Century Commercial Service
- Based in
- Auburn
- On San Francisco permits
- Aug 2018 to Dec 2022
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 20, 2022 | Completed final sign-off Oct 2023 | 355 Ocean Av | install (5) new pole bases. install (5) new 14' tall poles. core bore to each pole base locations and to panel. run new wire, and install (5) new heads. install (3) wallpacks.Details
install (5) new pole bases. install (5) new 14' tall poles. core bore to each pole base locations and to panel. run new wire, and install (5) new heads. install (3) wallpacks. | $65,000 |
| Aug 22, 2018 | Never finaled issued Aug 2018, no final | 3700 Geary Bl | remove 4 100 w hps fixtures. install 4 naturaled lighting 29 w fxal. remove 19 100 w hps fixtures. install 19 naturaled lighting 29w fxalDetails
remove 4 100 w hps fixtures. install 4 naturaled lighting 29 w fxal. remove 19 100 w hps fixtures. install 19 naturaled lighting 29w fxal | $11,000 |