City Construction Group
- Based in
- Calistoga
- On San Francisco permits
- Feb 2019 to Feb 2022
- Last 24 months
- 0 permits filed
15 permits since 2000: 15 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 11, 2022 | Completed final sign-off Sep 2022 | 2271 15th Av | replace 1st floor window 6 foot wide with 3 foot wide door (in the rear) and infill door on side elevation (south). approved bpa 202101072281Details
replace 1st floor window 6 foot wide with 3 foot wide door (in the rear) and infill door on side elevation (south). approved bpa 202101072281 | $100 |
| Sep 3, 2021 | Completed final sign-off Nov 2021 | 494 27th Av | unit #23 kitchen remodelingDetails
unit #23 kitchen remodeling | $8,500 |
| Aug 27, 2021 | Completed final sign-off Oct 2021 | 4052 25th St | bathroom remodeling: install new bathrub,vanity, drywall, tiles. relocate the drains & water supply lines.Details
bathroom remodeling: install new bathrub,vanity, drywall, tiles. relocate the drains & water supply lines. | $17,000 |
| Jan 26, 2021 | Completed final sign-off Feb 2022 | 900 Presidio Av | unit # 5: remodel existing 1 bathroom and 1 kitchen in the same location. no wall demoolition,; finish only; no change in the lay out and opening.Details
unit # 5: remodel existing 1 bathroom and 1 kitchen in the same location. no wall demoolition,; finish only; no change in the lay out and opening. | $6,500 |
| Jan 7, 2021 | Completed final sign-off Sep 2022 | 2271 15th Av | one new adu within the existing envelope.Details
one new adu within the existing envelope. | $88,900 |
| Aug 21, 2020 | Completed final sign-off Sep 2021 | 3678 16th St | revision to approved pa# 201912189918: reconfiguration at all floors; including relocation of kitchens and bathrooms and elimination of 1 bathroom. project is currently in initial stages of construction.Details
revision to approved pa# 201912189918: reconfiguration at all floors; including relocation of kitchens and bathrooms and elimination of 1 bathroom. project is currently in initial stages of construction. | |
| Aug 20, 2020 | Completed final sign-off Nov 2022 | 1026 Capp St | revision to 201911076685. separate lower 2 story unit into 2 separate units. install 1 additonal kitchen. remove 1/2 bath at 1st fl and install 2 new baths. reconstruct exterior stair from 3rd and 2nd fl in rear. project is currently in initial stages of constructionDetails
revision to 201911076685. separate lower 2 story unit into 2 separate units. install 1 additonal kitchen. remove 1/2 bath at 1st fl and install 2 new baths. reconstruct exterior stair from 3rd and 2nd fl in rear. project is currently in initial stages of construction | $4,500 |
| Dec 18, 2019 | Completed final sign-off Sep 2021 | 3678 16th St | 1/fl: convert extg workshop & storage space into 1 dwelling unit, extg garage to remain. 2/fl: remodel 1 extg bathroom & construct 3 nw bathrooms, remodel kitchen. 3rd fl: remodel 1 extg bathroom & construct 2 nw bathrms, remodel kitchen. repair of bldg: reconstruct in kind severly decayed dryrotDetails
1/fl: convert extg workshop & storage space into 1 dwelling unit, extg garage to remain. 2/fl: remodel 1 extg bathroom & construct 3 nw bathrooms, remodel kitchen. 3rd fl: remodel 1 extg bathroom & construct 2 nw bathrms, remodel kitchen. repair of bldg: reconstruct in kind severly decayed dryrot | $178,000 |
| Nov 26, 2019 | Completed final sign-off Nov 2022 | 1454 South Van Ness Av | unit #3: relocate and remodel kitchen & full bathroom. construct new 3/4 bathroom. replace deteriorated wood (dryrot) in kind. replace existing gypsum board where required for plumbing and electrical lines (in kind).adding one bedroom on second floorDetails
unit #3: relocate and remodel kitchen & full bathroom. construct new 3/4 bathroom. replace deteriorated wood (dryrot) in kind. replace existing gypsum board where required for plumbing and electrical lines (in kind).adding one bedroom on second floor | $27,500 |
| Nov 19, 2019 | Completed final sign-off Jun 2021 | 811 Oak St | comply with nov 201972231 and 20199267 replace in kind dryrot in walls and interior floors not visible from street. 811 oak: remodel kitchen and 2 bathrooms. 813 oak:remodel kitchen and 2 bathrooms. 815 oak: remodel kitchen and 3 bathrooms. all in kind & no wall movement. no fire alarm & sprklr sysDetails
comply with nov 201972231 and 20199267 replace in kind dryrot in walls and interior floors not visible from street. 811 oak: remodel kitchen and 2 bathrooms. 813 oak:remodel kitchen and 2 bathrooms. 815 oak: remodel kitchen and 3 bathrooms. all in kind & no wall movement. no fire alarm & sprklr sys | $200,000 |
| Nov 7, 2019 | Completed final sign-off Nov 2022 | 1026 Capp St | 1st floor: incorporate extg workroom & storage space into extg lower unit. 2nd floor: remodel extg bathroom & construct new bathroom; remodel extg kitchen. 3rd floor: remodel extg bathroom & construct new bathroom; remodel extg kitchen. all floors: reconstruct in severely decayed (dryrot)roof,Details
1st floor: incorporate extg workroom & storage space into extg lower unit. 2nd floor: remodel extg bathroom & construct new bathroom; remodel extg kitchen. 3rd floor: remodel extg bathroom & construct new bathroom; remodel extg kitchen. all floors: reconstruct in severely decayed (dryrot)roof, | $123,600 |
| Oct 15, 2019 | Completed final sign-off Jun 2020 | 753 Capp St | 3rd story work: revision to app#201905069834. rebuilt framing of the rear portion of the bldg which was in severely decayed condition (dryrot) size in plan 6'-4"x21'-6". rebuilding to be in kind. replace extg interior finishes of gypsum plaster with 5/8" typex gypsum board.Details
3rd story work: revision to app#201905069834. rebuilt framing of the rear portion of the bldg which was in severely decayed condition (dryrot) size in plan 6'-4"x21'-6". rebuilding to be in kind. replace extg interior finishes of gypsum plaster with 5/8" typex gypsum board. | $21,400 |
| Sep 19, 2019 | Completed final sign-off Oct 2019 | 811 Oak St | comply with nov 201972231, #12,2,11. replace in kind t-1-11 plywood siding in rear. total 6" x 22' = 11 sqft. repair door locks as required. repaint pipes on exterior as required.Details
comply with nov 201972231, #12,2,11. replace in kind t-1-11 plywood siding in rear. total 6" x 22' = 11 sqft. repair door locks as required. repaint pipes on exterior as required. | $420 |
| May 6, 2019 | Completed final sign-off Jun 2020 | 753 Capp St | 1st fl - relocation of existing unit 753a from 3rd fl; 3rd fl - 753b kitchen remodel, additionof 1 3/4 bathroom, replacement of 1 existing full bathroom with 1 3/4 bathroom, relocation of 1 existing full bathroom, general renovation of 3rd fl residential unitDetails
1st fl - relocation of existing unit 753a from 3rd fl; 3rd fl - 753b kitchen remodel, additionof 1 3/4 bathroom, replacement of 1 existing full bathroom with 1 3/4 bathroom, relocation of 1 existing full bathroom, general renovation of 3rd fl residential unit | $114,500 |
| Feb 12, 2019 | Completed final sign-off Jan 2020 | 565 Page St | construction of one accessory dwelling unit (adu) at the 1st floor. proposed unit includes one habitable room, kitchen and 3/4 bathroom under ordinance no. 162-16Details
construction of one accessory dwelling unit (adu) at the 1st floor. proposed unit includes one habitable room, kitchen and 3/4 bathroom under ordinance no. 162-16 | $43,500 |