Charles R. Wittmer Construction
- Based in
- Santa Rosa
- On San Francisco permits
- Jan 2006 to Sep 2009
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2009 | Completed final sign-off Oct 2009 | 3821 Cesar Chavez St | general contractor replaced 2"x6" deck joists with pressure treated redwood 2x6 deck joists without a building permit in nov 2008. replace in kind, less than 50%Details
general contractor replaced 2"x6" deck joists with pressure treated redwood 2x6 deck joists without a building permit in nov 2008. replace in kind, less than 50% | $3,000 |
| Aug 9, 2006 | Completed final sign-off Oct 2006 | 3821 Cesar Chavez St | remove (e) plaster, tile & bath fixtures, re-sheetrock, new tiles, new plubing fixtures, light fixtures at bathroom. bathroom remodel. flourescent lighting.Details
remove (e) plaster, tile & bath fixtures, re-sheetrock, new tiles, new plubing fixtures, light fixtures at bathroom. bathroom remodel. flourescent lighting. | $9,500 |
| Mar 22, 2006 | Completed final sign-off Aug 2006 | 3823 Cesar Chavez St | demo pantry & bathroom. add 2 windows & enlarge (e) window. resident. no windows visible from street.Details
demo pantry & bathroom. add 2 windows & enlarge (e) window. resident. no windows visible from street. | $21,000 |
| Jan 27, 2006 | Completed final sign-off Jul 2006 | 3823 Cesar Chavez St | tear out (e) bathroom. move tub & toilet to other (e) wall. new tile & drywall. flourcescent lighting. top floor.Details
tear out (e) bathroom. move tub & toilet to other (e) wall. new tile & drywall. flourcescent lighting. top floor. | $11,000 |