City Graphics Solutions Llc
- Based in
- Hayward
- On San Francisco permits
- Aug 2021 to Feb 2025
- Last 24 months
- 2 permits filed
3 permits since 2000: 2 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 6, 2025 | In progress issued Feb 2025 | 151 Warriors Wy | print, install, and remove temporary branding on building for globally televised event. sign is perforated vinyl 70/30 ratio with removable adhesive dual paper liner.Details
print, install, and remove temporary branding on building for globally televised event. sign is perforated vinyl 70/30 ratio with removable adhesive dual paper liner. | $15,000 |
| Feb 6, 2025 | In progress issued Feb 2025 | 1725 03rd St | print, install, and remove temporary branding on building for globally televised event. sign is perforated vinyl 70/30 ratio with removable adhesive dual paper liner.Details
print, install, and remove temporary branding on building for globally televised event. sign is perforated vinyl 70/30 ratio with removable adhesive dual paper liner. | $15,000 |
| Aug 18, 2021 | Never finaled issued Aug 2021, no final | 435 23rd St | installation of new led exterior sign for amazon distribution centerDetails
installation of new led exterior sign for amazon distribution center | $10,000 |