Cee Jay Industry
- Based in
- Pacheco
- On San Francisco permits
- Nov 2025 to Mar 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 1 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 3, 2026 | Completed final sign-off Apr 2026 | 1150 Lombard St | common area parking (lower/upper) - installation of 15 lvl 2 ev charging stations. (e) infrastructure was designed for future ev chargers. only 15 to be installed and energized. all others shown for future chargers, work includes mounting of chargers and install of associated branch circuit breakersDetails
common area parking (lower/upper) - installation of 15 lvl 2 ev charging stations. (e) infrastructure was designed for future ev chargers. only 15 to be installed and energized. all others shown for future chargers, work includes mounting of chargers and install of associated branch circuit breakers | $17,750 |
| Nov 24, 2025 | In progress issued Mar 2026 | 300 Berry St | new electrical infrastructure within an (e) parking garage, includes installation of service equipment, transformer, ev-dedicated panelboard, conduits and submetering. new electrical infrastructure construction to support future installation of up to 40 level 2 electric vehicle charging stations.Details
new electrical infrastructure within an (e) parking garage, includes installation of service equipment, transformer, ev-dedicated panelboard, conduits and submetering. new electrical infrastructure construction to support future installation of up to 40 level 2 electric vehicle charging stations. | $88,300 |