Ciaran Breen Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2006 to Oct 2010
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2010 | Completed final sign-off Aug 2011 | 167 Vicksburg St | build a deck at the rear of property on top of the existing garage.Details
build a deck at the rear of property on top of the existing garage. | $12,000 |
| Apr 14, 2010 | Completed final sign-off May 2010 | 273 Chestnut St | revise pa#200807176921: change handrail from metal to timber. no special inspection for welds, stair and railing system.Details
revise pa#200807176921: change handrail from metal to timber. no special inspection for welds, stair and railing system. | |
| Apr 3, 2009 | Completed final sign-off Apr 2009 | 36 Calhoun Tr | repair rim joist on existing deck. also, some joist and ledger. misc. decking to be replace. totala work under this permit to be a maximum of 50% or less. to mitigate nov. #200875121Details
repair rim joist on existing deck. also, some joist and ledger. misc. decking to be replace. totala work under this permit to be a maximum of 50% or less. to mitigate nov. #200875121 | $1,000 |
| Jul 17, 2008 | Completed final sign-off May 2010 | 273 Chestnut St | addition of guardrail at extg roof edge with new roof deck, replace wndw in exg third story cupola with a new door to provide access to roof. new door will not be visible from streetDetails
addition of guardrail at extg roof edge with new roof deck, replace wndw in exg third story cupola with a new door to provide access to roof. new door will not be visible from street | $26,000 |
| Apr 10, 2008 | Completed final sign-off May 2008 | 210 Beacon St | repair a portion of the planks on a deck that have been subject to water run off from a planters. less than 50% repair free standine deck.Details
repair a portion of the planks on a deck that have been subject to water run off from a planters. less than 50% repair free standine deck. | $1,500 |
| Nov 2, 2006 | Completed final sign-off Dec 2006 | 2230 Divisadero St | comply with 3r report app 34-4556Details
comply with 3r report app 34-4556 | $5,000 |