Chan Construction
- Based in
- San Leandro
- On San Francisco permits
- Feb 2017 to Feb 2017
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 17, 2017 | Never finaled issued Feb 2017, no final | 632 Hyde St | to complyt with nov # 201757152, replace gas heater w/similar model /size/fittings remove electric heater, replace back window single pane w/double pane in kind (2)Details
to complyt with nov # 201757152, replace gas heater w/similar model /size/fittings remove electric heater, replace back window single pane w/double pane in kind (2) | $2,600 |