Cjb Communications Inc
- Based in
- Woodland
- On San Francisco permits
- Jan 2014 to Aug 2026
- Last 24 months
- 3 permits filed
6 permits since 2000: 2 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2026 | In progress issued Aug 2026 | 2300 Sutter St | revision to 202507301916: (t-mobile) revision to steel beam connection @ rooftop, steel beam end is short, need to add to beam to reach connection pointDetails
revision to 202507301916: (t-mobile) revision to steel beam connection @ rooftop, steel beam end is short, need to add to beam to reach connection point | |
| Jul 16, 2026 | In progress issued Jul 2026 | 2300 Sutter St | revision 202507301916- changes include replace (e) 100amp panel with (n) 200 amp panel. install (n) 200 amp subpanel. structural saddle connection between (n) column and (n) beam. blocking at stud steal wallDetails
revision 202507301916- changes include replace (e) 100amp panel with (n) 200 amp panel. install (n) 200 amp subpanel. structural saddle connection between (n) column and (n) beam. blocking at stud steal wall | |
| Jul 30, 2025 | In progress issued May 2026 | 2300 Sutter St | remove of existing antenna, install 6 (n) antennas within (3) (n) frp boxes. remove (1) cabinet, install (2) (n) cabinets, (1) (net cabinet gain). install (1) (n) 200 amp breaker inside (e) panel, remove and replace (16) batteries with (16) new batteriesDetails
remove of existing antenna, install 6 (n) antennas within (3) (n) frp boxes. remove (1) cabinet, install (2) (n) cabinets, (1) (net cabinet gain). install (1) (n) 200 amp breaker inside (e) panel, remove and replace (16) batteries with (16) new batteries | $87,000 |
| Nov 7, 2016 | Completed final sign-off Mar 2018 | 2690 Geary Bl | verizon: modify an (e) roof site: install 700 & aws-1 rrus. add 3 pcs rrus 12&a2 units & associated cabling @ (e) antenna sector. all behind (e) frp screen. previous work done under 2014-0107-5705. maher n/aDetails
verizon: modify an (e) roof site: install 700 & aws-1 rrus. add 3 pcs rrus 12&a2 units & associated cabling @ (e) antenna sector. all behind (e) frp screen. previous work done under 2014-0107-5705. maher n/a | $20,000 |
| Jan 8, 2016 | Completed final sign-off Jan 2018 | 601 Van Ness Av | replace e (9) antennas with new antennas add 18 rru total units to penthouse wall, add 3 raycaps to penthouse wall and 3 inside shelter . add 1 microwave dish and frp screen box over antennas verizon wireless. maher n/aDetails
replace e (9) antennas with new antennas add 18 rru total units to penthouse wall, add 3 raycaps to penthouse wall and 3 inside shelter . add 1 microwave dish and frp screen box over antennas verizon wireless. maher n/a | $40,000 |
| Jan 7, 2014 | Never finaled issued Nov 2017, no final | 2690 Geary Bl | verizon wireless proposes to replace three existing lte antennas w/ three new dual-bond antennas, add three new rrh units, raycap surge protection devices, hybrid and ret cables.Details
verizon wireless proposes to replace three existing lte antennas w/ three new dual-bond antennas, add three new rrh units, raycap surge protection devices, hybrid and ret cables. | $18,000 |