Cesar Augusto Construction
- Based in
- Red Bluff
- On San Francisco permits
- Apr 2023 to Oct 2023
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 16, 2023 | In progress issued Oct 2023 | 1634 Sanchez St | replace 6 windows in front of building, same size, same location, interior is pine wood, exterior is aluminum clad wood. u=0.3Details
replace 6 windows in front of building, same size, same location, interior is pine wood, exterior is aluminum clad wood. u=0.3 | $5,000 |
| Apr 11, 2023 | Never finaled issued Apr 2023, no final | 1634 Sanchez St | old siding at front, all wall area below top of bay windows, to be replaced for same wood siding, and replace any dry rot framing. scaffold should be install on sidewalk, front of house.Details
old siding at front, all wall area below top of bay windows, to be replaced for same wood siding, and replace any dry rot framing. scaffold should be install on sidewalk, front of house. | $10,000 |