Chau Construction
- Based in
- Castro Valley
- On San Francisco permits
- May 2000 to Jun 2015
- Last 24 months
- 0 permits filed
30 permits since 2000: 26 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2015 | Completed final sign-off Jun 2016 | 315 Chenery St | new deck (rear) of approximately 300 sq ft on 1st & 2nd floor on the rear of the building & a new stsirs from ground to 2nd floor in lieu of the existing stairs.Details
new deck (rear) of approximately 300 sq ft on 1st & 2nd floor on the rear of the building & a new stsirs from ground to 2nd floor in lieu of the existing stairs. | $45,000 |
| Apr 22, 2015 | Completed final sign-off Jun 2016 | 315 Chenery St | voluntary upgrade of foundation & adding a family room to basement, movement of some walls & interior stairs connecting 1st & 2nd flr. all work within existing footprintDetails
voluntary upgrade of foundation & adding a family room to basement, movement of some walls & interior stairs connecting 1st & 2nd flr. all work within existing footprint | $85,000 |
| Apr 10, 2015 | Completed final sign-off Apr 2015 | 238 Divisadero St | unit a: to comply with his nov 201536261 dated 3/26/2015 repair exterior stair, not to exceed 50%, outlet & countertop stoveDetails
unit a: to comply with his nov 201536261 dated 3/26/2015 repair exterior stair, not to exceed 50%, outlet & countertop stove | $1,000 |
| Oct 7, 2014 | Completed final sign-off Dec 2014 | 238 Divisadero St | b- replacing kitchen cabinet & adding electrical outlet, replace bathroom vanity.Details
b- replacing kitchen cabinet & adding electrical outlet, replace bathroom vanity. | $3,500 |
| Mar 6, 2014 | Completed final sign-off Apr 2014 | 962 Page St | repairing existing decks, the stair strigers posts & paints. less than 50%. work in back deck & stairs.Details
repairing existing decks, the stair strigers posts & paints. less than 50%. work in back deck & stairs. | $6,000 |
| Mar 5, 2014 | Completed final sign-off May 2014 | 1569 Leavenworth St | demolishing the self service laundrymat. removing upper wall over washing machine hook ups sheetrock and studs to ceiling only.Details
demolishing the self service laundrymat. removing upper wall over washing machine hook ups sheetrock and studs to ceiling only. | $3,000 |
| Jul 19, 2012 | Completed final sign-off Aug 2012 | 1250 Vallejo St | to comply with nov # 201245962. remodeling kitchen and bathroom. replace cabinets, sink top plumbing system, tub, faucet, vanity and electricalDetails
to comply with nov # 201245962. remodeling kitchen and bathroom. replace cabinets, sink top plumbing system, tub, faucet, vanity and electrical | $15,000 |
| Jul 1, 2011 | Completed final sign-off Jan 2012 | 2094 32nd Av | playroom addition on garage level with new bath room.Details
playroom addition on garage level with new bath room. | $35,000 |
| May 3, 2010 | Never finaled issued May 2010, no final | 2008 Leavenworth St | interior renovations w/in one unit per plan. enlarge 2-windows facing street. selective alterations & structural upgrades to interior partitions. compensatory /voluntary wall sheeting.Details
interior renovations w/in one unit per plan. enlarge 2-windows facing street. selective alterations & structural upgrades to interior partitions. compensatory /voluntary wall sheeting. | $20,000 |
| Apr 20, 2010 | Expired or cancelled expired Nov 2011 | 2008 Leavenworth St | remodeling unit 2008. kitchen & bathroom, electrical work. provide high efficacy lighting per cec 8151 (k).Details
remodeling unit 2008. kitchen & bathroom, electrical work. provide high efficacy lighting per cec 8151 (k). | $18,000 |
| Oct 15, 2009 | Completed final sign-off Mar 2010 | 1733 Stockton St | remodeling kitchen, upgrade electrical and plumbing, replacing cabinets, faucet and sink, non structural workDetails
remodeling kitchen, upgrade electrical and plumbing, replacing cabinets, faucet and sink, non structural work | $8,000 |
| Feb 12, 2009 | Completed final sign-off Aug 2009 | 3110 Clay St | #1- remodeling 1 kitchen & 1 bathroom. replace cabinets, tub, sink vanity & fgi outlet. non structural work.Details
#1- remodeling 1 kitchen & 1 bathroom. replace cabinets, tub, sink vanity & fgi outlet. non structural work. | $20,000 |
| Jan 6, 2009 | Completed final sign-off Apr 2009 | 3110 Clay St | unit #2 - remodeling kitche & bathroom. replacing cabinets, tub sink, vanity. not wall removing. kitchen floor area = 10x10=150sf. in kind.Details
unit #2 - remodeling kitche & bathroom. replacing cabinets, tub sink, vanity. not wall removing. kitchen floor area = 10x10=150sf. in kind. | $25,250 |
| Sep 16, 2008 | Completed final sign-off Apr 2009 | 3110 Clay St | add bathrooms on units 2, 4, 6 ( 1st, 2nd, 3rd floors respectively). relocate w/d of these units to ground fl. new stacked w/d in these units. interior only. no structural changes.Details
add bathrooms on units 2, 4, 6 ( 1st, 2nd, 3rd floors respectively). relocate w/d of these units to ground fl. new stacked w/d in these units. interior only. no structural changes. | $25,000 |
| Sep 4, 2008 | Completed final sign-off Apr 2009 | 3110 Clay St | unit #4 - remodeling 1 kitchen & 1 bathroom. replacing cabinets, faucets, sink, tub & vanity.Details
unit #4 - remodeling 1 kitchen & 1 bathroom. replacing cabinets, faucets, sink, tub & vanity. | $21,000 |
| Aug 27, 2008 | Completed final sign-off Apr 2009 | 3110 Clay St | work @ unit# 6 only.Details
work @ unit# 6 only. | $15,000 |
| May 30, 2008 | Completed final sign-off Aug 2008 | 1021 Hayes St | replace exist single pane front window into double panes window without changing window trims/mounting. replace damage slash in kind. replace a total of 16 front windows.Details
replace exist single pane front window into double panes window without changing window trims/mounting. replace damage slash in kind. replace a total of 16 front windows. | $4,000 |
| May 29, 2008 | Completed final sign-off Aug 2008 | 1021 Hayes St | renovate (e) master bath carbinet, remodel 2 bedroom doors w/transome glass panel (window) on top & construct 2 new closets on the 2nd floor.Details
renovate (e) master bath carbinet, remodel 2 bedroom doors w/transome glass panel (window) on top & construct 2 new closets on the 2nd floor. | $8,000 |
| May 23, 2008 | Completed final sign-off Sep 2008 | 2022 Leavenworth St | renew pa# 2006/09/07/1609, pa# 2006/11/28/8620 & pa# 2007/06/07/3323 for final inspection only.Details
renew pa# 2006/09/07/1609, pa# 2006/11/28/8620 & pa# 2007/06/07/3323 for final inspection only. | |
| May 23, 2008 | Completed final sign-off Sep 2008 | 2022 Leavenworth St | renew pa# 2007/01/19/5922, pa# 2006/10/17/5314 & pa# 2006/09/21/3034 for final inspection only.Details
renew pa# 2007/01/19/5922, pa# 2006/10/17/5314 & pa# 2006/09/21/3034 for final inspection only. | |
| Oct 19, 2007 | Never finaled issued Oct 2007, no final | 2022 Leavenworth St | revsion to permit under construction. pa# 2006/11/28/8620 & pa# 2007/06/07/3323. replacing front windows. visiable from the street. 10 windows on 2nd floor only. u = 0.57.Details
revsion to permit under construction. pa# 2006/11/28/8620 & pa# 2007/06/07/3323. replacing front windows. visiable from the street. 10 windows on 2nd floor only. u = 0.57. | $8,000 |
| Sep 20, 2007 | Completed final sign-off Nov 2007 | 2727 Jackson St | work @ unit# a only. remodel bathroom. replace tub, faucet, vanity, light & fan. provide fluorescent lights or occupancy sensor in bathroom.Details
work @ unit# a only. remodel bathroom. replace tub, faucet, vanity, light & fan. provide fluorescent lights or occupancy sensor in bathroom. | $6,500 |
| Aug 10, 2007 | Completed final sign-off Nov 2007 | 2727 Jackson St | work @ unit# 3 only. remodel bathroom & kitchen. tub, vanity, electrical. kitchen new cabinets, sink, outlets.Details
work @ unit# 3 only. remodel bathroom & kitchen. tub, vanity, electrical. kitchen new cabinets, sink, outlets. | $20,000 |
| Jul 16, 2007 | Completed final sign-off Nov 2007 | 2727 Jackson St | work @ unit# 1 only. remodel bathroom & kitchen. 50% lighting shall be florescent.Details
work @ unit# 1 only. remodel bathroom & kitchen. 50% lighting shall be florescent. | $15,000 |
| Sep 7, 2006 | Never finaled issued Sep 2006, no final | 2022 Leavenworth St | unit #2022 remodeling (1) bathroom & (1) kitchen, replacing drainage pipes , add one electrical subpanel. unit#2024: remodeling (1) bathroom only.Details
unit #2022 remodeling (1) bathroom & (1) kitchen, replacing drainage pipes , add one electrical subpanel. unit#2024: remodeling (1) bathroom only. | $20,000 |
| Apr 29, 2005 | Completed final sign-off Jun 2005 | 1037 York St | remodel kichen/replacing cbnts fuacet sink and electrical outletDetails
remodel kichen/replacing cbnts fuacet sink and electrical outlet | $8,000 |
| Apr 27, 2005 | Completed final sign-off Jul 2005 | 280 28th St | remodel the bathroom and two kitchens replace the tub tiles vanity faucets sink cabinets and hoodsDetails
remodel the bathroom and two kitchens replace the tub tiles vanity faucets sink cabinets and hoods | $14,000 |
| Feb 23, 2004 | Completed final sign-off May 2004 | 2094 32nd Av | remodel kitchen & electrical service. no structural work.Details
remodel kitchen & electrical service. no structural work. | $8,500 |
| Jul 31, 2001 | Completed final sign-off Dec 2001 | 747 Chestnut St | remodeling the bathroom,switch toilet & vanity. relocated electrical outlet. replace tub.Details
remodeling the bathroom,switch toilet & vanity. relocated electrical outlet. replace tub. | $4,000 |
| May 10, 2000 | Completed final sign-off Oct 2000 | 1586 32nd Av | consruction of one bedroom, study and a bath on basement floorDetails
consruction of one bedroom, study and a bath on basement floor | $15,000 |