference pa#201303132080 s-3. ** maher: n/a ** | |
| Jun 26, 2015 | Completed final sign-off Aug 2017 | 101 01st St | erect tower crane 2 along 1st street. sow includes furnishing, installing, jumping, and dismantiling liebher. 542 hc-l litronic tower crane. ref app#201303132080. n/a for maher ordinance.Details
erect tower crane 2 along 1st street. sow includes furnishing, installing, jumping, and dismantiling liebher. 542 hc-l litronic tower crane. ref app#201303132080. n/a for maher ordinance. | $125,000 |
| Jun 26, 2015 | Completed final sign-off Aug 2017 | 101 01st St | erect tower crane 1 at corner of mission and fremont street. sow includes furnishing, installing, jumping, and dismantiling liebher. 542 hc.l litronic tower crane. ref app#201303132080. n/a for maher ordinance.Details
erect tower crane 1 at corner of mission and fremont street. sow includes furnishing, installing, jumping, and dismantiling liebher. 542 hc.l litronic tower crane. ref app#201303132080. n/a for maher ordinance. | $125,000 |
| Nov 14, 2014 | Completed final sign-off Jun 2017 | 101 01st St | install underground fire services only, two 8-inch fire services, one off of 8-inch main on 1st st and one off of 12-inch main on mission st. (mission & 1st street)Details
install underground fire services only, two 8-inch fire services, one off of 8-inch main on 1st st and one off of 12-inch main on mission st. (mission & 1st street) | $35,000 |
| Jul 22, 2014 | Expired or cancelled withdrawn Dec 2014 | 101 01st St | revision to pa 201312194603, excavation & shoring; revised excavation & shoring on levels a-d, revise shoring connection detatils; maher n/a (health approved previous appn)Details
revision to pa 201312194603, excavation & shoring; revised excavation & shoring on levels a-d, revise shoring connection detatils; maher n/a (health approved previous appn) | $100,000 |
| Jan 7, 2014 | Completed final sign-off Jan 2015 | 101 01st St | revision to 201308083906. add another test load bearing element, schedule and details. plan will show location of test caisson and ostenberg cell bi directional load tests will be performed. compliance with ordinance no 155-13 required. excavation >50 yd - (see exempt letter from health dept)Details
revision to 201308083906. add another test load bearing element, schedule and details. plan will show location of test caisson and ostenberg cell bi directional load tests will be performed. compliance with ordinance no 155-13 required. excavation >50 yd - (see exempt letter from health dept) | $20,000 |
| Dec 19, 2013 | Completed final sign-off Aug 2017 | 101 01st St | excavation & shoring only. cdsm, bracing, tie back. compliance with ordinance no# 155-13 exempted. approval from dph attached.Details
excavation & shoring only. cdsm, bracing, tie back. compliance with ordinance no# 155-13 exempted. approval from dph attached. | $100,000 |
| Aug 8, 2013 | Completed final sign-off Jan 2015 | 101 01st St | rev. to pa#201303202641 test load bearing element schedule and details.Details
rev. to pa#201303202641 test load bearing element schedule and details. | |
| Mar 13, 2013 | Completed final sign-off Jul 2021 | 101 01st St | to erect 63 stories with 3 basements, office, retail, parking building.Details
to erect 63 stories with 3 basements, office, retail, parking building. | $272,000,000 |